Problem Parameters To Adjust Effect
Problem Parameters To Adjust Effect
100%
Frequency % < Error
80%
Avg / Std Dev’n
60%
0.3 / 0.1 m
40%
0.3 / 0.3 m
20% 0.8 / 0.8 m
0%
0 1 2 3
Collar Error (m)
0
2
4
8
6
10
12
14
16
2-3035-04
2-3035-05
2-3035-06
2-3050-01
2-3050-02
mm
2-3050-07 Average = 10.2 sec
d80 = 150
2-3050-13
2-3050-16
3-3290-02
Blast No.
3-3290-03
3-3290-04
3-3290-60
Bucket Fill Time
3-3305-01
3-3305-02
Dispatch Data Analysis
3-3305-03
d80 = 450 mm
Average = 11.9 sec
3-3305-04
3-3305-20
Factor (%)
Bucket Fill
60%
70%
80%
90%
100%
110%
120%
2-3035-04
2-3035-05
2-3035-06
2-3050-01
mm
2-3050-02
Average = 99.0%
d80 = 150
2-3050-07
2-3050-13
2-3050-16
3-3290-02
3-3290-04
3-3290-60
Bucket Fill Factor
3-3305-01
Dispatch Data Analysis
3-3305-02
Average = 91.6%
d80 = 450 mm
3-3305-03
3-3305-04
3-3305-20
Dispatch Data Analysis
Dig Rate
35000
30000
(t / hr) 20000
15000
Average = 26,405 t / hr
10000
Average = 21,320 t / hr
5000
0
2-3050-01
2-3035-04
2-3035-05
2-3035-06
2-3050-02
2-3050-07
2-3050-13
2-3050-16
3-3290-02
3-3290-03
3-3290-04
3-3290-60
3-3305-01
3-3305-02
3-3305-03
3-3305-04
3-3305-20
Blast No.
Holes_259-09
259_Design Toe
Blast Damage
Comparing Design & Actual Pit Profile
The Program - Chile
7. Site reports
8. Project report
Shovel Productivity – Project Justification
110,000
105,000
shovel)
100,000
95,000
90,000
85,000
80,000
0 50 100 150 200 250 300 350
Day