WORKING WITH LHD’s-

PRACTICAL PROBLEMS AND SOLUTIONS

PRESENTED BY,

KODATI SAMBASIVA RAO.


DY.MANAGER
GDK.NO.5 INCLINE.
LOCATION
SCCL HISTORY
• SCCL is a State Level Enterprise of Government
TELANGANA STATE .The Government of India has
started participation in the equity from the year 1960.

• The equity capital is shared in the ratio of 51:49 between


Government of TELANGANA STATE and Government
of India respectively.
ABOUT SINGARENI
• Mining coal since 1889
• Christened as Singareni Collieries Co. Ltd. on 23rd
December, 1920.
• Since 1945 it became a Government company as The
Nizam of Hyderabad acquired the shares.
• From 1960, the Government of India participated with
49% share and the remaining 51% is with Government
of AP.
Our Technology- underground.
Technology
•Conventional underground mining
•SDL & LHD
•Road Headers
•Longwall
•Blasting Gallery
•Continuous Miners
Singareni Mile stones
• Machine mining ( Joy loader & shuttle cars) in 1948.
• Electric coal drills in 1951.
• Electric cap lamps in 1953
• Flameproof electric equipment in 1954
• 3D Laser Scanner (for mine survey) in 2007
• ERP ( SAP) in 2008 ( first Govt. Coal producing Company)
• Diesel operated UG machinery : 2008
• Light weight Cap Lamps 2009 /2010
• Air conditioning of UG Mine – 2012
PRESENT STATUS OF SCCL
• Presently Singareni operates 29 underground mines and 19
opencast mines.
• Annual Coal Target 2017-18
» Coal – 66.6 Million tonnes
• Achieved - 61.77 Mt upto 30-3-2018
• Annual coal Target for 2016-17 – Coal – 53.10 Mt
Achieved - 61.09 Mt

Total Employees 56,282 (as on 31-03-2018)


PRACTICAL PROBLEMS & SOLUTIONS
WHILE UTILISATION OF LHD.
1. Unauthorised driving. Trained person employed for operation and to
2. Uncontrolled movement of follow SOP as per reg.217& 208.
LHD. Ensured by the MS/OM reg 48/47
3. Negligent driving.  see the operations carried out as per SOP. And
4. Utilisation of untrained ensured by the OM.
person
5. Unauthorised operation by All Corners belts shall be provided to avoid
standing on bucket. damage of cableat corners
6. Not providing corner belts. 
 Maintenance of machinery properly and
7. Brake failure. ensuring the working condition of equipment
before operating - reg 213
8. Absence of warning devices.
 Any defect found inform to superiors
9. Improper hyd.hose immidiatly
connections.
 Canopy shall be provided always to LHD-reg
10. Improper canopy. 214.
PRACTICAL PROBLEMS & SOLUTIONS
WHILE UTILISATION OF LHD.
11.Tyre burst Regular maintenance shall be done
12.Tyre inflation pressure. as per maintenance schedule reg
208,209,213
13.Tyre replacement.
While tyre replacement & bolts
14.Tyre wheel bolts tightening. tightening follow the COP reg110 .

