Professional Documents
Culture Documents
Mall Project Delivery System (MPDS) : February 1, 2019
Mall Project Delivery System (MPDS) : February 1, 2019
Mall Project Delivery System (MPDS) : February 1, 2019
(MPDS)
February 1, 2019
PROJECT TYPE
Re-Zoning Renovation
PAM
Memo to proceed (Project
PROJECT Concurrent Area Tab (Design Brief Budget 1 Memo to proceed Feasibility) Budget 3
Planning & Initiation Concept Drawings SD/DD/FCD
MILE-
PARTIES Owner's Initial attached) (Parametric Budget) (Project Charter) Budget 2 (Cost Plan)
LOC
STONES Concept (Conceptual Budget)
A summary of the
DESCRIPTION
For New Con, a project various areas
An initial budget Memo addressed to A budget prepared
Approver
Budget 1 is derived feasibility determinations Budget. FAST 2 and Budget only set used for the purpose estimates.Budget 3 is
Improvement Projects, a new mall. developed property. information on initial Budget 1 are required Owners.
from Area Tab, made in Budget 1. 2 are required of construction. applicable for New
it is a project brief by design parameters of attachments.
Design Brief and OSS. attachments. Con Projects.
SCMC. project needed for
Budget 1.
PARTIES
Matrix Initiator
Land Acquisition
SMPHI-MRPD:
RGT
SCMC-Ops
Headed by:
AVP/ROM
EDD - Design
Headed by:
RDM
EDD - Design
Headed by:
RDM
EDD - PMG
Headed by:
PMG AVP
FAST 1 Attached
SCMC Ops
Headed by:
AVP/ROM
EDD - Design
Headed by:
RDM
Basis: Signed CD
EDD - PMG
Headed by:
PMG AVP
FAST 2 Attached
SCMC Ops
Headed by:
AVP/ROM
EDD - Design
Headed by:
RDM
EDD - PMG
Headed by:
PMG AVP
Checkers, n/a SCMC: EDD - Design EDD - Design EDD - PMG: SCMC: EDD - Design EDD - PMG: SCMC: EDD - Design EDD - PMG:
Conforme, BCM Checkers: Checkers: CMG AVP STT Checkers: CMG AVP STT Checkers: CMG AVP
Endorsers (not a signatory but OIC/AVP OIC/AVP OIC/AVP NAI OIC/AVP NAI
NEW DEVELOPMENT
THIS DOCUMENT IS a checker)
Conforme/Endorser:
FGH
`
Conforme/Endorser:
FGH
Checkers, SCMC: SCMC: EDD - Design EDD - Design EDD - PMG: SCMC: EDD - Design EDD - PMG: SCMC: EDD - Design
Conforme, STT BCM Checkers: Checkers: CMG AVP STT Checkers: CMG AVP STT Checkers: N/A
REDEVELOPMENT
Checkers, SCMC: EDD - Design EDD - Design EDD - PMG: EDD - Design EDD - PMG: SCMC: EDD - Design
Conforme, STT N/A Checkers: Checkers: CMG AVP N/A Checkers: CMG AVP STT Checkers: N/A
Endorsers OIC/AVP OIC/AVP OIC/AVP NAI OIC/AVP
Conforme/Endorser: Conforme/Endorser:
FGH FGH
Approvers HTS1 HTS1 EDD - Design: EDD-PMG P0-5M - STT HTS1 HTS1 P0-5M - STT EDD - Design:
A summary of the
DESCRIPTION
a checker) `
Redevelopment Initial Conforme/Endorser: FAST-R 1 Attached Conforme/Endorser: (Budget 2 for Redevelopment FAST-R 2 Attached
Concept FGH with Business
FGH is Budget 3 level; Basis is Onl y i f: -1% IRR or +1yr PB
FCD) or +10 % i n Area s / Cos t
(Project Summary) Plan
Approvers
Initiator Family
SCMC Board
Ops SCMC: HTS1 EDD - Design: EDD: SMPHI: Family Board HTS1 SMPHI: EDD - Design: HTS1
REDEVELOPMENT
A summary of the
DESCRIPTION
A summary of the
DESCRIPTION
An initial budget
from Area Tab, made in Budget 1. Memo
of addressed to
construction. A budget prepared
applicable for New
isitprompted with
is a project Land
brief by allocated
design to retail,of
parameters Memo addressed to
attachments. required attachments.
using the
Design Briefsubmitted
and OSS. Duly signed drawings at each Budget 2 provides a management requesting byDev
PMG using the
Projects.
