Prepared by: Engr. Page Weil, US Peace Corps Engr. Manni Raquid, AUL Design Package ► Calculations Water Requirements Headloss for Individual Pipes Ferrocement Tank (FCT) Design and Sizing ► CAD Drawings ► Bill of Materials “Route Numbers” ► Route #1 – Main Transmission Line ► Route #2 – Supply line to Quitinday, Jovellar ONLY ► Route #3 – Main Distribution Line in Poblacion (to all Pob. Barangays) ► Route #4 – Distribution Line for Upper Rizal ONLY Calcs (1 of 3) ► Water Requirements – Route 1 ► Water Requirements – Route 4 ► Excel File of All Calcs Calcs (2 of 3) ► Headloss for Route 1 ► Headloss for Route 2 ► Headloss for Route 3a (3b is a shorter line to reduce costs) ► Headloss for Route 4 Calcs (3 of 3) ► Ferrocement Tank Sizing and BOM CAD Drawings (1 of 3) ► P1.0a – Jovellar Map ► P1.0b – Piping System Map ► P1.1 – Piping System Map ► P1.2 – Piping System Map ► P1.3 – Piping System Map ► P1.4 – Piping System Map CAD Drawings (2 of 3) ► P2.0 – Reservoir Site Plan ► P2.1 – Reservoir Closeup A ► P2.2 – Reservoir Closeup B ► P2.3 – 9000L FCT Detail ► P2.4 – 25000L FCT Detail CAD Drawings (3 of 3) ► P3.1a – Intake Tank Elevation ► P3.1b – Intake Tank Plan View ► P6.0 – Output Works (Tapstands and Drain) Bill of Materials (1 of 1) ► Overall Bill of Materials and Cost Breakdown