15.Improper anchorage of cable Proper anchorage to be fixed reg


209
16.I bolt to be provided for
lifting to change the roll back ensure status of I bolts, before
cylinders& motor. commencement of work -reg 208.
PRACTICAL PROBLEMS & SOLUTIONS
WHILE UTILISATION OF LHD.
17. LHD tyre transport loading and Transportation of LHD tyre
unloading. loading and unloading as per
COP (reg110) reg 208.
18. Inadequate manpower. Adequate manpower shall be
provided relevant to work as per
COP,SOP.
19. Using unrecommended oils,  Use only manufacturer
improper handling, filling and recommended oils and proper
spillage. equipment and tool for handling
and filling to prevent the spillage
PRACTICAL PROBLEMS & SOLUTIONS
WHILE UTILISATION OF LHD.
20. Failure of safety futures (Temp. Use approved/specified type
switch, low level oil switch, over limit appliances shall be used-reg 208
switch, Stop button, emergency stop  Every person in charge of any
button, foot switch, AVA and lights) missionary apparatus or appliances
21. Non functioning of fire fighting shall before commencing work see
arrangement. that it is in proper working order-reg
213
Examine all the equipment material
and arrangement provided for fire
fighting and shall discharge refill the
fire extinguishers any deficiency found
immediately remedied and ensure
these are in proper working order -
reg139
PRACTICAL PROBLEMS & SOLUTIONS
WHILE UTILISATION OF LHD.
22. Transport of material: LHD shall not be used for
Using LHD for transportation of transportation of any material
material such as Bricks, Chock which is endanger to the safety of
timber, Drive unit, Belt material, the employed persons and
Axels, Motors, and Tyres. equipment.
23. Toppling of LHD.  In charge of the LHD shall not be
permit to do malpractice works
and ensure to follow the COP and
SOP-reg 110 and 208.
24. Failure of power while moving in Proper parking break shall be
gradient with load or empty. applied and stoppers shall be
placed all tyres properly and
fenced off approaches towards
down from LHD.
PRACTICAL PROBLEMS & SOLUTIONS
WHILE UTILISATION OF LHD.
25. LHD Marching  LHD Marching should be carried
(Surface to Underground , under direction of supervisor as
Seam to Seam, within the seam per guidelines of concerned
and within the districts/panels) Engineers and follow the COP.
reg-208
 To prevent the accidents and to
26. Not following SOP for regular provide the safety, health,
maintenance and repair. convenience and discipline of
the persons so employed the
implementation of safe COP is
required and should be ensured
by concerned Engineer. reg-208.
PRACTICAL PROBLEMS & SOLUTIONS
WHILE UTILISATION OF LHD.
27. Inadvertent entry of persons  District Sirdar shall be
in the LHD plying area. communicated to all the
workmen in the district/panel
about movement of LHD route
and operations carried out as
per COP reg-48.
Ensured by the district overman.
Reg-47.
LOAD HAUL DUMPER SAFETY FEATURES.

1. HEAD LIGHTS
2. OPERATOR’S CANOPY
3. DUMP VALVE
4. PARKING BRAKES & SERVICE BRAKES
5. GONG BELL
6. AUDIO VISUAL ALARM
LOAD HAUL DUMPER SAFETY FEATURES.

7. EMERGENCY STOP BUTTON


8. DEAD MAN SWITCH
9. FLOAT SWITCH
10. TEMPERATURE SWITCH
11. CABLE OVERRIDING SWITCH
12. PILOT CORE PROTECTION
13. PUSH BUTTON STATION
14. BRAKE ACCUMULATORS
15. HOUR METER READING
TECHNICAL SPECIFICATIONS OF
LOAD HAUL DUMPERS
DESCRIPTION 912E LHD [OLD] 912E LHD [NEW]
ELECTRIC MOTOR 100HP,550V,1470RPM 100HP,550V,1470RPM
TRANSMISSION HEAVY DUTY CLARKE HEAVY DUTY CLARKE
TRANSMISSION 32000 SERIES TRANSMISSION 32000 SERIES
BUCKET PUSH PLATE PAY 4000KGS 4000KGS
LOAD
BUCKET BREAKOUT FORCE 6700KGS 6700KGS
BUCKET CAPACITY 2.7 CU.M HEAPED 3.0 CU.M HEAPED
AXLE DETAILS NO SPIN, PLANETARY WHEEL NO SPIN, PLANETARY WHEEL ENDS,
ENDS, OIL IMMERSED BRAKES, OIL IMMERSED BRAKES, DAVID
DAVID BROWN BROWN
MACHINE WEIGHT 11.5TONS APPROX. 12.5 TONS APPROX.
MACHINE DIMENSIONS 7.85 X 1.9 X 2.1 7.85 X 1.9 X 2.1 [IN METRES EACH]
[LxWxH]
MAX DUMPING HEIGHT 2.7M 2.70 M
MAX. TURNING RADIUS— 2.37M 2.37 M
INNER
MAX. TURNING RADIUS— 4.7M 4.70 M
OUTER
SPEED --- 1st GEAR 5.2 3.5 KMPH
SPEED --- 2nd GEAR 9.0 5.2 KMPH
SPEED ---3rd GEAR 12.5 9.0 KMPH
TRANSMISSION CHARGE GEAR TYPE 20GPM GEAR TYPE 70GPM
PUMP
HYDRAULIC PUMP GEAR TYPE 210LPM GEAR TYPE 210LPM
TRANSMISSION CLUTCH 245-280 245-280 PSI
PRESSURE
BRAKE PRESSURE 1400-1800 1400-1800 PSI
STEERING PRESSURE 2000 2000 PSI
BUCKET OPERATIONS PR 1800 1800 PSI
CABLE REELING-WINDING 900-1200 900-1500 PSI
CABLE REELING-UNWINDING 600-900 600-900 PSI