Acquisition,
SCMC.which is Letter sent by Retail A draft Conceptual cinemas,
project parking,
needed for etc. management Conceptual drawings
Area Tab and cost design stage. These sets of more comprehensive approval to proceed with a FCD. Budget 3 can be
Purchase of property Affiliates/ Center Drawing that Design Brief
Budget 1. is requesting approval prepared by foreign
PARTIES for use of SMPHI. For Owned Affiliates to encapsulates the attached to Area
data on recently
to proceed with a designer from the inputs
drawings can be used for cost estimate to compare project, based on more used as the starting
completed projects. budget purposes. FCD is the to the budgetary and detailed drawings and point for Pre-bid
Redevelopment and confirm presence in owners' vision of the Tabulation to provide project. FAST 1 and of EDD Design and
Improvement Initial Budget 1 is derived FAST-I 1 Attached onlyBasis: Signed
set used the purpose FAST-I
for CD 2 Attached
feasibility determinations Budget. FAST 2 and Budget estimates.Budget 3 is
Improvement Projects, a new mall. developed property. information on initial Budget 1Business
are required Owners.
Concept from Area Tab, with of construction. Onl y i f: -1%
madeIRRin
orBudget
+1yr PB 1. 2 are required applicable for New
it is a project brief by design parameters of attachments.
(Project Summary) Design Brief and OSS. Plan or +10 % i n Area s / Cos t attachments. Con Projects.
SCMC. project needed for
Initiator SCMC Ops EDD - Design EDD - Design EDD - PMG SCMC Ops EDD - Design EDD - PMG SCMC Ops EDD - Design EDD - PMG
Budget 1.
PARTIES AVP/ROM N/A Headed by: Headed by: Headed by: Headed by: Headed by: Headed by: Headed by: Headed by: Headed by:
RDM RDM PMG AVP AVP/ROM RDM PMG AVP AVP/ROM RDM PMG AVP
Redevelopment Initial FAST-R 1 Attached (Budget 2 for Redevelopment FAST-R 2 Attached
IMPROVEMENT
Checkers, Concept
SCMC: EDD - Design EDD - Design EDD - PMG: with Business EDD - Design EDD - PMG: SCMC:3 level; Basis is
is Budget OnlEDD - Design
y i f: -1% IRR or +1yr PB EDD - PMG:
Conforme, (ProjectSTT
Summary) N/A Checkers: Checkers: CMG AVP N/A
Plan Checkers: CMG AVP STT FCD) Checkers:
or +10 % i n Area s / Cos t CMG AVP
Endorsers
Initiator SCMC Ops OIC/AVP OIC/AVP OIC/AVP NAI OIC/AVP NAI
REDEVELOPMENT
AVP/ROM same as NEW CON same as NEW CON same as NEW CON same as NEW CON same as NEW CON same as NEW CON same as NEW CON same as NEW CON same as NEW CON N/A
Conforme/Endorser: Conforme/Endorser:
FGH FGH
Approvers
Checkers, HTS1
SCMC: HTS1 EDD - Design: EDD-PMG P0-5M - STT HTS1 HTS1 P0-5M - STT EDD - Design: HTS1
Conforme, STT N/A
same as NEW CON same as NEW CON
FGH
same as NEW CON
NAI
same as NEW CON
P5-10M - JCO
same as NEW CON same as NEW CON same as NEW CON
P5-10M - JCO
same as NEW CON
FGH
same as NEW CON N/A
P10M above - JCL P10M above - JCL
Endorsers
(Refer to DCN attachment
requirement as per
Approvers HTS1 EDD-PMG HTS1
New Construction)
same as NEW CON same as NEW CON same as NEW CON NAI same as NEW CON same as NEW CON same as NEW CON same as NEW CON N/A
SMPHI
**Should Budget 3 exceed Budget 2, FAST 3/FAST-R3/FAST-I3 shall be generated and for approval. Approval shall follow as per "Memo to Proceed (Project Feasibility)"