Professional Documents
Culture Documents
Master Draft Rev 7.1 - Internal - Sustaining National Capability in SM Design - Proposal
Master Draft Rev 7.1 - Internal - Sustaining National Capability in SM Design - Proposal
IN SUBMARINE DESIGN
THROUGH PARTNERSHIP BETWEEN NAVY AND LARSEN & TOUBRO
Artillery | Military Communication | Submarines & Warships | Weapon & Engineering Systems
Contents
Background
Options Considered
Justification
Business Viability
Artillery | Military Communication | Submarines & Warships | Weapon & Engineering Systems
Background
Submarine design and construction – high value strategic capability
Quest for self sufficiency: Early 1980s – SSK Project – Naval team trained in submarine design; TOT
for construction to MDL
Last 38 years: Significant strides in creation of ecosystem through SSK, ATV and P-75 Projects
Role of Larsen & Toubro in realizing such
sustainable capability merits consideration.
Experience of Construction and integration – L&T and MDL
Platform Functional Design - Sole purview of Navy
Artillery | Military Communication | Submarines & Warships | Weapon & Engineering Systems
AIM
Artillery | Military Communication | Submarines & Warships | Weapon & Engineering Systems
Submarine Design Practice of Leading Nations:
Lessons From Experience
Leading Countries (USA, Russia, UK, France ): > 100 years experience
• India – young entrant in niche club
Submarine design &
construction capability:
14 countries In all countries: Submarine design initially in navy’s charter
• Shipbuilder and navy participate in all phases of design from conceptual phase
through delivery
• IPPD has resulted in speeding up design process and reducing cost
Artillery | Military Communication | Submarines & Warships | Weapon & Engineering Systems
Lessons From Experience of Leading Nations
2 4 6
Artillery | Military Communication | Submarines & Warships | Weapon & Engineering Systems
Submarine Design Practice in India: Constraints & Challenges
Directorate
Constraints of Naval Design
in effectively (Submarine
sustaining Design Group),
design capability due : DND (SDG) set
up at Naval HQ, 1986
Submarine Design not primary charter of Navy - considerable drain of naval resources
Inability to provide adequate manpower - conflicting manpower requirements for
Design know-how,
operationally critical tasks Strength: About 85 naval
normative
Naval officers
manning policies such as limited tenure durations,
documentation, design
- small
need compared to varied
for exposure
appointments – not conducive for continuity requiredother
software acquired
submarine design
for design
agencies in the world
Narrow pyramidal promotion structure leading to premature retirements - untimely loss of
through SSK, P-75 and
ATV Projects
expertise
Artillery | Military Communication | Submarines & Warships | Weapon & Engineering Systems
Constraints & Challenges
Manpower shortages being overcome by Navy through outsourcing
First of kind “Offsite Design Centre”, ODC set up Nov 2015 for future strategic
submarine design; contract awarded to L&T through competitive bidding process.
ODC model: Not optimal long term solution for sustaining submarine
design capability
Urgent need because:
to find long term solution towards
ODC specific to a project , contracted for limited duration (2 to 3 years)
sustaining submarine design proficiency
Design experience and skills not readily available; considerable time (and cost) invested to
train ODC personnel
Majority of personnel hired – attrition and repeated training cycle for new personnel
Contract awarded on a competitive basis. Cannot retain hired personnel beyond contract
duration leading to loss of expertise
Returns not commensurate with investment because of limited time available to utilize
proficiency acquired.
Artillery | Military Communication | Submarines & Warships | Weapon & Engineering Systems
Key Considerations of Solution to be Offered
Whose problem is it?
Authorities at highest decision making Need to sensitize authorities
levels not sensitized of problem.
Navy unable to address the situation.
Artillery | Military Communication | Submarines & Warships | Weapon & Engineering Systems
Why L&T is a natural partner ?
L&T and MDL - only two submarine construction entities in country
All Submarines without TOT - construction L&T MDL All submarines under TOT
processes and practices developed in-house No experience / expertise in
Undertaken:- submarine design - P-75 Contract:
Detailed engineering for Arihant & Transfer of Design Documentation
follow on vessels (TDD) only to Navy
Extensive design change management in
follow on vessels
Detailed design & engineering of next
generation Underwater Launch Platform,
P-80; functional design of key systems
L&T has large pool of ex-naval officers - many former DND (SDG) - knowledge base of submarine design available
L&T Submarine Design Centre (SDC), Mumbai - proficient in usage of state of art 3D CAD-PLM software suite.
