Decreasing The Scrap Level For Broken Thread - Final - Update
Decreasing The Scrap Level For Broken Thread - Final - Update
- ALL PROJECTS-
TRW Roman
DMAIC Define
Business Case and Project Goal:
WHAT : Decrease the scrap level for Damaged thread/Broken Thread Reject level (Lines reject)
WHY : Damaged thread and Broken thread - 90365 parts out of 243767 NOK (9803664 total parts) produced in all
production lines between CW01-CW25. => 0.92% from 2.49%.
Scrap Reduction/ decreasing level of waste from 90365 parts / 0.92% (~270000 €) to 60000 parts / 0.60% (~180000 €) , estimated
CW25 ÷ CW31
CW41 ÷ CW44
CW45 ÷ CW49
WHERE : ZF TRW ROMAN
Consistency and stability of the data collected will Production Leader will include all defects. All defects included
be ensured by Production Leader. into analyze will be recorded on boards available near the production
line.
3.Oiling system not known (maintenance level 1 not fully effective) – greifer part
4.Preventive maintenance instructions level 1 incomplete defined (oiling point for greifer is not defined for automatic machines)
5.Oiling system was not performed at reception of the machines in production area.
8.Errors in correct report for defect codes (replacement of some defect codes with other defect codes).
• Standardize sewing speed on all automatic machines form production lines to 1400 rot /min(FIAT 334.520 TAB si GM D2XX TAB) – 10.08.2016 - DONE
• Standardize sewing speed : low speed -140 si mid speed 1200 on all automatic machines(S-AM36/003/005/006 si S-AM36/0010/0015/0007) – 10.08.2016 - DONE
• Delete all existing additional sewing programs from automatic machines–10.08.2016 DONE
• Training for all operators in line about all oiling points (maintenance level 1) – 12.08.2016 DONE
• Oiling system (manual machines/automatic machines) –13.08.2016 – DONE
• Update MTM2 Study for Fiat 334/520 TAB – 19.08.2016 –done and GM D2XX TAB – 10.08.2016 DONE
• Training for PL regarding updated balancing of the lines – 22.08.2016 – done
• Monitor/comparison of accuracy about reporting the scrapped parts on shifts (pilot lines Fiat 356 TAB) – 19.08.2016 - done
Training on the job – operational criteria for Charging device for lower bobbin not
automatic machines not fully known working properly
Absenteeism – operators are pushed to cover lack Lower bobbin brake not fully effective
of personnel
Broken thread
Workload not respected in production line (MTM2
Thread not known/respected
Blunted needles
Secondary
Preventive Maintenance level 1,2 and 3 Root cause
Material not performed
Method Tools
6/13/2019
DMAIC Analyze
After Measure step, a structured list of possible solutions to each specific problem identified is shown below:
Machine
• Depreciated Equipment
- The charging system for lower bobbin are not efficient. The lower bobbin are not charged as it should (lower quantity of thread/incorrect weaving thread
load).
• Incorrect cut of the thread length after finish sewing (manual machine 301 seam) => first sewing steps, at seam start, are often skipped (not tangled).
• Inappropriate changing needle rule in case of seams with long backstitch. (Higher needle usage)
• Lower bobbin brake system not fully effective (for automatic machines). Inertia impact.
• Presser foot and needle not protected against contact with sewing frames ( automatic machines). 7 interventions in 4 weeks on pilot projects and 128
interventions in 11 weeks – plant level.
Man
• Lack of triggering signal for changing the lower bobbin when thread is finished (manual machine – seam 301)
• Movement of the operators between stations, without being confirmed on operation (Qualification Matrix not followed).
• High absenteeism.
•Training on the job not fully defined and with minimum supervision.
Material
• Thread (many times deteriorated thread defect is being removed only by changing the thread bobbin).
Methods
• MTM 2 studies not respected/not known in production lines.(Skipping work elements due to less operators than standard - ME defined).
• Oiling system not taken into consideration at reception of the machines –manual and automatic - (oiling system is empty).
• Maintenance level 1 instructions incomplete – E.g. 3 out of 4 oiling points specified in instruction.
