Maintenance
Scope :
The Scope consists of carrying out the regular Preventive Maintenance of all Optical Transmission network elements& site inspection, in
order to eliminate or minimize the possibility of failure/outages of this Network Element in day to day operations.
The list of such equipment would be Transmission muxes, DWDM equipment, Routers etc..
# Type Circle KPI’s Unit MIN Target Max Weight KPI TQI
1 FO RTN Logistics 98 99 100 4 100.000 4.000
2 FO RTN Logistics 98 99 100 0 99.000 0.000
3 FO RTN Material delivery at site 98 99 100 0 100.000 0.000
4 FO RTN Preventive Maintenance % 99.8 99.9 100 7.5 100.000 7.500
Circle will achieve 7.5 points only if the GPM is completed 100% against scope
If the completion is even 99% also the Weightage would be dropped to -7.5 Points
All the above points are related to site database and falls under ‘Common Site details checklist’ tab
Other Check Points in which Punch points are to be checked & captured :: 36 Points
These Checkpoints are divided into 2 categories based on Punch point Type
External Checkpoints: 9 Nos.
• Checkpoints related to site infra conditions
• Checkpoints to taken up with Infra team for clearance
• Checkpoints can be closed remotely via CIAT Browser Login post Rectification/Validation
Equipment should be
powered with adequate Mail to sent to Vodafone team for taking up
5.6 Are Tx equipment connected with adequate MCB as If MCB is under rated then capture the PP by
21 MCB Internal MCB rating -- Check for with IP vendor for addition of MCB/ Correction
per recommended specification selecting option as "No"
vendor specific specs for of redundancy issue
MCB ratings
Labelling should be
5.13 Is the Electrical cabling from Equipment to DDF & Repeated site visit not suggested for
28 Routing Internal avaiable for identification Labelling to be done during site visit itself
kroning done properly & labeled corrections
purpose;
Filter
29 5.14 Is the cleaning of equipment Filters done properly Internal
Clearance
Check points are part of
Avoid capturing these as Punchpoints; these
5.15 Are all Fans of equipments working properly (No Filter activities which needs be Repeated site visit not suggested for
30 Internal activities to be mandatorily carried out by
abnormal noise and vibrations) Clearance mandatorily carried out corrections
engineer during site visit for PRM
during PRM
5.16 Only during SA PE for PM: Are cards / MDA in Filter
31 Internal
routers, Mux cleaned for Dust accumulation Clearance
Please capture only relevant Punch points ; If more number of points are captured all punch points
would require site visit to close
For Infra Related Punch points raised TT to Indus team/Sent mail to respective Infra Vendor for
clearance
External Punch points captured can be closed remotely via Browser once the same is cleared by
respective Stakeholders.
Remove Switched off Nodes from the CIAT portal, to achieve maximum KPI
Ensure all the Nodes in TXMS scope are loaded in the CIAT tool for achieving maximum KPI
Inside CIAT Tool, GPM Option ---- Tx Node --- Punch point
Follow the above steps also for closing the Internal Punchpoints via tool;
For closing an Internal PP, snap is Mandatory
Click on to each site, the external punch point open under the site will appear. Select the same and close
with comments