Construction Department Introduction

Presented by
Ahmed Hussein
Project Planner
Contents:-
• Personnel at Site.
• HSE Statistics.
• Ongoing Projects &Photos.
• Look ahead Plan.
Personnel at Site
AMAPETCO TANMIA EPESCO
(6) (18) (6)

Eng. Haitham Ismail MR. Tarek Hussein


Eng.Mahmoud
Khaled Azmy
Elqosie MR. Abo Baker
Construction Manager Administration
QA&QC Dep
Instrumentation Dep Material Tech
Eng. Ali Roshdy MR.
Eng. Ibrahim
Eng. Ahmed
Ahmed Khamis
Elnmr
Abdelsalam MR. Ali Mahdy
Head of Mechanical Dep DCC
Civil Dep
QA&QC Material Tech
Eng. Ahmed Abdelghany MR.
MR.Mohamed
Eng. MohamedMaher
Ismail
Ahmed Huseein Mr. Ahmed Almadawy
Head of Electrical Dep Planning DCC
Electrical
& CostDep
Control Driver
Eng. Wasem Elashry MR.
MR. Mahmoud
Eng. Hassan
Ahmed khalil
Ali
Basuony MR. Said Fouda
Head of Civil Dep Planning &DCC
Mechanical
CostDep
Control Driver
MR. Ahmed Abdelgalil MR. Ahmed
MR.Ahmed
MR. Mahmoud
Karim Abdelrashid
Mohamed MR. Mostafa Said
Head of Material Dep Material
Mechanical
Planning Tech
& Cost Dep
Control Driver
MR. Ahmed Abdelgalil MR.
Eng.
MR. Ali Ayman
Ahmed Saadawy
Mohamed Alaa MR. Mohamed Samy
Head of Material Dep Material
QA&QC TechDep
Administration Driver
HSE Statistics:-
• Total Safe Hour 183681/H.
• Permit to Work 371 (PTW).
• Tool Box Talk 284 (TBT).
• Safety Induction 20.
• Observation and conversation 19.
• Safety Meetings 17.
Ongoing Projects
Construction Works at Camp
Contractor: ALBONYAN Contract No: 440/2017

Scope of Works:-
1. Kitchen Extension
2. Clinic Extension
3. Filter Press & Compressor Room
4. Skeleton & finishing Works of the Two Villas 2nd Stories

Project Status:-
Item Description Status Notes
• Filter Press & Compressor Room 100% Handed over to Operation
• Clinic Extension 100% Handed over to Operation
• Skeleton & finishing Works of the Two Villas 2nd Stories 99% Apartments Handed over to operation
• Kitchen Extension 80% Ongoing
Progress Photos:-
CLINICRoom
Filter Press & Compressor
KITCHEN EXTENSION
EXTENSION
AMAL-C Cantilever Deck
Contractor: PTJ Service agreement: 299/2013
Scope of Works:-
• Fabrication of deck cantilever activities (procure , cutting, assembly , welding , NDT , painting , load out ,
offshore installation )

Project Status:-
Item Description Status Notes
• Procure 100%
• Cutting 100%
• Assembly 100%
• Welding 100%
• NDT 100%
• painting 100%
• load out 100%
• offshore installation 0% Standby for weather window and maintenance AMAL-C crane to offloading
all material from ocean drum to AMAL-C Platform.
Progress Photos:-
New 12” Effluent Line
Contractor: Egypt Gas
Scope of Works:-
• Replacement non-metallic 10” pipeline with new one 12” HDPE of length 500m offshore and 500 onshore in
order to ensure an efficient drainage process complying with environment rules .
Project Status:-
Item Description Status Notes
• Onshore Scope 98%
• Replace 10” UPVC with new 12” HDPE inside GOSP ( 100%
excavation, laying, welding, inspection, Tie-ins& backfilling)
• Mixing tank 80%
• Fabrication 100%
• Foundation 0% Suspended due to military permits required
• Installation 0%
• Offshore Scope 85%
• Welding 100%
• Hydro test 100%
• Installation concrete support 100%

• Fabrication Diffuser 100%


• Pipe Laying 0% Standby for weather window
• Tie-in 0%
Progress Photos:-

KITCHEN EXTENSION
Mixing Tank
GOSP Pressure Vessels Foundation Repair
Contractor: PTJ Service agreement: 299/2013
Scope of Works:-
• Replace concrete foundation of the vessels
• Dismantle activities of piping ,instrumentation trays/tubing and cables
• lifting for the vessels to safe location
• civil works(demolish works ,excavation ,backfilling ,plain concrete, Reinforced concrete ,water
proof works buried R.C and epoxy.
• Re-install the vessels, piping ,instrumentation trays/tubing and cables
Project Status:-
• Site visit was conduct from PTJ
• Standby for held a meeting at Cairo office with projects department engineering team and PTJ to
finalize related issues regarding the awarded scope of work.
Progress Photos
Look ahead Plan
1. AMAL-B Service Deck Project
2. AMAL – A platform Rehabilitation Project, Remediation and Repair of
Offshore Structures
3. Inspection for offshore Pipelines
Thank you
Ahmed Hussein

You might also like