• Preventive and predictive maintenance not planned nor performed for pilot production lines.
13 June 2019 Business unit, Presentation title
DMAIC Improve
Action to be implemented at plant level
1. Revision for all charging system for lower bobbin (manual/automatic machines) –24.12.2016.
2. Implement counter for number of stitch for seam 301 (manual machines) – 24.12.2016
Actual – implemented on 57 manual machines (only for thorax projects)
To be performed – KAB (34 manual machines) / DAB (19 manual machines) / PAB (21 manual machines) and on 7 manual machines from TAB Projects
3. Implement presser foot / needle protection for all automatic machines ( 134 machines) 01.01.2017
4. Update maintenance level 1 instructions in order to specify all oiling points on automatic machines –24.12.2016
5. Preload /Refill all oil tanks for automatic/manual machines –24.12.2016
6. Training for all production leaders to apply line balancing according to MTM2 in case of lack of personnel –01.01.2017
7. Change rule for changing period of the needle when existing long backstitches (ex: Fiat 334.520 TAB / PQ25 HTAB / Fiat 356.Alfa 952 TAB / Alfa 949 NAFTA
TAB ) 24.12.2016
8. Implement 1 small stitch on automatic machines from sewing program for staple seam , unload seam , tear seam , standard seam .
9. Update checklist at machine handover to production area for preload/fill oil tanks/system for manual/automatic machines 24.12.2016
10.Implement retaining clip for length of thread after cutting is performed (between sewing steps).
Risks :
- Implementation of counter for manual machines without an effective training and without supervision ,will conduct to higher scrap rate and not to use this
counter properly in the future.
During measure period 47 parts (~15%) out of 317 parts with defect broken thread were produced due to incorrect
loaded lower bobbin (cause analyzed by production leader).
1.At the last bag sewn , the machine will stop while sewing and light bulbs will turn ON.
The seam can be performed forward until the thread is cut. Machine will not start sewing , after last thread cut .
2.The machine will start sew again after the lower bobbin are changed and reset the counter
(with “8” function code from controller / display).
13 June 2019 Business unit, Presentation title
DMAIC Improve
• Implement presser foot / needle protection for automatic machines
Before After
Display
Oil tank
• Production date : 10.10.2016 – shift 2 – 14 operators actual / 17 operators standard – balancing not folowed according to MTM2
Available Target Availability Performanc Quality
Bag Type Project name PN Planificat Target Std time Target Std pcs/min OK NOK Scrap[%] OEE
time recalc (%) e (%) Rate(%)
HTAB PQ 12 HTAB 640 750 450 400 750 0.6 526 666.6667 22 4.01% 88.89% 82.20% 96.0% 70%
• Production date : 11.10.2016 – shift 2 – 13 operators actual (same operators !) / 17 operators standard – balancing performed according to MTM2
Available Target Availability Performanc Quality
Bag Type Project name PN Planificat Target Std time Target Std pcs/min OK NOK Scrap[%] OEE
time recalc (%) e (%) Rate(%)
HTAB PQ 12 HTAB 640 750 450 405 750 0.6 589 675 8 1.34% 90.00% 88.44% 98.7% 79%
Action implemented:
• Line balaced for 14 operators
• Comunication to operators of reviewed quantity to be produced in 14 operators
• Advantages : Lower Scrap level / Stability / Operators performs less operation and only what they are trainned for.
• For manual machines (seam 301) the needles have been changed once per 3 shifts instead of 6 shifts.
END seam
After
• - The scope is to eliminate the risk that the lower thread not be catched by the upper thread at first 10 stitches (at start of sewing process).
Results not available yet. Monitoring 13.10.2016 2nd shift to 21.10.2016 3rd shift
NOT confirmed
Seam start
First 5 stitches will have slow start from machine settings
After
Retaining clip
• -oiling system for automatic and manual machine - hourly checking for scrapped parts (performed by PL)
• -implement number of stitch for 301 seam - replace lower bobbin brake for automatic machine (S-AM21-0002)
GM D2XX TAB Fiat 334.520 TAB