Thermal Power Plant
PANIPAT
• Basic requirements.
• Electricity production cycle.
• Water circulation.
• Transmission.
• Switch yard (Distribution).
Thermal power station
•India’s Coal Reserves are estimated to be 206 billion tones. Present consumption is
about 450 million tones.
•Cost of coal for producing 1 unit of electricity is Rs 0.75.
•Cost of Gas for producing 1 unit of electricity is Rs 1.20.
Coal Handling Plant
Wagon Tippler
Bottom Discharge Wagon
Stacker re-claimer
Coal Crusher
Need of Draft System
CHIMNEY
• Height 143.5