Baker Oil Tools

Well Completion

Subsoil Conference,
Esbjerg 6. February, 2007

by
Trond Rese
Baker Oil Tools, Scandinavia

© 2007 Baker Hughes Incorporated


All rights reserved.
Content

 Completion - Definition
 Basic well completion sequence
 Pertinent completion concepts
 PSI completion
 Basic completion principles
 Completion elements
 Advanced completion technology

© 2007 Baker Hughes Incorporated


All rights reserved.
The Purpose of the Completion
The well completion is the installation that enables
production of fluids in a safe and efficient manner.

Ideally, the lowest cost completion (considering both initial and


operating costs) that meets the demands placed upon it for the well life.

© 2007 Baker Hughes Incorporated


All rights reserved.
Reservoir Management Tool
The choice of completion concept is dictated by:
 The reservoir model and operator’s drainage strategy.
– Horizontal wells
– Single zone/multiple zone
– Co-mingled production/flow control
– Pressure maintenance

 Reservoir properties.
– Open hole/Cased hole completion
– Sand control measures LLBBI
TTLLIY
Y
TY
Y
– Stimulation SwPOR
Sw POR
C
– Artificial lift EMENCEMEN
CEMEN OS
OS
ITY
ITY
T
 The physical and chemical qualities of theROCK
fluids.
– Completion metallurgy GRAIN SoSo
– Elastomer qualities
– Deposits/Scale Production Packer w/ feed through

– Chemical injection HCM Sleeve


P/T gauge

Schrouded HCM Sleeve

 Other development considerations. ZXP Liner Hanger and Packer w/ PBR

– Expandable tubulars
– Future well interventions
– Well trajectory
– Intelligent Wells

ZXP Liner Hanger
Multilateral wells and Packer w/ PBR
Hydrasplit w/ 4 1/2" on lateral leg
and 7" on main leg
Seal Bore Diverter

Production Anchor w/PBR seal


assembly
© 2007 Baker Hughes Incorporated
MLZX Liner Hanger and Packer w/ PBR
All rights reserved.
Basic Sequences
of a Well Completion
Drilling operation
 Drill 30” – 36” pilot hole
 Set 30 “ conductor
 Drill 26” surface hole
 Install 20” surface casing
 Drill 17 ½” intermediate hole
 Install 13 3/8” intermediate casing
 Drill 12 ¼” hole to top of the reservoir
 Install 9 5/8” casing
 Drill 8 ½” hole to TD
Start of the Completion Operation
 Run & hang off liner
 Cement liner
 Set liner hanger packer
 Install production tubing
 Set production packer
 N/D BOP N/U X-mas tree
 Perforate
 Stimulate
 Produce © 2007 Baker Hughes Incorporated
All rights reserved.
Completion Concepts

Multiple zone completion


 Production packers set in the liner
 Top packer need to be V0 rated
 Selective zone production

Reservoir

Reservoir © 2007 Baker Hughes Incorporated


All rights reserved.
Completion Concepts

Multiple zone completion


 Dual string
 Top packer need to be V0 rated
 Selective zone production

Reservoir

Reservoir © 2007 Baker Hughes Incorporated


All rights reserved.
Completion Concepts

Multiple zone completion


 Production packers set above the liner
 Isolation packer between the zones
 Selective zone production

Reservoir

Reservoir

Reservoir © 2007 Baker Hughes Incorporated


All rights reserved.
Perforate, Stimulate & Isolate (PSI)
Horizontal Completion

Side-Mounted “K-3” Retrievable Production Locator Tubing Seal


Guns with Firing Head Hold Down ISO Packer Tubing Assembly

Work Ball ISO Packer “CM” Sliding Sleeve Concentric


String Seat Running Tool Work String

Guns
Work String

Liner

© 2007 Baker Hughes Incorporated


All rights reserved.
PSI Completion Process

RIH and set Sump Packer

© 2007 Baker Hughes Incorporated


All rights reserved.
PSI Completion Process

POosOitHionguns and perforate

© 2007 Baker Hughes Incorporated


All rights reserved.
PSI Completion Process

RCSeleHtaawnniocthhuotisreoxalcanetdisosniamsusleamtebl
y

© 2007 Baker Hughes Incorporated


All rights reserved.
PSI Completion Process

Stab into sump packer

© 2007 Baker Hughes Incorporated


All rights reserved.
PSI Completion Process

PSPeotsOIiStHioOnPgaucnkserandperforate

© 2007 Baker Hughes Incorporated


All rights reserved.
PSI Completion Process

RCSeleHtaawnniocthhuotnrexwacniedssoslaimtiounlaatessembly

© 2007 Baker Hughes Incorporated


All rights reserved.
PSI Completion Process

Stab into packer

© 2007 Baker Hughes Incorporated


All rights reserved.
PSI Completion Process

PRSeoetpsiPetaiaotcnpkergorucnesssanudntpilearflolrate
nzoenwezsoanreecompleted

© 2007 Baker Hughes Incorporated


All rights reserved.
PSI Horizontal Completion

 Perforate stimulate and isolate in one trip


 Developed for multiple-zone hydraulic fracs
Locator Tubing Seal  Single-string selective cemented completion
Assembly
 Completions – 3.500+ zones isolated to date
9-5/8” or 10 3/4“ “Neo” Packer

Millout Extension

Liner Hanger
Retrievable
ISO-Packer
Locator
Tubing Seal
Assembly

Liner

Tubing “CM” Sliding Sump Packer


Sleeve (closed)

