Professional Documents
Culture Documents
Air Conditioning System Design: Progress Report
Air Conditioning System Design: Progress Report
SYSTEM DESIGN
Progress Report
October 3, 2018
Batuigas
Acuna
1
1
1
2
2
2
2
2
3
3
3
3
3
3
4
• Carrier's Hourly Analysis
Program (HAP) is a computer
tool which assists engineers in
designing HVAC systems for
commercial buildings
4
5
5
6
Control room floor area
- 16.43𝑚2
2
- 200 lumens/𝑚
(33286.4 𝑙𝑢𝑚𝑒𝑛𝑠)
𝑙𝑢𝑚𝑒𝑛𝑠 = 2.7 ≈ 3 bulbs
(1230 )
𝑏𝑢𝑙𝑏
6
7
From ASHRAE STANDARD 62.1 Ventilation for Acceptable Indoor Air Quality
7
Lobby floor area
- 86.46𝑚2
2
- 0.3 occupant/𝑚
2 𝑜𝑐𝑐𝑢𝑝𝑎𝑛𝑡
(86.47𝑚 )(0.3 )
𝑚2
= 25.94 ≈ 26 occupants
7
8
8
Wall Assembly
EXTERIOR WALLS
INTERIOR WALLS
8
9
10
11
Space Name Cooling load (kW) Air Flow (L/s)
Control Room 0.4 51
12
13
13
13
13
14
Tasks Left:
• Supply branch specifications (October 4-6)
• Return & Exhaust layout (October 4-6)
• Kitchen Ventilation (October 4-6)
• Finalized duct layout (October 7-8)
15