STABLIZER MANUFACTURING PROCESS FLOW CHART

STORE
STORE OK Testing Stage
1- Visual
Inspection.
RAW MATERIAL A).Cabinet
WIRE Aesthetically
INCOMING ROUTING
Insp.
& VISUAL
INSPECTION NOT OK B). Cabinet
Printing,
C). Wire Routine.
CABINET PREPARATION
D). All
A & FITTING
OK Connection Must
be right & tight.
NOT OK
TESTING OF ALL 2- Electrical
PARAMETERS Inspection.
A). All parameters
OFF LINE TRANSFORMER
Check to
ACTIVITIES FITTING OK
REWORK According To
Specs.
TOP COVER
FITMENT
A B WIRE SOLDERING
PREPARATON OK PACKING

1-MAINS LEAD 1- STICKER PASTING


PREPARATION 2- METER FITMENT
SOAKING NOT OK
2-JOINTER AND CONNECTIONS
PREPARATION
W.H.
3-ANALOG GLUING OK
METER PCB
PREPARATION

FINAL NOT OK
QUALITY

B DAIL FITTING

OK