Client's Requirements: - 600 Beds - 3 Land Selections - Durable and Sustainable
Client's Requirements: - 600 Beds - 3 Land Selections - Durable and Sustainable
• 600 Beds
• 3 land selections
• Durable and sustainable
Land 1
Advantage
• Flat land
• Less earthwork cost
• Accessible to water and electricity
Disadvantage
• Land area too small (approximately
9400m2)
• Surrounded by residential housing,
limited working hours
• Limited access for large machinery and
material transportation, narrow road
• Limited space for material storage
• Nearby school could effect traffic
congestion during peak hour
concurrently affect the flow of
ambulance during emergency
Land 2
Advantage
• Large land area (approximately
30,500m2)
• Accessible to water and electricity
• Sufficient space for material storage
• Beside of main road, easy access by
large machinery and material
transportation
Disadvantage
• Uneven land
• Large earthwork cost
Land 3
Advantage
• Flat land
• Less earthwork cost
• Sufficient land area (approximately
20300m2)
• Accessible to water and electricity
• Sufficient space for material storage
Disadvantage
• Surrounded by residential housing
and shop lot, limited working hours
• Limited access for large machinery
and material transportation, narrow
road
• Nearby school could effect traffic
congestion during peak hour
concurrently affect the flow of
ambulance during emergency
Proposed Land
Selection Why??
• Large land area to accommodate
main priority of 600 beds and to
provide sufficient car park
• Near to main road, able to provide
easy access for machinery and
transportation of material to ease
construction. During full operation of
the hospital, multiple access to the
hospital is an important factor
• Easy designing for sewerage and
drainage system due to its natural
sloping elevation and existing
manhole outside the boundary
LAND 2 (approximately
30,500m2)
Gantt Chart + Design Proccess
• From microsoft project( construction phase
only)
Choice of Land
0.6m
Carpark – Raft Foundation
• Section :
Rectangular
• Raft thickness : 600
mm
• Concrete grade, fcu : G35
• Primary reinforcement, fy : 460
2
N/mm (Type 2)
• Spacing Step : 25 mm
Raft bottom layer T25-200mm c/c b/w
• Concrete cover : 75 mm
Raft top layer T25-200mm c/c b/w
• Type
Circular
• Dimension Ø 600 mm
• Concrete Grade, 𝑓𝑐𝑢 G30
• Cover 30 mm
• Primary reinforcement, 𝑓𝑦 460
N/mm2
• Shear link strength, 𝑓𝑦 250 N/mm
Slab Details
• Thickness 150 mm
• Concrete Grade, 𝑓𝑐𝑢 G30
• Cover 25 mm
• Primary reinforcement, 𝑓𝑦 460
N/mm2
• Shear link strength, 𝑓𝑦 250 N/mm2
Shear Wall Details
• Thickness 230 mm
• Concrete Grade, 𝑓𝑐𝑢 G30
• Cover 30 mm
• Primary reinforcement, 𝑓𝑦 460
N/mm2
• Distribution reinforcement, 𝑓𝑦 250
N/mm2
PARKING STRUCTURAL
DESIGN
Beam Details
• Type Rectangular
• Dimension 300 x 600
350 x 450
400 x 450
650 x 450
• Concrete Grade, 𝑓𝑐𝑢 G30
• Cover 30 mm
• Primary reinforcement, 𝑓𝑦 460 N/mm2
• Shear link strength, 𝑓𝑦 250 N/mm2
Column Details
• Type Rectangular
• Dimension 300 x 300
1000 x 400
Existing Soil
Sustainability
• Suggestion of extra device can be added into
the completed structure in the future in order
to improve the sustainability of the hospital
• Example: Solar panel, wall turfing
Cost Estimation
• Overall cost estimation
Facilities & Staff Cost
estimation
Labour& Material
Cost Estimation
Culvert Cost Estimation
Pavement & Sewerage Cost Estimation
Consultancy fees