STEERING ACCUMULATOR PR. ---- ----

BRAKE ACCUMULATOR PR 1000PSI 1000PSI


PILOT HYDRAULIC PRESSURE 400PSI 500 PSI
PILOT HYDRAULIC PRESSURE 400PSI 500 PSI

NO OF HYD. PUMPS 1 NO- 210 LPM 1 NO- 210 LPM


NO OF HYD MOTORS 1NO CRM 1NO CABLE REEL MOTOR
NO OF HYD RAMS 6 NOS --- LIFT-1; R/B-1; STEERING- 6 NOS --- LIFT-1; R/B-1; STEERING-2;
2; PUSH PLATE-2 PUSH PLATE-2
OPERATING GRADIENT- 1 IN 5 1 IN 4
INLINE
OPERATING GRADIENT- 1 IN 6 1 IN 5
LATERAL
ARTICULATION ANGLE 22.5 DEG 22.5 DEG ON EITHER SIDE
OSCILLATION ANGLE BOLSTER +/- 8 DEG BOLSTER +/- 8 DEG
CABLE REELING 120 MTRS RANDOM 120 MTRS RANDOM REELING
HYDRAULIC OIL & CAPACITY HFB-68 FRHF, 340 LT HFB-68 FRHF, 340 LITRES

TRANSMISSION OIL & C3/C4 SAE30, 35 LTR C3/C4 SAE30, 35 LTR


CAPACITY
AXLE/DIFFERENTIAL OIL & 15 W 40, 24 LTR 80 W 90, 72 LTR
CAPACITY
GREASE POINTS 35 POINTS 35 POINTS
LINKAGE-9 RAMS-12 LINKAGE-9 RAMS-12 PEDESTALS-
PEDESTALS-1 1
BOLSTER-1 ARTICULATION-2 BOLSTER-1 ARTICULATION-2
CRD-1+5 CRD-1+5
ELECTRIC MOTOR-2 RADIATOR ELECTRIC MOTOR-2
FAN SHAFT BEARINGS----2 RADIATOR FAN SHAFT BEARINGS----2

RADIATOR FAN BELT DRIVEN BY ELEC MOTOR@ BELT DRIVEN BY ELEC MOTOR@
2200RPM 2200RPM
SUCTION FILTER 40 MICRONS
RETURN FILTER 10 MICRONS
TRANSMISSION FILTER 100 MICRONS
LIGHTING VOLTAGE 24 V A C
PILOT VOLTAGE 12 V RECTIFIED WITH H.W RECTIFIER

AVA VOLTAGE 12V D C


TYRES 14 X 25 TUBED TYRE; PRESSURE-90 PSI
FOR 20 PR AND 120 PSI FOR 24 PR
MAINTENANCE SCHEDULE
SNO SCHEDULE CHECK POINT

1 Every day Check oil levels, check all connected bolts and drive line bolts
tightness, greasing of greasing points and leakages
2 100 Hrs Front and rear axles oil checking and topping
3 1000 hrs Front and rear axles oil replacement
4 500 hrs Hydraulic filter replacement
250 hrs Transmission filter replacement
5 Hydraulic oil replacement
1000 Hrs Hydraulic suction strainer cleaning
500 Hrs Transmission oil filter replacement
6 Every day Brakes pressures checking and accumulator pressures
checking
7 100 Hrs Transmission clutch pressures checking

