• Govt must provide 80% • Minimum land and space
subsidy. requirement.
• Technical training must be • Storage system should be
provided for O&M of the provided.
plant.

• 100% subsidy must be • Crop Production.


provided for the plant . • No Electricity Bill.
• Discounted services is
provided for EBC
SN VOC CTQs CTPs

1 Reduction in Operation and O&M cost per 50 hrs. of


Maintenance cost service. professional
training is
provided to the
farmers.
2 Provide subsidy Subsidy/Pump Direct benefit
Capacity transfer to
farmer’s bank
account
3 Able to use pump at night Kwh battery Provisional
energy storage
system
Implementing solar pumps in agriculture
Business Case Opportunity Statement
Even after 100% electrification in India still, 30 % of Pain: Isolated from the grid
the farmers in India are still deprived from electricity
and it makes little economic sense as they are Impact of pain in Rs. (or soft) : Unable to
islanded from the grid so decentralized generation is provide electricity
the way out.
Sigma Level: 3.5
Goal statement Project scope
Metric Current Goal / Target Process under improvement: Providing
level Target date solar powered pumps
%of 0% 5% in 6 21st
farmers months October Starts with: 21st August, 2019
2019
Ends with: 21st October 2019

Out of Scope: Farm output


Project plan Team Selection
Phase Start End Remarks Sponsor: MNRE
Define 22st August 23nd August Champion: State Nodal Agency
Measure 23rd August 1st Sept Project Leader(BB/GB): Chief Engineer
Analyze 1st Sept 5th Sept Mentor: Executive Engineer (Black Belt)
Improve 5th Sept 15th Oct Member: O&M Engineer (Green Belt)
Control 15th Oct 21st Oct Member: Purchase Dept (Green Belt)
SUPPLIER INPUT PROCESS OUTPUT CUSTOMER

• Lubi • Crop land • Farm Survey • Solar • Internal :


Electronics area • RFQ for powered Contractor
solar system pumps • External :
• Exide • Pump • Tender available Farmer
Batteries Rating Process. to farmers
• L1
• EPC • Water Identificatio
contractor table n
depth • Award of
contract
• Distance • EPC
from grid • Site
inspection
VAT LT
1. Farm Survey 1 24

2. RFQ for solar system 8 168

3. Tender Process 4 24

0.5 24
4. L1 Identification
PCE= VAT/LT*100
5. Award of contract 2 120 =23.33%

6. EPC 240 720

2 24
7. Site inspection
257.5 1104
SN Crop land Pump Water Distance Farmer’s Legal
area Rating table from grid Income Docume
depth nts