Establishing 3D CAD-PLM system identical to DND (SDG)
L&T assisting DND (SDG) in preliminary design of future strategic submarine, S5 through Offsite Design Centre.
Has gained :
Rich insight in application of design normative documentation
Experience in preliminary design of submarines
© 2018 Larsen & Toubro Limited : All Rights Reserved
Artillery | Military Communication | Submarines & Warships | Weapon & Engineering Systems
Stages of Submarine Design
Artillery | Military Communication | Submarines & Warships | Weapon & Engineering Systems
Options Considered
Artillery | Military Communication | Submarines & Warships | Weapon & Engineering Systems
Options: Comparison
Pros Cons
A) Creation of a joint L&T would be involved in all design stages Very difficult for naval and L&T personnel to
Navy-L&T “National (Concept to Detailed Design) work in seamless organizational structure.
Submarine Design Hierarchy will always exist
Lack of independence in day to day functioning
Bureau”
Lack of accountability: potential blame game
Conclusions: scenario
- Work Share
B) Delineated Design model
Independence with delineated responsibility
in functioning is in early stages of
L&T will not be involved
Stage Work Share most suitable
Clear demarcation of role and responsibility
option from Company’s design
perspective
and Responsibility May be able to function from existing SDC at
Mumbai – better command and control
- Will catalyze gradual delegation of responsibility
from navy toa long
Would be industry / yard.
term engagement Lack of independence in day to day functioning
C) Long Term (Not Steady revenue No direct responsibility for the work done; no
Project Specific) ODC L&T could be involved in all design stages – recognition
gain experience in preliminary and functional Experience gained by / knowledge imparted to
design individuals; no institutional learning
Artillery | Military Communication | Submarines & Warships | Weapon & Engineering Systems
Proposed Solution: Partnership Between Navy and L&T
for Submarine Design
• Proposal : Larsen & Toubro to share submarine design workload and responsibility
for conventional & nuclear submarine projects with Indian Navy
• Submarine Design Stages: Present and Proposed Workshare
Duration No. of Present Proposed
Design Stage Remarks
(Years) Designers Responsibility Responsibility
Concept Design 1 to 1.5 30 to 40 Navy Navy
Sketch / Preliminary Design
Small L&T team to
1.5 to 2 80 to 100 Navy Navy
associate
Technical / Functional /
2 to 3 220 to 250 Navy L&T Oversight and
Contract Design
periodic reviews by
Workshop / Detailed Design Yard (L&T) for
5 to 7 400 to 450 L&T Navy
ATV submarines
© 2018 Larsen & Toubro Limited : All Rights Reserved
Artillery | Military Communication | Submarines & Warships | Weapon & Engineering Systems
Partnership Between Navy and L&T for Submarine Design
Salient Aspects
Functional design by L&T at Submarine Design Centre (SDC), Mumbai
of Proposal
Positioning of L&T liaison team at DND (SDG) for day to day interactions
Artillery | Military Communication | Submarines & Warships | Weapon & Engineering Systems
Benefits of the Proposal
Optimize number of naval personnel in submarine design – utilization for operationally critical functions
Ensure continuity of personnel in design - continuity & retention of knowledge base & expertise
Design - Joint effort of the Navy and L&T. Quality would benefit from :
- Operational knowledge and user insight of Navy
- Practical construction knowledge and experience of L&T
Provide employment (by L&T) of competent, knowledgeable & experienced naval officers after their naval careers –
retain such competence & experience within ecosystem
Provide seamless transition from functional to detailed design and construction process
Better understanding of design requirements by yard (L&T) – potential reduction in overall construction time & cost
Artillery | Military Communication | Submarines & Warships | Weapon & Engineering Systems
Justification
Artillery | Military Communication | Submarines & Warships | Weapon & Engineering Systems
Business Viability Design Cost (10% of Vessel Cost)
Period under Consideration – 10 years ( 2022 -2031) Concept
Design
1%
S5 WD contract in 2021 – 800 Crores (4% of cost of vessel) Workshop Preliminar
Design y Design
2%
Likely SSN Functional Design contract 4%
Strength of the Design Year 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031
Bureau over 10 years Manpower 200 200 200 400 400 400 400 200 200 200
Artillery | Military Communication | Submarines & Warships | Weapon & Engineering Systems
Suggested Plan of Action
Artillery | Military Communication | Submarines & Warships | Weapon & Engineering Systems
THANK YOU