8 100 Hrs Hydraulic pressures checking

9 500 Hrs Transmission and motor alignment checking and axle


mounting bolts tightness checking
10 500 Hrs CRD slip ring checking and Junction box isolator and
connected cable, pilot circuit checking
GREASING POINTS
SNO LOCATION QTY IN NOS

1 RAMS. 12
.
2 LINKAGE [BKT ARM+DUMP LEVER+LINK ASSEMBLY] 9

3 PEDESTAL BEARING 1

4 BOLSTER BUSH 1

5 ARTICULATION 2

6 CABLE REEL DRUM 1+5=6

7 RADIATOR FAN SHAFT BEARINGS 2

8 ELECTRICAL MOTOR 2

9 TRANSMISSION GEAR LEVER 2

10 DUMP LEVER 1

Total 38 points
INDIAN STANDARDS
FOR SAFETY MANAGEMENT SYSTEM
Apart from legislation and circulars the guidelines given in the
following indian standards may also considered for preparation of
SMP

1. IS 18001:2007 (occupational Health and safety Management


System)

2. 31000:2009 (Risk Management principle and guidelines)

3. 15656:2006 (Hazard Identification and Risk analysis)


IMPORTANT OF SMP AS PER CMR-2017
Reg.38 – general responsibility of supplier manufacturer and designer

He shall give information on how to eliminate or control risk arising from the
identified hazard associated with the products

Reg.39- Responsibility of contractor

Provide for identifying hazard and the measures to eliminate and control risk
Provide relevant workplace safety and health hazards awareness and training to
their workers
Ensure compliance of the provisions of the Act and the Rule and Regulations
framed there under.
IMPORTANT OF SMP AS PER CMR-2017
Drastic amendments are made in CMR2017 emphasizing the need for risk
assessment /analysis and preparation and implementation of Safety Management
Plan which is regulatory innature

Reg.37_ duties of owner

Arrange regular assessment of the risks with a view to eliminate


/control/minimise the risk or else to [provide PPE
Take all necessary measures draw up and implement an operating plan(SMP)
Ensure preparation of an Emergency Response plan
Ensure adequate superviosion /training /accident to accident investigation and
regular health surveilliance of workers
IMPORTANT OF SMP AS PER CMR-2017
Reg.no 104-Safety management plan

O/A/M shall identify and assess the risk by appropriate process and record
the same and make available to all concerned.
O/A/M shall determine measures to eliminate/control/minimise the risk or
to provide PPE
O/A/M shall prepare an auditable document called SMP.
The SMP shall contain policy planning , methodology , PHMP , SOP’S , way
to measure / monitor / evaluate the performance of SMP and a plan to
review the SMP
O / A/ M shall responsible for effective implementation and periodically
review SMP.
IMPORTANT OF SMP AS PER CMR-2017

Reg.110 code of practice

Manager shall frame and enforce “”code of practice” before introducing


any machinary or operation with due regard to local condition

COP shall provide for safe operating procedures ,examination and testing
of machinery before first use and during regular use.

O/A/M shall handover the copies of COP for all concerned and readily
available in the office and respective places.
DGMS CIRCULAR NO 5 OF 2016
 Major Hazard categories identified.
1) Mine Fires
2) Inundation
3) Machinery
4) Strata control
5) Mine Gases
6) Electricity
7) Blasting & use of Explosive
8) Haulage & Transportation
9) Spontaneous combustion
10) Occupational Health
11) Emergency Response.
ELEMENTS OF PHMP
• I. Introduction
• 2.Identification of Hazard
• 3.Control procedures
• 4. Role & Responsibilities
• 5. Resources required
• Action response plan
• Communication
• Training
• Corrective action
• Review
• Audit
• Document control
• Records
PRACTICAL PROBLEMS & SOLUTIONS
WHILE USING BELT CONVEYORS
1. Engaging cleaning work while  No cleaning work shall be engaged
conveyor is in operation. while conveyor is in operation and
2. Non provision of suitable guards without constant supervision.
fence at drive head, tail end loop  Before commencement of
take-up. operation all belt conveyor safety
3. Non provision of safety features devises and appliances shall be
like lockout, pull card, anti provided and maintained in
backward running (Break working order. reg-97 and 211
thustor), sequence controller and
pre start alarm.  Where persons required to cross
4. Crossing over the belt when belt over the belt a cross over bridge
in motion. shall be provided.
PRACTICAL PROBLEMS & SOLUTIONS
WHILE USING BELT CONVEYORS
5. Checking the belt conveyor by COP  COP shall be check the belt working condition
i.e belt joints, drive unit, belt before commencement of operation and while in
straightness of running. operation and follow the SOP. If he found any
defect, stop the operation and inform to
concerned technician and supervisor/Engineer.
reg-208 & 213
6. While belt erection, transportation  Transportation and erection works shall be carried
of drive unit. under supervision of In charge. Code of practice
shall be followed. Ensured by the concerned
Engineer. reg-208

