EVALUASI MINGGUAN AREA 1 DAN AREA 2

MINGGU KE - 102
PROYEK JALAN TOLL JAKARTA CIKAMPEK II ELEVATED
PROGRESS PEKERJAAN MINGGU KE- 102
PROGRESS WASKITA ACSET KSO

Rea l Mi ngguan WK Rea l Mi ngguan ACST Rea l Mi ngguan BTU Real Mi nggua n KSO

1.422
1.333
1.270

1.228
1.024

1.023
1.018
0.957

0.863
0.834
0.689

0.629
0.568

0.565

0.489
0.463
0.442

0.405
0.396
0.396

0.390
0.375
0.330

0.309

0.272
0.206

0.154
0.150

0.138
0.113

0.109
0.058
M-9 5 M-9 6 M-9 7 M-9 8 M-9 9 M-1 0 0 M-1 0 1 M-1 0 2

PROGRESS STRUKTUR WASKITA - MINGGU KE-102 REALISASI MINGGUAN WASKITA


SISA PEKERJAAN FUNGSIONAL
SECARA KSO (FUNGSIONAL M-112)
LEBARAN

Fungsional KSO : 93,612 % PT. WASKITA KARYA (PERSERO) TBK (Fungsional M-112)

Progress KSO Fungsional WASKITA : 30,339 %


Sisa :
: Progress
20,816 % Sisa :
72,796 % WASKITA :
5,639%
PT. BUKAKA TEKNIK UTAMA (FUNGSIONAL M-107)
24,700 %
Fungsional BUKAKA : 32,785% Per Minggu : 0,564 %
Progress
Sisa : AREA 1
BUKAKA :
6,860 % Fungsional Area 1 : 10,551 %
25,925%
Per Minggu : 1,372 % Progress Area 1 : Sisa :
9,5911 % 0,9599%
PT. ACSET INDONUSA (FUNGSIONAL M-112)
AREA 2
Fungsional ACSET : 30,488 %
Progress Fungsional Area 2 : 19,788 %
Sisa :
ACSET :
8,317 % Progress Area 2 : Sisa :
22,171%
Per Minggu ACSET : 0,832 % 15,1089% 4,6791%
TREN PEKERJAAN MINGGUAN

Steel Box Girder Diafragma


Rata-rata : Rata-rata :
4,8 line/hari Rata-rata : 3,8 span/hari
4,4 line/hari 27
34 Rata-rata :
31 2,9 span/hari
Rata-rata : 20
2,9 line/hari
Rata-rata :
Rata-rata : 20
2 line/hari Rata-rata : Rata-rata :
1,86
line/hari 14
1,1 span/hari 1,1 span/hari
13 Rata-rata :
8 8
4,1 span/hari
4

M98 M99 M100 M101 M102 M98 M99 M100 M101 M102

Slab LRB
Rata- rata : Rata-rata :
4,1 span/hari 14,8 buah/ha
Rata- rata : Rata-rata :
29 12,6 buah/hari 104
4 span/hari
Rata- rata : Rata-rata :
28 Rata-rata :
88 Rata-rata :
3,86 9,14 buah/hari8,6 buah/hari
span/hari 8 buah/hari
27 64
Rata- rata : Rata- rata : 56
60
3,5 span/hari 3,6 span/hari
25 25

M98 M99 M100 M101 M102


M98 M99 M100 M101 M102
TREN PEKERJAAN MINGGUAN

Link Slab Parapet


Rata-rata : Rata-rata : Rata-rata :
1 link 1,9 1,9
slab/hari Rata-rata : lajur/hari
lajur/hari
13.5 13.5
0,9 link
7
slab/hari
Rata-rata : Rata-rata :
Rata-rata : Rata-rata : 6
0,6 link 1,2 Rata-rata :
0,6 link 0,6 link Rata-rata :
slab/hari lajur/hari 1,14
slab/hari slab/hari 1 lajur/hari
8.5 lajur/hari
8
4 4 4 7.5

