Professional Documents
Culture Documents
Risk Accessment
Risk Accessment
Risk Accessment
1. PRODUCTION
- USING ELECTRIC TOOLS, WELDING, BENDING, CUTTING MACHINE:
USING ENOUGH PPE, FIRE FIGHTING EQUIPMENTS AVAILABLE, DON’T
LAY ELECTRIC CABLE ON THE GROUND.
- REBAR, FORMWORK, CONCRETING WORK: MAKING PEOPLE INJURIES,
ELECTRIC SHOCK => SAFETY TRAINING, PPE, ARRANGE MATERIALS.
- CONCRETING AND DISMANTLING FORM: CAN BE HIT TO EYES AND
BODY OF THE WORKERS.
CONSTRUCTION SEQUENCE
2. DELIVERY
- TRAFFIC ACCIDENT: CHECKING LICENSED OPERATOR, SPEED LIMIT AND
GOOD ROAD, BRIDGE & ACCESS WAY. PROVIDE SIGNAL MAN TO
CONTROL.
- DROP MATERIAL: ENSURE HAND BRAKE IS ENGAGED & SPEED.
- CRANE FAILURE HIT TO WORKER OR STRUCTURE: INSPECTION OF
CRANE, INSTALL BARRICADE AROUND LIFTING AREA, SIGNAL MAN
- CRANE FALL DOWN: CHECKING GROUND CONDITION, WORKING
RADIUS OF CRANE. SET UP STEEL PLATE IF ANY.
CONSTRUCTION SEQUENCE
3. ERECTION
- CRANE FAILURE HIT TO WORKER OR STRUCTURE: INSPECTION OF
CRANE, INSTALL BARRICADE AROUND LIFTING AREA.
- CRANE FALL DOWN: CHECKING GROUND CONDITION, WORKING
RADIUS OF CRANE. SET UP STEEL PLATE IF ANY.
- COLAPSE OF CL/BEAM, WORKER FALLING FROM HEIGHT: TRAINING
WORKING AT HIGHT FOR WORKER, FREE STANDING NOT ALLOWED AND
PROVIDE BARRICADE AROUND LIFTING AREA.
- FALLING MATERIAL OR TOOL AND HIT TO WORKERS BELOW: USING
GUIDER, LAND YARD, PLAG MAN AND SAFETY NET IF ANY.
- WELDING AND WORKING AT HIGHT: PROVIDE PPE,
EXTINGUISHERS,SAFETY NET, SCAFFOLDING INSPECTION.
CONSTRUCTION SEQUENCE
SAFETY RISK ASSESSMENT ANALYSIS ATTACHMENT
CONSTRUCTION SEQUENCE
CONSTRUCTION SEQUENCE
CONSTRUCTION SEQUENCE
CONSTRUCTION SEQUENCE
CONSTRUCTION SEQUENCE
CONSTRUCTION SEQUENCE
CONSTRUCTION SEQUENCE
TENMA NOI BAI FACTORY PROJECT
CONSTRUCTION SEQUENCE
CONSTRUCTION SEQUENCE