EXAMPLE OF BUILDINGS

CONSTRUCTED USING IBS


AND EXPLANATION ON THE
SYSTEM USED
Project
Detail
◦ Project site : 2.1
hectars
◦ Possession of site : 1
Feb 2001
◦ Completion : 31 July
2001
◦ Construction Period :
5 ½ months
System Used
◦ Beams, floor slabs (half slabs with
concrete topping) and staircases
were prefabricated in the factory,
and wall panel are hollow blocks.
◦ Column and toilets were cast in-situ
Project constructed
Project constructed
Finished project
SK Brickfields
1, Kuala
Lumpur
◦ Start Project : 6 Feb
2003
◦ Completion : 17 Sept
2003
◦ Construction period :
7 ½ months
Installation of first floor
System used
slabs
◦ 75% of the building
component were
prefabricated
◦ Prefab used : columns,
beams, hollow core floor
slabs, staircase and wall
panel (Acotech panels)

Installation of precast
column
Installation of 3rd floor slab Fixing of wall panel
Installation of precast staircase Completion of external wall
GOVERNMENT
PROJECTS
Project Akademi Audit
Negara, Nilai, Negeri
Sembilan
◦ Quarters F & G : load bearing
design, precast wall, slab, column
and beam
PROJECT
BALAI POLIS
SENAWANG,
NEGERI
SEMBILAN
System used : cast-in-situ column
and beam, precast infill wall and
slab