M98 M99 M100 M101 M102


M98 M99 M100 M101 M102
EVALUASI SCHEDULE LEBARAN 2019
SISA PEKERJAAN TERHADAP FUNGSIONAL LEBARAN
PROGRESS DAN RENCANA KERJA PEKERJAAN ERECTION SBG AREA 1 & 2
PROGRESS DAN RENCANA KERJA PEKERJAAN SLAB AREA 1 & 2

Tren Pekerjaan SLAB Waskita


50 700

45
600
JUMLAH SLAB

40

500
35

30
400

25

300
20

15
200

10

100
5

0 0
1 2 3 4 5 6 7 8 9 10 11 12 13 14
Realisasi Pengecoran Slab Minggu 102

Realisasi Pengecoran Slab Minggu 102

Zona 2 Zona 3 Zona 4 Zona 5 dan 6


Jalur A Jalur A Jalur A Jalur A
1. P6 – P7 Jalur A : 9 Maret 2019 1. P45 – P46 Jalur A : 8 Maret 2019 1. P104 – P105 Jalur A : 4 Maret 2019 1. P209 – P210 Jalur A : 6 Maret 2019
2. P14 – P15 Jalur A : 5 Maret 2019 2. P65 – P66 Jalur A : 9 Maret 2019 2. P109 – P110 Jalur A : 7 Maret 2019 2. P211 – P212 Jalur A : 7 Maret 2019
3. P23 – P24 Jalur A : 9 Maret 2019 3. P69 – P70 Jalur A : 5 Maret 2019 3. P161 – P162 Jalur A : 9 Maret 2019 3. P223 – P225 Jalur A : 5 Maret 2019
4. P25 – P26 Jalur A : 8 Maret 2019 4. P72 – P73 Jalur A : 6 Maret 2019 4. P257 – P258 Jalur A : 5 Maret 2019
5. P40 – P41 Jalur A : 7 Maret 2019 5. P83 – P84 Jalur A : 7 Maret 2019 5. P287 – P288 Jalur A : 5 Maret 2019
6. P42 – P43 Jalur A : 9 Maret 2019 6. P95 – P96 Jalur A : 7 Maret 2019
7. P102 – P103 Jalur A : 5 Maret 2019 Jalur B Jalur B
Jalur B 4. P104 – P105 Jalur B : 6 Maret 2019 6. P211 – P212 Jalur B : 9 Maret 2019
7. P3 – P4 Jalur B : 8 Maret 2019 Jalur B 5. P109 – P110 Jalur B : 6 Maret 2019
8. P7 – P8 Jalur B : 7 Maret 2019 8. P61 – P62 Jalur B : 5 Maret 2019 6. P143 – P144 Jalur B : 6 Maret 2019
3. P9 – P10 Jalur B 9. P85 – P86 Jalur B : 5 Maret 2019

Rencana Zona 2 : 8 Lajur Rencana Zona 3 : 9 Lajur Rencana Zona 4 : 6 Lajur Rencana Zona 5 dan 6 : 6 Lajur

Realisasi Zona 2 : 5 Lajur Realisasi Zona 3 : 9 Lajur Realisasi Zona 4 : 5 Lajur Realisasi Zona 5 dan 6 : 5 Lajur

Rencana Area 1 : 17 Lajur Rencana Area 2 : 12 Lajur

Rencana Area 1 : 14 Lajur Rencana Area 2 : 10 Lajur

Rencana AREA 1 DAN 2 : 29 LAJUR

Realisasi AREA 1 DAN 2 : 25 Lajur (Deviasi : -4 lajur)