 Eye bolts fixing shall be carried under direct


7. Fixing of eye bolts. supervision of Sirdar with experienced persons for
good workmanship.
8. Devises and tools used for loading
and unloading of drive unit (Chain  Proper devises and tools must be used.
block, chain pulley, slings etc.)
PRACTICAL PROBLEMS & SOLUTIONS
WHILE USING BELT CONVEYORS
9. Provision of proper wiper and cleaner.  Proper wipers and cleaners shall be provided and
10. Non provision of fencing along the maintained properly
conveyor belt when used for travelling  Fencing should be provided along the conveyor belt.
roadway.
 Fire fighting equipment's and material shall be provided
11. Non provision of effective fire fighting at required places and maintained in working condition.
arrangements along the belt
 Adequate number of water spraying arrangements
12. Dust suppression arrangements are should be provided at every discharge point and
Improper. maintained in working condition.
13. Inadequate lighting along the conveyor
belt.  Adequate lighting shall be provided along the belt.
14. Non provision of the board of tele
communication numbers.
 All the telephone numbers of mine should be displayed
in board near to conveyor operator.
15.Non provision of signals along the belt.
 Proper signalling shall be provided and maintained.
16. Poor drainage system along the conveyor
belt.
 Proper drainage system shall be made and maintained.
PRACTICAL PROBLEMS & SOLUTIONS
WHILE USING BELT CONVEYORS
17. Transportation of material through  COP shall not be allowed to transport any
conveyor belts. material through conveyor belt and
ensured by the Fitter/Supervisor.
18. While removing belt material from old  Removal of belt material from old
workings. workings should be carried under
supervision of Sirdar and ensure proper
dressing and ventilation.
 Before commencement of installation COP
19. Absence of code of practice for shall be prepared and approved.
installation, operation, maintenance and Implement the approved COP for
repair of belt conveyor. installation, operation, maintenance and
repair of belt conveyor. reg-97
 Every person shall be educated and bring
the awareness,provide the Training about
20. Human failure installation, operation, maintenance and
repair of belt conveyor.
PRACTICAL PROBLEMS & SOLUTIONS
FOR STRATA CONTROL
• 1.GEOLOGICAL DISURBENCE 1.i) All information regarding
presence of geological
disturbences is gathered and
• i)Presence of geological method of workis…….
disturbance like faults , slip &
cracks No of workings will be made with
in 15 m of any known fault.
Support plan is prepared to
negotiate the geological
disturances and being
• ii)Presence of cleats , cleavage ii) Proper design of piller and
planes galleries and layout of gallieries in
oblique to main cleat direction.
PRACTICAL PROBLEMS & SOLUTIONS
FOR STRATA CONTROL
• 2.INADEQUATE SUPPORT  2 i) Based on the scientific study strata control
and monitoring plan is to be prepared in place
of existing-Cir.Tech.3/1993
• i) Improper support selection  As per existing SSR Hydraulic/Pneumatic roof
Bolters with Resin Capsules is used.
 The support plan is updated with changing
geological as well as mining methods and
accordingly appropriate support are selected-
Reg123/SOP.

