Well Completion
Subsoil Conference,
Esbjerg 6. February, 2007
by
Trond Rese
Baker Oil Tools, Scandinavia
Completion - Definition
Basic well completion sequence
Pertinent completion concepts
PSI completion
Basic completion principles
Completion elements
Advanced completion technology
Reservoir properties.
– Open hole/Cased hole completion
– Sand control measures LLBBI
TTLLIY
Y
TY
Y
– Stimulation SwPOR
Sw POR
C
– Artificial lift EMENCEMEN
CEMEN OS
OS
ITY
ITY
T
The physical and chemical qualities of theROCK
fluids.
– Completion metallurgy GRAIN SoSo
– Elastomer qualities
– Deposits/Scale Production Packer w/ feed through
– Expandable tubulars
– Future well interventions
– Well trajectory
– Intelligent Wells
–
ZXP Liner Hanger
Multilateral wells and Packer w/ PBR
Hydrasplit w/ 4 1/2" on lateral leg
and 7" on main leg
Seal Bore Diverter
Reservoir
Reservoir
Reservoir
Reservoir
Guns
Work String
Liner
RCSeleHtaawnniocthhuotisreoxalcanetdisosniamsusleamtebl
y
PSPeotsOIiStHioOnPgaucnkserandperforate
RCSeleHtaawnniocthhuotnrexwacniedssoslaimtiounlaatessembly
PRSeoetpsiPetaiaotcnpkergorucnesssanudntpilearflolrate
nzoenwezsoanreecompleted
Millout Extension
Liner Hanger
Retrievable
ISO-Packer
Locator
Tubing Seal
Assembly
Liner
Upper Completion
(Well Control)
Lower Completion
(Production Control)
Cased Hole Completion Open Hole Completion
Screen
Packing element
Liner Hanger
Inner Sleeve
Sliding Sleeve
Flow Ports
Shrouded
Sliding Sleeve
Packing element
Production
Packer
Tool guards
Side pocket
w/flow ports
Side
Pocket
Mandrel
Side
Pocket
Mandrel
Safety
DHSV
Systems
CASV
FLX-4
PCT
Data
Acquisition
System
Bumper Wire Termination
Subs
Safety Valve
Production
Packer Permanent
Monitoring
Hydraulic/Electric
Sleeve
Isolation
Hydraulic/Electric Packer Mechanical
Cable Protection Conduit
Systems (Clamps) Sleeve
Splice Sub and
Connectors
Seating Nipple
or Bull Plug
Tubing
Fiber or Electric
Conduit
Production and
Isolation Packer
with by-pass
feature
OpCeansedand
CPareCsuseansdsCscueueaardepmnspdeaienodnncd trea
tteemnddrdietynted
maatch
tijnueenmbcmcjoeeua ri nnoetn
tm icnee&tndbiotolenamrde teairnal
b rceahsniesdmuverlaaedtn
ore
P.a i ew
i srboaio
tlh
l arteion
LEVEL 6 t h ec a
at th e j u n ct io n s i
n g
LLEELVEVEVELELL154
LEVEL 2VEL 3 achieved with
completion
LateOrpaelcnahsoelde,
butonroutncseumpepnotreteddliner
in lateral © 2007 Baker Hughes Incorporated
All rights reserved.
Multilateral Systems
Level 6
– FORMation Junction
Level 5
– FORM 5 Junction
– HydraSplit HP Junction 1
– RAM Hanger (3 or 5) 2
Level 3-4
– HOOK Hanger System
8-1/2"
Open
Hole
6-7/8" EXPress
Screen
Reduced consumption
Drilling Fluids 60% reduction e
t
n ru
Casing 60% reduction
re Cement 75% reduction u
t
r
Reduced environmental impact F
C Cuttings 60% reduction
u Less consumption means less
transport
Reduced drilling risk
Smaller rig/vessel