Rencana Pengecoran Slab Minggu 103

Rencana Pengecoran Slab Minggu 103

Zona 1 dan 2 Zona 3 Zona 4 Zona 5 dan 6


Jalur A Jalur A Jalur A Jalur A
1. ABT D – PD1 : 15 Maret 2019 1. P58 – P59 Jalur A : 12 Maret 2019 1. P135 – P136 Jalur A : 11 Maret 2019 1. P189 – P190 Jalur A : 11 Maret 2019
2. P6 – P7 Jalur A : 15 Maret 2019 2. P63 – P64 Jalur A : 13 Maret 2019 2. P139 – P140 Jalur A : 15 Maret 2019 2. P198 – P199 Jalur A : 15 Maret 2019
3. P23 – P24 Jalur A : 16 Maret 2019 3. P80 – P81 Jalur A : 11 Maret 2019 3. P148 – P149 Jalur A : 16 Maret 2019 3. P227 – P228 Jalur A : 14 Maret 2019
4. P29 – P30 Jalur A : 15 Maret 2019 4. P90 – P91 Jalur A : 14 Maret 2019
5. P40 – P41 Jalur A : 15 Maret 2019
Jalur B Jalur B Jalur B
Jalur B 5. P64 – P65 Jalur B : 10 Maret 2019 4. P152 – P153 Jalur B : 12 Maret 2019 4. P211 – P212 Jalur B : 11 Maret 2019
6. P11 – P12 Jalur B : 12 Maret 2019 6. P95 – P96 Jalur B : 11 Maret 2019 5. P135 - P136 Jalur B : 15 Maret 2019 5. P224 – P225 Jalur B : 16 Maret 2019
7. P15 – P16 Jalur B : 11 Maret 2019 7. P102 – P103 Jalur B : 12 Maret 2019 6. P139 – P140 Jalur A : 16 Maret 2019 6. P177 – P178 Jalur B : 16 Maret 2019
8. P37 – P38 Jalur B : 11 Maret 2019 8. P68 – P69 Jalur B : 16 Maret 2019 7. P148 – P149 Jalur B : 14 Maret 2019
9. P39 – P40 Jalur B : 16 Maret 2019

Rencana Zona 1 dan 2 : 9 Lajur Rencana Zona 3 : 8 Lajur Rencana Zona 4 : 7 Lajur Rencana Zona 5 dan 6 : 6 Lajur

Rencana Area 1 : 17 Lajur Rencana Area 2 : 13 Lajur

Rencana AREA 1 DAN 2 : 30 LAJUR


PROGRESS DAN RENCANA KERJA PEKERJAAN LRB

Tren Pekerjaan LRB Waskita Fungsional

140 1400

JUMLAH LRB

120 1200

100 1000

80 800

60 600

40 400

20 200

0 0
1 2 3 4 5 6 7 8 9 10 11 12 13 14
PROGRESS DAN RENCANA KERJA PEKERJAAN LINK SLAB

Tren Pekerjaan Link Slab Fungsional Waskita

VOLUME LINK SLAB


25 200

180

20 160

140

15 120

100

10 80

60

5 40

20

0 0
1 2 3 4 5 6 7 8 9 10 11 12 13 14
PROGRESS DAN RENCANA KERJA PEKERJAAN PARAPET

Tren Pekerjaan Exp. Joint Fungsional Waskita

VOLUME EXP. JOINT


40 350

35
300

30
250

25
200

20

150
15

100
10

50
5

0 0
1 2 3 4 5 6 7 8 9 10 11 12 13 14
ACTION PLAN PEKERJAAN BLOCKOUT
Action Plan Pekerjaan Blockout

Selesai Sisa 3 Span Sisa 27 Span Sisa 5 Span Sisa 32 Span


Target Selesai : 18 Target Selesai : 25 Target Selesai : 22 Target Selesai : 24
Maret 2019 Maret 2019 Maret 2019 Maret 2019

2 Tim 7 Tim 2 Tim 8 Tim


Action Plan Pekerjaan Blockout
BEKISTING SLAB, PARAPET DAN LINK SLAB
REALISASI BEKISTING

Realisasi Bekisting Slab Realisasi Bekisting Parapet


NO. LOKASI RENCANA REALISASI DEVIASI
1 ZONA 1 6 0 -6
2 ZONA 2 11 12 +1
3 ZONA 3 15 18 +3
4 ZONA 4 12 14 +2
5 ZONA 5 5 5 -
6 ZONA 6 11 11 -
TOTAL 60 60 0
Realisasi Bekisting Link Slab
ACTION PLAN PEKERJAAN ERECTION SBG DAN SLAB
DETAIL ACTION PLAN BEKISTING SLAB AREA 1 DAN 2

