Professional Documents
Culture Documents
Westinghouse Generator Startup Instructions
Westinghouse Generator Startup Instructions
Westinghouse Generator Startup Instructions
1 Remove Cover
2 Position Kims Ramp over the backdoor threshold
3 Pull up handlebar and roll the generator over the ramp to the outside
4 Rotate Fuel Valve to "ON" position
5 Move the Choke Lever backwards (choke lever has a black "X" marked on it)
Rotate the big RED button labeled "Battery Disconnect" in the direction of arrows (the battery
6 indicator light must come on)
7 Push the "Start/Stop Button" and step back as the generator autmatically starts
Step 4
Fuel Valve
Back
(wheels on left)
Step 5
Choke
Lever
“X”
Front
(wheels on right)
Step 6
Battery
Disconnect
Step 7
Start
Stop