1 Tinau (1 MW ) Bricks with cement mortar and Experience Sandstone Performing well
Tunnel 1.6 km long & 2 m span pre-cast concrete arc (Middle Siwalik) since 1974
2 Kulekhani I & II (60 & 32 MW ), Tunnel Concrete lining with rock bolt and Experience Quartzite/ schist Performing well
2.3 km long & 1.8 m span shotcrete (Lesser Himalaya) since 1977-1982
3 Marsyangdi (75 MW ) Concrete lining with rock bolt and NATM with Phyllite/ Quarzite Performing well
Tunnel 4 km long & 6 m span shotcrete experience (Lesser Himalaya) since 1986
4 Adhi Khola (5.1 MW ) Stone masonary with pre-cast Experience Slate/phyllite Performing well
Tunnel 1.2 km long & 2.2 m span concrete arc (Lesser Himalaya) since 1989
6 Khimti I (60 MW ) Rock bolts with fibre reinforced Q-System Gneiss/schist Performing well
Tunnel 7.9 km long & 4 m span shotcrete, partly concrete lining (Lesser Himalaya) since 2000
7 Modi (14 MW ), Tunnel 1.5 km long & Rock bolts with mesh shotcrete Q-system/ RMR Quartzite/ phyllite Performing well
3.15 m span and concrete lining (Lesser Himalaya) since 2000
8 Puwakhola (6.2 MW ) Pattern of rock bolts with mesh Q-system/ RMR Gneiss/schist Performing well
Tunnel 3.24 km long & 2.5 m span shotcrete and concrete lining (Lesser Himalaya) since 2001
9 Kali Gandaki (144MW ) Concrete lining with steel ribs, GSI/RMR Phyllite/slate /dolomite Performing well
Tunnel 6 km long & 8 m span shotcrete and rock bolt (Lesser Himalaya) since 2002
10 Indrawati (7.5 MW ) Concrete lining with RMR Gneiss/schist/ Quartzite Performing well
Tunnel 3 km long & 2.5 m span steel ribs, shotcrete and rock bolt (Lesser Himalaya) since 2002
11 Chilime (20 MW ), Rock bolts with mesh shotcrete Q-system/ RMR Gneiss/ schist Performing well
Tunnel 3 km long & 3.5 m span and concrete lining (Lesser Himalaya) since 2003
Rock support design
Irrigation tunnels
Rock support design
Andhi Khola, Jhimruk, Khimti Projects
Rock support design
Rock support design
,
'.,
\
\
\
'
."'..r
l
\
I
\
Rock support design
Rock support design
Rock support design
Final lining issues
Final lining issues
Risk of air trapping at
chimney and irregular
crown in overbreak
areas,
Free flow tunnel => no
issue
Pressure tunnel with high
points
Concrete lining & back
filling
Air vent => Expansive
Air release pipe
Final lining issues
Voids behind steel ribs
with dry stone packing
covered by shotcrete
Additional shotcrete
covering steel ribs and
rock bolts
Grouting in dry stone
packing
Weep holes
Concrete lining if badly
damaged
Final lining issues
Reduced cross section
of tunnels by rock
squeezing
Final lining normally
after squeezing stable
Additional rock bolt and
shotcrete if section
allow and not badly
damaged
Reshaping of tunnel
Steel lining Photo: Sanjiv Shah 2014
Final lining issues
Shotcrete strength and
fibre
25 MPa in situ strength
Steel fibre => 50 kg/m3
(L=21-40mm)
Wire mesh shotcrete
difficult to install and
voids
Final lining issues
Cracked shotcrete in
weak zones
Scale down cracked Sfr
Wire mesh shotcrete with
rock bolt
Concrete lining at walls
and shotcrete at crown
Spot weep holes in
seepage
Final lining issues
Support in seepage
sections
Spot weep holes with
pipes
Additional rock support
Allow water if pressure
exceeds internal water
head
Grouting if water
pressure lower than
internal water pressure
Final lining issues
Concrete lining
Depends on rock mass condition
Concrete lining
Hydro-fracturing risk sections
High pressure sections
Reduce head loss
Shear/weak zones: > 60% clay
Leakage/ karst features
Invert lining
Erosions
Level difference: Khimti I: 16-20 cm
Produce sediment
Concrete at walls and invert and
shotcrete at crown.
Avoid risk of voids at crown
Final lining issues
Water leakage =>
shotcrete supported and
unlined tunnels
Grouting:
Pre-grouting
Post-grouting
Grouting types
OPC,
MC,
PU: seepage, wide open
joint
Concrete lining
Conclusions
The Q-system => rock support design in Nepal.
GSI => Numerical modelling to validate rock
support design.
Final lining major issues are
air trapping in overbreak cavity,
voids behind steel ribs in dry stone packing,
cracked shotcrete in shear/weak zones,
reshaping of tunnel in squeezed sections,
necessity of concrete lining
water leakage in shotcrete supported tunnel
Most of hydro tunnels are performing well