Professional Documents
Culture Documents
Automatic Railway Gate and Track Controller: Submitted by
Automatic Railway Gate and Track Controller: Submitted by
Automatic Railway Gate and Track Controller: Submitted by
CONTROLLER
SUBMITTED BY
Mr. M. HARIHARAN
GUIDED BY
Mr. S. SURENDER, M.E,(AP)
2016-20/2019-20/16EC7A/R(1) /16.08.2019/Page 1 of 9
DOMAIN
• Embedded domain
2016-20/2019-20/16EC7A/R(1) /16.08.2019/Page 2 of 9
OBJECTIVES
• The aim of this project work is to reduce human efforts in railway gates.
• Railway gate controller reduces the maximum human error.
2016-20/2019-20/16EC7A/R(1) /16.08.2019/Page 3 of 9
S NO TITLE AUTHOR DESCRIPTION
2016-20/2019-20/16EC7A/R(1) /16.08.2019/Page 4 of 9
ABSTRACT
2016-20/2019-20/16EC7A/R(1) /16.08.2019/Page 5 of 9
EXISTING SYSTEM
LIMITATION
• But the Railway track is controlling by the manual system only.
2016-20/2019-20/16EC7A/R(1) /16.08.2019/Page 1 of 12
PROPOSED SYSTEM
• The track change for corresponding Train will be carried automatically by the
controller.
2016-20/2019-20/16EC7A/R(1) /16.08.2019/Page 1 of 12
ADVANTAGES
• Unmanned Railway gate control
• More Reliable on-time response
• Prevention of accident inside the gate
• Automatic operation prevents errors due to manual
2016-20/2019-20/16EC7A/R(1) /16.08.2019/Page 6 of 9
APPLICATIONS
2016-20/2019-20/16EC7A/R(1) /16.08.2019/Page 7 of 9
REFERENCE
2016-20/2019-20/16EC7A/R(1) /16.08.2019/Page 9 of 9