© 2007 Baker Hughes Incorporated


All rights reserved.
Well Completion Scematic

Upper Completion
(Well Control)

Lower Completion
(Production Control)
Cased Hole Completion Open Hole Completion

© 2007 Baker Hughes Incorporated


All rights reserved.
Well Completion Scematic
EXCLUDER 2000

Schroud Membrane Wire wrap Base pipe

Screen

© 2007 Baker Hughes Incorporated


All rights reserved.
Well Completion Scematic
PBR

Packing element

Liner hanger slips

Liner Hanger

© 2007 Baker Hughes Incorporated


All rights reserved.
Well Completion Scematic
Inner Flow Ports

Outer Flow Ports

Inner Sleeve

Sliding Sleeve

© 2007 Baker Hughes Incorporated


All rights reserved.
Well Completion Scematic
Inner Sleeve
Outer Flow Ports
Inner Flow Ports
Shroud
Plug

Flow Ports

Shrouded
Sliding Sleeve

© 2007 Baker Hughes Incorporated


All rights reserved.
Well Completion Scematic
Slips (cast iron)

Packing element

Slips (cast iron)

Production
Packer

© 2007 Baker Hughes Incorporated


All rights reserved.
Well Completion Scematic
Maine bore Orienting sleeve

Tool guards

Side pocket
w/flow ports

Side
Pocket
Mandrel

© 2007 Baker Hughes Incorporated


All rights reserved.
Well Completion Scematic
CGoamslpiflteGtioasnfluid

Side
Pocket
Mandrel

© 2007 Baker Hughes Incorporated


All rights reserved.
Well Completion Scematic

Safety
DHSV
Systems

CASV

FLX-4

PCT

© 2007 Baker Hughes Incorporated


All rights reserved.
The Intelligent Well System
Wellhead /Tubing Hanger
penetrates and feedthroughs

Data
Acquisition
System
Bumper Wire Termination
Subs

Safety Valve

Other Completion Components (Gauge Mandrel, Side


Control Panel Pocket Mandrels, Expansion Joint, Wet Disconnects, etc.)

Production
Packer Permanent
Monitoring
Hydraulic/Electric
Sleeve
Isolation
Hydraulic/Electric Packer Mechanical
Cable Protection Conduit
Systems (Clamps) Sleeve
Splice Sub and
Connectors
Seating Nipple
or Bull Plug
Tubing

Fiber or Electric
Conduit

© 2007 Baker Hughes Incorporated


All rights reserved.
The Intelligent Well System
Basic Elements
Hydraulic Control
Lines, Chemical
Injection Lines and
Communication Lines
Permanent Sensors
for Pressure, Temperature and Flow

Production and
Isolation Packer
with by-pass
feature

Remote Control Flow Regulators

© 2007 Baker Hughes Incorporated


All rights reserved.
Multilateral Wells

© 2007 Baker Hughes Incorporated


All rights reserved.
ML – TAML Code
(Technology Advancement – Multilateral)

OpCeansedand
CPareCsuseansdsCscueueaardepmnspdeaienodnncd trea
tteemnddrdietynted
maatch
tijnueenmbcmcjoeeua ri nnoetn
tm icnee&tndbiotolenamrde teairnal
b rceahsniesdmuverlaaedtn
ore
P.a i ew
i srboaio
tlh
l arteion
LEVEL 6 t h ec a
at th e j u n ct io n s i
n g
LLEELVEVEVELELL154
LEVEL 2VEL 3 achieved with
completion

LateOrpaelcnahsoelde,
butonroutncseumpepnotreteddliner
in lateral © 2007 Baker Hughes Incorporated
All rights reserved.
Multilateral Systems
 Level 6
– FORMation Junction
 Level 5
– FORM 5 Junction
– HydraSplit HP Junction 1
– RAM Hanger (3 or 5) 2
 Level 3-4
– HOOK Hanger System

1 Under development (Qtr 1-08)


2 Under development (Qtr 1 – 07)

© 2007 Baker Hughes Incorporated


All rights reserved.
Expandable Tubulars

 8-1/2"
 Open
 Hole

 6-7/8" EXPress
 Screen

© 2007 Baker Hughes Incorporated


All rights reserved.
Expansion Video

© 2007 Baker Hughes Incorporated


All rights reserved.
linEXX Video

© 2007 Baker Hughes Incorporated


All rights reserved.
Reducing Annular Space,
Increasing ID

 Large annular flow due to


greater resistance to flow in  No annulus,
the pipe than the annulus
no annular flow

© 2007 Baker Hughes Incorporated


All rights reserved.
Well Construction Evolution
Tradition Monobo
al re
Expandable technology

Reduced consumption
 Drilling Fluids 60% reduction e
t
n ru
 Casing 60% reduction
re  Cement 75% reduction u
t
r
Reduced environmental impact F
C  Cuttings 60% reduction
u  Less consumption means less
transport
Reduced drilling risk
Smaller rig/vessel

© 2007 Baker Hughes Incorporated


All rights reserved.
Summary

● Lower Completion ● Upper Completion


– Cased hole completion – Safety systems
– Open Hole Completion – Artificial Lift
– Zone Isolation/Control – Packer Systems
– Flow Control

● Advanced Completion Systems


– Multilateral Well Completion
– Intelligent Well Systems
– Expandable Metal Systems

© 2007 Baker Hughes Incorporated


All rights reserved.
Baker Oil Tools

Thank you for your attention.