SAP PP MODULE
Presented By :
D.Avinash
Honda-Goa, 06th May 2009 2
Process Flow Integration
Material Requirements
Production Material Procurement Materials
Planning Management
Production Cost Accounting Document
Purchase Order
Invoice Receipt
Goods Receipt
Finance & Vendor
Receivable Accounts / Cash Receipt Controlling Accounts Payable
Demand Management
Production Order
Confirmation &
Settlement
5
6
7
Organizational Structure
Profit Center
1
PLANT
1
Storage Location
11
Master Data
1
Material Master
Views of the Material Master
Purchasing
Costing Each user function has its own view of the material master which
permits easy access and maintenance of data.
Shop Floor
Engineering
Production
Which departments use this view?
?
Engineering
Shop Floor Production
Materials Materials Management
Management
Materials
Management
Shelf life data
Stock Determination
Profit Center
BOM
Machine
Assembly 1 Assembly 2
Sales Data
• BOM header maintained with structure of assembly components & sub assembly items with respective
Valid-from date
1993
Change Numbers
ECN numbers are required for BOM creation &
changes.
ECN’s will be inactive when Designer is working
on that BOM.
ECN’s will be active when they are released to
SAP AG
production.
Valid-to date
1993
Usage Work centers are used in routings. They can also be used
as capacity collectors for statistical evaluations.
Examples
Type of work center Example
Individual work center Automatic lathe 17
Material
Routing group
Operation 20
Operation 10
Work center Material components
Texts
Control data Production Resources
Times and Tools
Routing Group
Routings contain:
Material allocation
The manufacturing material is allocated to the group counter.
Component are allocated to operations and standard values for
• Setup time,
• Processing time
• Tear-down time
1
SOP Process Flow
1
To Create a sales plan
We can enter manually
We can enter from forecast
By transferring data from COPA and also SIS
By transferring data from another product group
1
To Create a Production Plan
1.Synchronous to sales
2.Target Stock level
3.Target Stock days
1
Disaggregation
Creating a sales plan or a production plan at one level
of the product structure hierarchy does not creat lower
level plans. So we must disaggregation
Many options exists when disaggregation
1
Demand Management
MRP/MPS
Demand Management
Customer or sales requirements ( Export or Domestic).
Planned independent requirements.
Planning strategies
Methods of production for planning & manufacturing or procuring a
product.
Different planning strategies used are;
Make to stock
Make to order
Planning with final assembly
Planning for project
MRP
Sales orders
Planned ind reqmts
Dep. reqmts
Convert
Purchase Schedule
Production requisitions lines
order
Purchase
order
Stores
Warehouse Stock
Stores Stock
SAP AG 1999
44
MRP- Stock Requirement List
45
Production Control
Discrete manufacturing:
Frequently changing products
MFG restricted production lots
Varying sequence of work centers over which a product can run
Repetitive Manufacturing:
Same product is produced over a longer period of time in one
production line
Total quantity of the product is manufactured over a specific period of
time with a specific production rate per partial period
Batch Management:
Batch Specification
You use this function to describe each batch uniquely using
characteristics and characteristic values. You specify the permitted
value range in the allocated material master record.
7 - Print Shop
Confirmation Slip
1 - Select 2 - Select 3 – Schedule Dates Floor Papers
BOM Routing (Fwd / Backward)
Release
Order 6 - Calculate
Planned Costs
Actual
Create Labor Confirm
Order 4 - Check Completion
Availability 8 - Issue
Cost Release Materials to
5 - Calculate Order 10 - Calculate
Capacity Actual Costs
9 - Receive complete
Goods
Issue goods into stock
Goods
Receipt
A Production Order collects all costs associated with making an inventorial item and
the order “picks up” the cost from Material master.
Production cost analysis carried out after Final Confirmation & Order Settlement.
Quantities:
Total Produced: 100 Tons
Scrap: .001
Routing Confirmed: 100 Tons
Dates:
Schedule 09/15/95
Confirmed 09/16/95