 2 ii)The requirement of existing support plan


are being complied-Reg.no 123
• ii) Non-compliance of support plan
 3 ) procedure for erection /setting support as
• iii) improper erection /setting per SSR/SCAMP being complied.
PRACTICAL PROBLEMS & SOLUTIONS
FOR STRATA CONTROL
• 3.METHOD OF WORKING  i) Height and Width of galleries is being
maintained as per statutory provisions-
• i) Not maintaining height and width of the Reg.no.111
gallery

 Ii) Pillar are formed and maintained as per


• ii) Improper pillar design statutory provisionsReg.no.111
 iii) Manner of extraction is being followed as
• iii)Not fallowing the appropriate manner of per permission condition-DGMS Perm.
extraction  Iv) Rib reduction permitted under judicial
extraction.
• iv)Rib reduction not as per the permission  V-i) Correct horizon is being maintained as per
conditions permission conditions –Blasting practice
permission.
 ii) Proper blasting pattern is being followed to
• V) Not maintaining correct roof horizon maintain the correct horizon
 iii) Proper supervision is being done by
officials to maintaine correct roof horizon
PRACTICAL PROBLEMS & SOLUTIONS
FOR STRATA CONTROL
• 4.INDEQUATE RESOURCES 4-i) Educate and training is being given to
all frontline supervisors&workmen at
• i)Lack of training to workers and regular intervals
supervisors
Ii)Adequate number of support persommel
• ii) inadequate support personal including standing crew is being
• iii) inadequate support material maintained in each shift.
Iii) Adequate support materials is
maintained in all working places

5 -i) proper tools for testing the


• 5. LACK OF PROCEDURE FOR ROOF & SIDES competency of roof and sides are
MONITORING beingissued and used-Reg.no47& 48
• i) Not using proper tools ii)Roof/Sides testing & dressing is being
• ii) Dressing of Roof &Sides done properly-Reg.no48
• iii) Improper Supervision iii)Educate and training is being given to all
front line supervisiors-Reg.no.44
PRACTICAL PROBLEMS & SOLUTIONS
FOR STRATA CONTROL
• 6.ROOF&SIDES FALLING IN 6-i) Voids are being stowed complety
STOWING AREA
• i) Inadequate stowing ii) Voids are being stowed within the
permitted time.-DGMS Permissions
iii)Good quality of stowing material is being
• Ii)More than permitted delay in supplied-
stowing voids iv) Barricade erection is being done
properly-SOP.
• Iv)Inferior quality of barricade
erection V) All precautions are being taken to avoid
formation of overhangs of roof & sides-
Reg.no 111
• V)Presence of over hangs
 Formation of over hanging in the roof &
sides are being dressed properly & support
• Vi) Non compliance of conditions securely.Reg.no124(10)&(11)
regarding voids Vi) Permission conditions regarding voids is
being complied strictly
PRACTICAL PROBLEMS & SOLUTIONS
FOR STRATA CONTROL
• 7.ROOF FALL IN FRESHLY i)All requirements of supports are being coplaied-
EXPOSED ROOF Reg.no123

• i)Non compliance of support plan ii)Training and Re-Training is being given to all front
line supervisors & workmen for effective
implementation support plan.-Reg.no44& SOP

• Ii) improper and inadequate support 2) Adequate and Good quality support material is
material being provided in the mine.

• III) delay in erection 3)Freshly exposed roof and sides being supported
immediately
• Iv)solid blasting conditions are not
being complied 4) All required Solid blasting conditions are being
fallowed
• V)Blasting pattern not fallowed
5)Approved type blasting pattern is being followed.
PRACTICAL PROBLEMS & SOLUTIONS
FOR STRATA CONTROL
 i)The procedure prescribed in the support plan regarding the
• 8.MONITORING OF SUPPORT monitoring of supports is being complied-Reg.no123/SOP
• i) Non compliance of support plan
 ii) Training and Retraining is being given to all front line
supervisors & workmen for effective monitoring of supports-
• Ii) inadequate training to workers and Reg.44
supervioses
 iii) conventional convergence recorders are being installed and be
• Iii) lack of procedure to monitor the supports monitored regularly-DGMS Perm.

