INDUSTRIAL TRAINING PPT Bhel Bhopal
INDUSTRIAL TRAINING PPT Bhel Bhopal
PRESENTED BY :- PRESENTED TO :-
PRAVEEN KUMAR SINGH DR. NAVNEET KUMAR
ROLL NO. (1673520034) ASSISTANT PROFESSOR
EE FINAL YEAR EE DEPARTMENT
REC BIJNOR REC BIJONR
GENERATING TRANSFORMER-
• The generator transformer is the largest transformer on a power station and connects the generator
output to the grid.
• The generator transformers, in most present day stations will have a voltage ratio of 23.5/400 kV.
• The important criteria which influence the generator transformer design are as follows:
Insulating
component
Tank fabrication
and manufacturing
DESIGN AND DRAWING-
1-phase
Phase
3-phase
KVA
Rating
MVA
50 Hz
Frequency
60 Hz
Generating
Purpose
Substation
Distribution
TRANSFORMER CORE BUILDING:-
Disc winding
Halical winding
TYPES OF WINDING CONDUCTORS:-
The various types of conductors used in coil winding are-
CTC (Continuously Transposed Conductor)
PICC (Paper Insulated Copper Conductor)
BPICC (Bunch Paper Insulated Copper Conductor)
COIL ASSEMBLY:-
The coils are specified in the design may be of following types on the basis of operating
voltage:-
L.V. Coil Winding
H.V. Coil Winding
Tap Coil Winding
L.V. Coil is placed adjacent to the CRGO steel core and H.V coil outside, in order to
minimize the amount of insulation required.
While assembling the different coils (i.e. Tap coil, L.V. Coil & H.V. Coil) tap coil can be
placed in either of three positions depending upon the length of tap coil i.e. if tap coil is
small it is placed inside of LV coil, if it is medium then between LV & HV coil, and if large
then outside of HV coil.
Horizontal
Winding
(LV & Tap)
Vertical
Windin
g (HV)
Coil Assembly
Relacing of core
Relacing of core
Terminal Gear Mounting
Crimping & Brazzing
Insulation Wrapping
OLTC Connection
Vapour Phase Drying
Servicing(due to porous in Terminal Gear Mounting
insulation)
After successful completion of testing, transformer is handed over to dispatch sections. At this
stage after checking oil leakage, dismantling of all bushings, turrets etc. and covered with the
blanking plates and the tank is fitted with nitrogen gas and then the transformer is dispatched
to the concerned site.
THANK YOU