Work in Process

You might also like

Download as pptx, pdf, or txt
Download as pptx, pdf, or txt
You are on page 1of 6

RFC STORE

TYPES OF RFC STOCK

RFM NRFM

 The Responsibility of WIP Team is to evaluate


RFC stock for (RFM & NRFM)
 Decrease the ageing of NRFM
Process of Cutting WIP Responsibilities
• The cutting manager receive cutting plan • WIP operator is responsible of feeding
from PPC layer making in system
• Demand fabric from RFC Store • Feeding of cut bundles in the system as per
• Make job card according to PPC plan job card (Ensure job card is signed by
• Make layer/marking of fabric for cutting cutting manager)
• Cut fabric according to marking • Generate & paste barcode for each cut
• Make bundle of cut pieces bundle
• Provide accessories for each work order • Generate master poly bag barcode number
in the system
• Entry in the system if a fabric is returned
to RFC store
• To make outward of cutting for induction
store
• To ensure timely movement of cutting
stock to induction store
Location Strength Operations Production Time study
K-1
Responsibilities
ResponsibilitiesofofWIP
WIPTeam:
Team:
 To
Toreceive
receiveinduction
inductionfrom
fromcutting
cuttingand
and
record
recordininthe
thesystem.
system.
 To
Toissue
issueinduction
inductiontotosewing
sewingunits
unitsasasper
per
PPC
PPCplan
planand
andrecord
recordininthe
thesystem
system
SEWING
Process WIP Responsibilities
Machines set up according to PPC
Plan

You might also like