Loss amount:
‒ INR 28 Cr
Critical Issues:
‒ Gross Negligence , Design Defect, Reinstatement Details
Incident:
‒ A turbine was under planned shutdown in view of malfunctions of certain valves. Upon repair, it was
restarted and turbine could reach almost rated capacity and ran for a day. As per physical and control
room observations, one of the valves was in an abnormal opening position. To have better control, load
of DG was reduced. Still the valve could not be fully closed as it must have struck. Suddenly there was
a fire and smoke engulfed the TG room
‒ The control room activated emergency stop valves so as to stop turbine and delink generator
Incident (cont):
‒ Simultaneously, operating staff gave closing command to a steam isolation valve (electrically operated)
in front of turbine; which amounted to a manual stop of turbine. Another Turbine running by the side also
was stopped by step-down method