No Zona Rencana Realisasi Deviasi


1 Zona 1 6 0 -6
2 Zona 2 11 12 +1
3 Zona 3 15 18 +3
4 Zona 4 12 14 +2
5 Zona 5 5 5 -
6 Zona 6 11 11 -
Total 60 60 0
ZONA 1 – IC CIKUNIR

RAMP A dan D

15
15 Apr
Apr 14
14 Apr
Apr

13
13 Apr
Apr 6
6 Mei
Mei 7
7 Apr
Apr
16
16 Mar
Mar 15
15 Mar
Mar
1
1 Mei
Mei 3
3 Mei
Mei 4
4 Mei
Mei
14
14 Mar
Mar 14
14 Mar
Mar 10
10 Mar
Mar
1
1 Apr19
Apr19 3
3 Apr19
Apr19 4
4 Apr19
Apr19
Abt A P01 P02 P03 P04 P05 P06 P07 P08
Abt A’`

P09A P10A P11A

13
13 Mar
Mar 12
12 Mar
Mar 11
11 Mar
Mar
P09C P10C P11C P11D P12 P13 P14 P15 P16 P17 P1
4
4 Mei
Mei 9
9 Apr
Apr 2
2 Mei
Mei

Abt D PD1 PD5 P09B 30


30 Mar 29
29 Mar
Mar 28
28 Mar
Mar 27
27 Mar 8
PD2 PD3 PD4 PD6 PD7 PD8 P10B P11B 6
6 Apr
Apr Mar Mar 8 Mar
Mar 6
6 Mar
Mar 5
5 Mar
Mar 3
3MM

12
12 Mei
Mei 10
10 Mei 8
8 Mei 7
7 Mei 6
Mei Mei Mei 6 Mei
Mei 13
13 Apr
Apr 11
11 Apr
Apr 10
10 Apr
Apr 8
8 Ap
Ap

21
21 Feb
Feb 18
18 Mar
Mar 19
19 Mar 5 21
21 Mar 22
22 Mar 23
23 Mar
Mar 5 Mar
Mar Mar Mar Mar 24
24 Mar
Mar 2
2 Apr19
Apr19

21
21 Mar
Mar 15
15 Apr
Apr 18
18 Apr
Apr 5
5 Apr
Apr 30
30 Apr
Apr 19
19 Apr
Apr 3
3 Mei
Mei 21
21 Apr
Apr 5
5 Mei
Mei

Keterangan :
: Erection SBG
Sementara Bekisting Slab
Kebutuhan Bekisting : Cikunir dialihkan ke : : Pengecoran Slab
a. 6 Set Pengadaan Baru 1 set ke zona 1 Target Finish :
b. 10 set Pindahan dari Zona 3 set ke zona 3 Ramp A : 12 Mei 2019
2 dan Zona 3 2 set ke zona 4 Ramp D : 5 Mei 2019
Zona 2 STA 10+500 S/D 13+400

9 Apr 14 Mar 30 Mar 9 Apr 13 Mar 3 Apr 28 Mar 15 Mar 9 Apr

12 Apr 6 Apr 27 Mar


15 Mar 16 Mar

14 Mar 16 Mar 29 Mar 16 Mar 29 Mar 13


13 Mar
Mar 14 Mar 27 Mar

18 Mar 31 Mar 19 Mar 19 24 Mar 19 7 Apr 19

Keterangan :
: Erection SBG
Kebutuhan Bekisting : 11 Set Target Finish Zona 2 :
Ready : 12 set 12 April 2019 : Pengecoran Slab
Zona 3 - STA 13+400 S/D 17+100
Paling Lambat : 11 Maret LG 1 Belum Longspan Sungai Bekasi BENTANG 75
2019 dibongkar M
15 Mar 30 Mar 5 Apr 8 Apr 9 Apr 21 Apr 25 Apr 30 Apr 3 Mei 4 Mei 2 Mei 30 Apr 25 Apr 19 Mar

