The document outlines a question paper template for a marine engineering course divided into 9 units covering topics like smoke tube boilers, water tube boilers, steam engines, steam turbines, condensers, and boiler operations and maintenance. Each unit lists the topics covered, hours of instruction, and the number and type of questions to be asked from that unit - typically 1 long question and 1-2 short questions. The template provides a framework for instructors to develop questions that assess students' understanding of the key concepts from each unit of the course curriculum.
The document outlines a question paper template for a marine engineering course divided into 9 units covering topics like smoke tube boilers, water tube boilers, steam engines, steam turbines, condensers, and boiler operations and maintenance. Each unit lists the topics covered, hours of instruction, and the number and type of questions to be asked from that unit - typically 1 long question and 1-2 short questions. The template provides a framework for instructors to develop questions that assess students' understanding of the key concepts from each unit of the course curriculum.
The document outlines a question paper template for a marine engineering course divided into 9 units covering topics like smoke tube boilers, water tube boilers, steam engines, steam turbines, condensers, and boiler operations and maintenance. Each unit lists the topics covered, hours of instruction, and the number and type of questions to be asked from that unit - typically 1 long question and 1-2 short questions. The template provides a framework for instructors to develop questions that assess students' understanding of the key concepts from each unit of the course curriculum.
Tolani Maritime Institute Introduction • The total syllabus has been divided into 10 units. • Related and similar topics put in a single unit. • Units has been devised to accommodate 7 long questions and 10 short questions as per the contact hours spent in teaching UNIT 1 Smoke tube General consideration governing the 1 One boiler design of boilers, long 5 hours of Types of marine Boilers question contact Smoke tube boilers - Various types in + marine use Two Multitubular cylindrical boilers short Vertical auxiliary boilers – Cochran, question spheroid, s3 Waste heat Waste heat recovery calculation marks boiler Scotch composite boiler (For 9 4 hours of Cochran boiler hours of contact Spanner boiler contact) Forced water circulation boiler Double evaporation boiler UNIT 2 Water tube General description of boilers- only D- 1 One boiler type of boiler long 5 hours of Difference between WTB and STB question contact Circulation and downcomers + Superheater and superheater Two temperature control short Attemperartor and desuperheater question Economizer, air preheater, steam s3 preheater; marks Oil burning pressure-jet, steam-jet and rotary-cup (For 9 process burners, hours of 2 hours of liquid fuel burning in open furnaces , contact) contact Air Registers combustion control system – master control, fuel, air, viscosity controls; UNIT 3 Boiler Safety valves – improved high lift 1 One long mountings & others such as full lift & full question 7 hours of bore to be compared + contact Gauge glass One short Auto feed regulator questions 3 Level alarms marks Main steam stop valve (For 10 Retractable type soot blower hours of Operation care Pre-commissioning procedure & contact) and raising steam – operating No maintenance procedure, Blowing down g/g, low questions 3 hours of water level, Action taken in the to be asked contact event of shortage of water, laying from up of boiler, blow down boiler, Laying up Tube renewal, General of boiler, UNIT 4
Test on Destructive test One
boiler NDT short 2 hours of Hydraulic test question contact Class rules s3 marks (For 2 hours of contact) UNIT 5 Steam Multiple expansion of One engines steam reciprocating long 5 hours of engines questio contact And steam turbines n Layout of General layout (For 9 a plant hours of 4 hours of contact) contact UNIT 6 Constructional Blades 1 One long details Rotors question 8 hours of Casing + contact Diaphragm One short Nozzle, questions Gland and types 3 marks Main and thrust bearing (For 10 Selection of Materials used for these hours of material contact) 2 hours of contact UNIT 7 Constructional Main and thrust bearing 1 One long details question Lubrication of Suitable oil and properties + turbines Gravity and pressure lubrication One short 2 hours of questions contact 3 marks Alignment Bridge gauge and poker gauge (For 9 checking Allowance for Sliding foot, Thrust hours of 3 hours of bearing contact) contact dynamic balancing Reduction gears Ratio, Types of gear teeth, Gear 4 hours of defects, Flexible coupling, Quill contact shaft UNIT 8 Condense Shapes and types No rs Constructional detail questio 4 hours of Working principle n from contact Contraction and this expansion allowance topic Calculation of water (For 4 quantity hours Condenser surface of contact ) UNIT 9 Operation Drain system, 1 One and Gland system (with gland and long maintenance its types) question 10 hours of Worming up + contact Throttle valve and nozzle 2 short control, questions Emergency operation 3 marks Vibration (For 10 Steam turbine losses hours of Breakdown and fault finding contact) Thank you