• IV) not conducting the anchorage testing  iv) Anchorage testing being done regularly and the machine is
being calibrated regularly-SOP
• V) not conducting Short Encapsulation
Testing(SEPT)  Short encapsulation pull test is being conducted regularly-SOP

• VI) NOT ENSURING THE TIGHTENING OF THE  Roof bolt are being tested for its tightness regularly-SOP
SUPPORT
 Resin capsules are being stored at degrees.
• Improper storage of the resin capsules
MINE FIRES DUETO WELDING AND GAS
CUTTING
• SPARKS FROM WELDING OR GAS PROPER WELDING/GAS
CUTTING CUTTING PROCEDURES ARE
BEING FALLOWED-Reg.no100

• IMPROPER MAINTAINANCE AND PROPER HANDLING & STORAGE


HANDLING OF GAS CYLINDERS &USAGE PROCEDURES ARE
BEING FALLOED-Reg.no100

• NON COMPLAIANCE OF
STANDARED PROCEDURES STANDARD PROCEDURES ARE
BEING FALLOWED-Reg.no100
MINE FIRES DUETO PRESENCE OF COAL DUST
• Blasting Proper blasting procedures are
being followed–Reg.no143

• Inadequate dust suppression


arrangements at the dumping and
transfer points
• Spillage of coal along the conveyor Dust suppression and cleaning
belta arrangements are provided and
• Generation of coal dust at strata maintained –Reg.no143
bunkers and lorry loading bunkers
• Improper cleaning at gearhead and
tailend

MINE FIRES DUETO CONVEYOR BELTS

• Improper installation of conveyor Proper installation maintainance


belts ,operation &use of conveyors are
• Improper maintainance of conveyor being done-Reg.no 97
belts
• Not using approved type of conveyor
belts and parts of conveyor system
• Improper cleaning at Dust suppression & cleaning
gearhead.tailend,transfer,discharge arrangements are being done-COP.
pointsand along conveyor belt

• Non provision of effective fire Equipment for Fire fighting are being
fightingarrangements near provided as per statue-Reg.no139
gearheadand all along the belt.
MINE FIRES DUETO UNDERGROUND MACHINERY
• USE OF FRHF OILS  FRHF OILS ARE BEING USED-Reg,no172

• SPILLAGE OF OILS ON HOT SURFACE  LEAKAGE ARE BEING ARRESTED & PROPER OIL FILLING
ARRANGEMENTS ARE BEING DONE-Reg,no172

 DGMS APPROVED RATED HOSES ARE BEING USED-


• USE OF NON APPROVED HYDRAULIC HOSES Reg,no172

• NON PROVISION OF TRIPPING MECHANISAM  OVER TEMPARATURE TRIPPING ARRANGEMENT ARE BEING
IN CASE OF EXCESSIVE HEAT GENERATION MAINTAINED-Reg,no172

• IMPROPER ELECTRICAL CIRCUITS IN THE  DAMAGE CABLES ARE BEING REMOVED-Reg,no172


MACHINARY

 PROPER LUBRICATION & REPLACEMENT OG BERING ARE


• HEAT GENERATED DUETO FRICTION OF BEING DONE-Reg,no172
MOVING PARTS

 AS PER MAINTAINANCE SCHEDULE OILS ARE BEING


• IMPROPER MAITAINANCE OF OILS AND REPLACED & HOSES HAVING VISIBLE DEFECTS ARE BEING
HOSES BEYOND THE EXPIRY DATE REPLAACED-Reg,no172
MINE FIRES DUETO ELECTRICAL CABLES AND EQUIPMENTS
• 1.Continuous over loading of cables  proper retaining cables
• 2.inadequate insulation of cable
 Periodically measure of IR values
• 3.damage of cable due to fall of object
 Properly laying of cables are being done
• 4.use non approved cables
• 5.failure of intrinsically safe apparatus  Approved cable are being used
• 6.short circuit of cables  FLP features are being maintained
• 7.by-passing of EL/OL protection  Intrinsically Safe features being done
• 8.presence of moisture in electrical  Proper terminal connections of cables being done
equipment
• 9.improper laying of electrical cable  EL/OL Protections relays is being strictly maintained
• 10.not fallowing standard procedure for  Competent persons are being deployed
cable jointing and joint boxes
 Adequate steps are being taken to avoid exposure of
• 11.Deployment of incompetent persons in
installation , operation, maintenance & electrical equipment to humidity
repair of electrical equipment  Cable are being laid properly
• 12.NOT FALLOWING SHUTDOWN
PROCDURES  Recommended joint kits are being used with proper
earthing
MINE FIRES DUETO SPONTANEOUS HEATING
• Lose coal at return airways Loose coal is being removed –COP
and unsed workings
Stowing is being done up to to the IS-Reg.no
• Improper stowing up to IS. 112(9)