17 Mar 1 Apr 2 Apr 31 Mar 3 Apr 31 Mar 23 Mar 24 Mar 25 Mar 3 Mei 2 Apr 2 Mei 21 Mar 20 Mar 20 Mar 6 Apr 4 Apr

20 Apr 25 Apr 30 Apr 4 Mei 30 Apr 25 Apr 4 Mei 2 Mei

KM 14
16 Mar 12 Mar 10 Apr 19 Mar

18 Mar 30 Mar 13 Apr 15 Mar 3 Apr

KM 16
KM 15
Keterangan :

Kebutuhan Bekisting : 15 Set : Erection SBG


Target Finish Zona 3 :
Ready : 18 set 15 April 2019 (Lokasi Zona 3 selain Long Span dan Bentang 75 m) : Pengecoran Slab
Zona 3 - STA 13+400 S/D 17+100

17 Mar 20 Mar 7 Apr


14 Mar

20 Mar 21 Mar 13 Mar 25 Mar 15 Apr

Keterangan :
Target Finish Zona 3 :
Kebutuhan Bekisting : 15 Set 4 Mei 2019 (Lokasi Longspan Sungai Bekasi dan Bentang 75 m : Erection SBG
Ready : 18 set 15 April 2019 (Lokasi Zona 3 selain LS dan Bentang 75 m) : Pengecoran Slab
Zona 4 STA 17+100 s/d 21+400
SUTT KCIC

17 Apr

14 Mar 8 Apr 13 Mar 7 Apr 28 Mar 4 Mei

10 Mar 24 Apr
16 Mar 10 Apr 15 Apr 9 Apr
6 Apr

15 Mar 12 Mar 17 Mar

17 Mar 23 Mar 14 Mar Keterangan :


: Erection SBG

: Pengecoran Slab
Zona 4 STA 17+100 s/d 21+400

Portal Grand Wisata

Longspan Grand Wisata

26 Apr 12 Apr
4 Mei 3 Mei 2 Mei 1 Mei 30 Apr

31 Mar 30 Mar 29 Mar 28 Mar 27 Mar 11 Mar 31 Mar

4 Mei 3 Mei 2 Mei 1 Mei 30 Apr 26 Apr 12 Apr 4 Mei

Keterangan :
Total Kebutuhan Bekisting : 12 SetTarget Finish Zona 4 :
Bekisting Ready di Lapangan : 12 30
setApril 2019 (Non Portal dan LongSpan) : Erection SBG
4 Mei 2019 (Lokasi Portal)
3 Mei 2019 (Lokasi Longspan) : Pengecoran Slab
Zona 5 STA 21+400 s/d 24+700
otal Kebutuhan Bekisting : 5 Set Target Finish Zona 5 :
ekisting Ready di Lapangan : 3,5 set30 April (Non Portal dan Longspan) Portal Grand Wisata
10 Mei 2019 ( Longspan)

7 Mei 5 Mei 5 Mei 12 Apr 16 Mar 14 Apr 17 Apr 18 Apr 19 Apr 20 Apr 21 Apr 22 Apr

7 Apr 12 Mar 13 Mar 17 Mar 18 Mar 19 Mar 20 Mar 21 Mar 22 Mar

5 Mei 5 Mei 5 Mei 10 Apr 15 Apr 11 Apr 15 Apr 16 Apr 17 Apr 18 Apr 19 Apr 20 Apr

5 Mei 5 Mei 19 Mar

5 Mei 5 Mei 21 Mar 15 Mar

Longspan CIbitung

26 Mar 17 Mar 10 Apr 20 Mar 14 Apr 9 Mei 28 Mei 28 Mei

Keterangan :
: Erection SBG
29 Apr 29 Apr
24 Mar 15 Mar 8 Apr 18 Mar 12 Apr 7 Mei
27 Mei 27 Mei : Pengecoran Slab
Zona 6 STA 24+700 s/d 28+450
Keterangan :
Total Kebutuhan Bekisting : Target Finish Zona 6 : : Erection SBG
11 Set 18 April 2019 (Non SUTET)
Bekisting ReadyBENTANG
di 3 Mei 2019 (Lokasi SUTET) : Pengecoran Slab
75
Lapangan : 11 set M
28 Apr 9 Mei 21 Apr 16 Apr 7 Apr

