WELCOMES

SEARJANT & LUNDY


ENGINEERS

FOR THE BRIEF


ON

TARIFF DETERMINATION
TERMINOLOGIES
• GCV – KCAL/KG
• TURBINE HEAT RATE
• BOILER EFFICIENCY
• TURBINE EFFICIENCY
• GENERATOR EFFICIENCY
• STATION HEAT RATE
• AUXILIARY POWER CONSUMPTION
• SPECIFIC LIGNITE CONSUMPTION
• SPECIFIC SECONDARY FUEL CONSUMPTION
• MANPOWER
REGULATORY REGIME

• NO MORE COST + APPROACH

• REGULATORY REGIME ( CERC/SERC)

• DESPITE PPA BETWEEN BUYER & SELLER ,TARIFF


FIXED BY REGULATORS.

• PUBLIC HEARING THROUGH NOTIFICATION.


TERMINOLOGIES
• TARIFF= FIXED COST+ VARIABLE COST ( ENERGY
CHARGES)
 F.C IS FIXED IRRESPECTIVE OF GENERATION
V.C VARIES WITH GENERATION
ELEMENTS OF FIXED COST
INTEREST ON LOAN
DEPRECIATION
RETURN ON EQUITY
O& M EXPENSES
INTEREST ON WORKING CAPITAL
TERMINOLOGIES
• COD- COMMERCIAL OPERATION DATE
• INFIRM POWER
• AUXILIARY POWER CONSUMPTION- ENERGY CONSUMED BY
AUXILIARY EQUIPMENTS AND TRANSFORMER LOSSES WITH
IN THE GENERATING STATION.
• AVAILABILITY / PLF – 75% FOR LIGNITE BASED UNITS
- 80%FOR LIGNITE BASED UNITS

GROSS STATION HEAT RATE DURING


STABILISATION PERIOD & SUBSEQUENT PERIOD
SECONDARY FUEL OIL CONSUMPTION
SPARES @ 2.5% OF PROJECT COST
FIXED COST ELEMENTS
• DEPRECIATION – RESIDUAL LIFE OF ASSET-
10%
• DEPRECIATION ALLOWED UPTO A MAXIMUM
OF 90% OF THE PLANT (90/25=3.6%)
• RETURN ON EQUITY- 14% PER ANNUM
• O&M EXPENSES- 12.17 LAKH/MW FOR 200-
250 MW UNITS & 10.95 LAKH/MW FOR 500
MW & ABOVE
• INTEREST ON WORKING CAPITAL
INTEREST ON WORKING CAPITAL
• COST OF COAL – 1.5 MONTHS FOR PIT HEAD AND 2
MONTHS FOR NON-PIT HEAD STATION
• COST OF SECONDARY FUEL FOR 2 MONTHS
• O& M EXPENSES FOR ONE MONTH
• MAINTENANCE SPARES @1% OF THE PROJECT COST
ESCALATED AT 6% PER ANNUM FROM THE DATE OF
COD
• RECEIVABLES EQUIVALENT TO 2 MONTHS OF FIXED
& VARIABLE CHARGES FOR SALE OF ELECTRICITY
CALCULATED ON THE TARGET AVAILABILITY
TERMINOLOGIES
• LANDED COST OF COAL- INCLUDES ROYALTY,
TAXES AND DUTIES, FRIGHT, NORMATIVE
TRANSIT & HANDLING LOSSES
• LOAN REPAYMENT – 10 YEARS FROM COD
• FIRST YEAR AFTER COD IS CALLLED THE
MORATORIUM PERIOD
• SPECIFIC FUEL CONSUMPTION
• SPECIFIC SECONDARY FUEL CONSUMPTION
Thank you