• Breathing through cracks of Isolation stopping to be maintained as per


Lack of proper inspection statute-Dgms cir Tec3(1988)
As for as practicable loose coal is being
cleared-Dgms cir Tec3(1988)
Adequate ventilation is being provided-
Dgms cir Tec3(1988)
Schedule were prepared for making of
inspections as per statute and records are
being maintained-Dgms cir Tec3(1988)
MINEFIRES DUETO LACK OF KNOWLEDGE ON
PROCEDURES

• WORKMEN AND SUPERVISORS WORKING AND SUPERVISORS-Rule


ARE NOT TRAINED no.3 VTCR-1966

• NON DEPLOYMENT OF COMPETENT PERSONS ARE BEING


COMPETENT PERSONS DEPLOYED-Rule no.3 VTCR-1966

• LACK OF SURVELLIANCE TO BE PROPER SURVELLIANCE


IMPLEMENT THE PROCEDURES PROCEDURE ARE BEING
FALLOWED-Rule no.3 VTCR-1966
PRACTICAL PROBLEMS & SOLUTIONS
FOR OCCUPATIONAL HEALTH
• 1.LIGHTING 1. Reg.no.178 dgmscirno6&7/2016

• 2.NOISE 2. Reg.no.209,Reg.no.242 dgms


cir.29/1974,1/1983,28/196

• 3.VIBRATION
3. Reg.no.209

• 4.TEMPARATURE/RADIATION 4. Reg,no.153 Reg.no.209;Reg.no144,145,Rule


no 62/MR-1955;Reg.no 242

• 5.DRINKING WATER
5.Rule no.30,31 of MR-1955
PRACTICAL PROBLEMS & SOLUTIONS
FOR OCCUPATIONAL HEALTH
• 6.FATIGUE • 6.Reg.no.(93)& 153

• 7.DUST • 7.Reg.no 143,97,143,144,145,123


dgms cir 42/1974

• 8.EXPOSURE TO CHEMICAL • 8.Reg.242 dgms


cir.no.29/1974,1/1983,28/1967

• 9.SANITATION • 9.Ruleno:33,34,35,36,37,38 of MR-


1955

• 10.HUMIDITY
• 10.Reg no 153
PRACTICAL PROBLEMS & SOLUTIONS
OF ELECTRICAL SYSTEM
• 1.FAILURE OF INSULATION
• N2. FAILURE OF EARTH
CONTINUTY
• 3. EXPOSER OF LIVE
CONDUCTORR
• 4 INDUCTION EFFECT.
• A)SHOCK
• B)BURNS
• C)FIRES
• D)NOXIOUS GASES
• E)LIGTING
• F)HUMAN FAILURE.
PRECAUTIONS
• DO NOT STALL THE MACHINE FOR MORE THAN A
SECOND OR TWO TO AVOID UNDUE HEATING OF
THE HYDRAULIC FLUID.

• SIMILARLY, DO NOT STALL THE HYDRAULIC RAMS


BEYOND THEIR LIMITS FOR MORE THAN A SECOND
OR TWO OTHER WISE, THE HYDRAULIC FLUID GETS
HEATED UP.
NEVER USE THE BUCKET TO SCALE
THE ROOF / FLOOR / FACE / SIDES OF THE GALLERY,
SINCE IT CAN DAMAGE THE MAIN LIFT RAMS OF THE
BUCKET .
.
I WISH U ALL D
BEST
THANK YOU