29 Apr 10 Apr 16 Apr 8 Mar

27 Mei 7 Mei 19 Apr 14 Mei 5 Apr


SUTT 26+724 SUTT + BENTANG 75 M

1 Mei 2 Mei 3 Mei 27 Apr 24 Apr 26 Apr

28 Mar 25 Mar 27 Mar


1 Apr 2 Apr 3 Apr

30 Apr 1 Mei 2 Mei 25 Apr 22 Apr 24 Apr

PERTAGAS SUTT 28+400

16 Apr 18 Apr 26 Mei 28 Mei

16 `Mar 18 Mar 26 Apr 28 Apr


14 Apr 16 Apr 24 Mei 26 Mei
ACTION PLAN PEKERJAAN PARAPET
PARAPET AREA 1
Area 1

TARGET PENGECORAN PARAPET


Zona 2 STA 10+500 S/D 13+400

PERGERAKAN BEKISTING PARAPET ZONA 2

Jalur A
Jalur B

Jalur A
Jalur B

Inner :

Keterangan :

Arah Pergerakan Bekisting Parapet


Zona 3 - STA 13+400 S/D 17+100

PERGERAKAN BEKISTING PARAPET ZONA 3


Longspan Sungai Bekasi BENTANG 75
M

Total Bekisting Parapet Zona 2 : Target Penyelesaian :


- Inner : 250 meter (4,5 set) 10 Mei 2019
- Outter : 200 meter (3,5 set)

Arah Pergerakan Bekisting Parapet


PARAPET AREA 2
Area 2

TARGET PENGECORAN PARAPET


Zona 4 STA 17+100 s/d 21+400
Zona 5 STA 21+400 s/d 24+700
Zona 6 STA 24+700 s/d 28+450
DETAIL PROGRESS DAN ACTION PLAN PORTAL BAJA
RAPAT EVALUASI PEK PORTAL BAJA 22 JANUARI 2019
PORTAL CIKUNIR (3 PORTAL)
PORTAL GRAND WISATA (P167 – P170)
PORTAL GRAND WISATA (P192 – P196)
PORTAL GRAND WISATA (P192 – P196)
Erection Perdana Portal P192
DETAIL PROGRESS DAN ACTION PLAN LONGSPAN
LONGSPAN GRAND WISATA
LONGSPAN GRAND WISATA

Note :
Kekurangan material menghambat pekerjaan
pemasangan gusset dan stiffener .
Direncanakan kekurangan material akan datang
tgl 28 Feb 2019
LONGSPAN GRAND WISATA
LONGSPAN GRAND WISATA
LONGSPAN GRAND WISATA (TEMPORARY SUPPORT)
RENCANA ERECTION LONGSPAN GRAND WISATA
Target Finish Erection
No Lokasi Target Erection
1 P173 – P174 15 Maret 2019
2 P174 – P175 27 Maret 2019
3 P175 – P176 20 Maret 2019
4 Punch List & Final 30 Maret 2019
Acceptance
LONGSPAN IC CIBITUNG
LONGSPAN IC CIBITUNG

Target Finish Erection 29 April


2019
LONGSPAN IC CIBITUNG
Fabrikasi Temporary Support Assembly & Welding Stiffener

Assembly & Welding I Girder


Drilling Stiffener
LONGSPAN IC CIBITUNG
Fabrikasi Temporary Support Assembly & Welding Stiffener

Assembly & Welding I Girder


Drilling Stiffener
LONGSPAN IC CIBITUNG
Built Up I Girder
Pondasi Tower Support dan
Pemindahan Site Facilities
TERIMA KASIH