Download as pptx, pdf, or txt
Download as pptx, pdf, or txt
You are on page 1of 12

QUESTION PAPER TEMPLATE

Sunil Kumar Panda


Tolani Maritime Institute
Introduction
• The total syllabus has been
divided into 10 units.
• Related and similar topics put in a
single unit.
• Units has been devised to
accommodate 7 long questions
and 10 short questions as per the
contact hours spent in teaching
UNIT 1
Smoke tube General consideration governing the 1 One
boiler design of boilers, long
5 hours of Types of marine Boilers question
contact Smoke tube boilers - Various types in +
marine use Two
Multitubular cylindrical boilers short
Vertical auxiliary boilers – Cochran, question
spheroid, s3
Waste heat Waste heat recovery calculation marks
boiler Scotch composite boiler (For 9
4 hours of Cochran boiler hours of
contact Spanner boiler contact)
Forced water circulation boiler
Double evaporation boiler
UNIT 2
Water tube General description of boilers- only D- 1 One
boiler type of boiler long
5 hours of Difference between WTB and STB question
contact Circulation and downcomers +
Superheater and superheater Two
temperature control short
Attemperartor and desuperheater question
Economizer, air preheater, steam s3
preheater; marks
Oil burning pressure-jet, steam-jet and rotary-cup (For 9
process burners, hours of
2 hours of liquid fuel burning in open furnaces , contact)
contact Air Registers
combustion control system – master
control, fuel, air, viscosity controls;
UNIT 3
Boiler Safety valves – improved high lift 1 One long
mountings & others such as full lift & full question
7 hours of bore to be compared +
contact Gauge glass One short
Auto feed regulator questions 3
Level alarms marks
Main steam stop valve (For 10
Retractable type soot blower hours of
Operation care Pre-commissioning procedure & contact)
and raising steam – operating No
maintenance procedure, Blowing down g/g, low questions
3 hours of water level, Action taken in the to be asked
contact event of shortage of water, laying from
up of boiler, blow down boiler, Laying up
Tube renewal, General of boiler,
UNIT 4

Test on Destructive test One


boiler NDT short
2 hours of Hydraulic test question
contact Class rules s3
marks
(For 2
hours of
contact)
UNIT 5
Steam Multiple expansion of One
engines steam reciprocating long
5 hours of engines questio
contact And steam turbines n
Layout of General layout (For 9
a plant hours of
4 hours of contact)
contact
UNIT 6
Constructional Blades 1 One long
details Rotors question
8 hours of Casing +
contact Diaphragm One short
Nozzle, questions
Gland and types 3 marks
Main and thrust bearing (For 10
Selection of Materials used for these hours of
material contact)
2 hours of
contact
UNIT 7
Constructional Main and thrust bearing 1 One long
details question
Lubrication of Suitable oil and properties +
turbines Gravity and pressure lubrication One short
2 hours of questions
contact 3 marks
Alignment Bridge gauge and poker gauge (For 9
checking Allowance for Sliding foot, Thrust hours of
3 hours of bearing contact)
contact dynamic balancing
Reduction
gears Ratio, Types of gear teeth, Gear
4 hours of defects, Flexible coupling, Quill
contact shaft
UNIT 8
Condense Shapes and types No
rs Constructional detail questio
4 hours of Working principle n from
contact Contraction and this
expansion allowance topic
Calculation of water (For 4
quantity hours
Condenser surface of
contact
)
UNIT 9
Operation Drain system, 1 One
and Gland system (with gland and long
maintenance its types) question
10 hours of Worming up +
contact Throttle valve and nozzle 2 short
control, questions
Emergency operation 3 marks
Vibration (For 10
Steam turbine losses hours of
Breakdown and fault finding contact)
Thank you

You might also like