Systems Design, Implementation, and Operation

You might also like

Download as pptx, pdf, or txt
Download as pptx, pdf, or txt
You are on page 1of 10

Systems Design,

Implementation, and Operation


Chapter 22

Copyright © 2015 Pearson Education, Inc. 22-1


Learning Objectives
• Discuss the conceptual systems design process and
the activities in this phase.

• Discuss the physical systems design process and the


activities in this phase.

• Discuss the systems implementation and conversion


process and the activities in this phase.

• Discuss the systems operation and maintenance


process and the activities in this phase.
Copyright © 2015 Pearson Education, Inc.
22-2
Phase 2: Conceptual Systems Design

Copyright © 2015 Pearson Education, Inc.


22-3
Phase 3: Physical Systems Design

• Output design (e.g., reports)


• File and database design
• Input design (e.g., forms, computer screen
input)
• Program design
• Procedures design
• Control design

Copyright © 2015 Pearson Education, Inc.


22-4
Program Design
• Determine user needs
• Create and document development plan
• Write the computer code
• Test the program
• Document the program
• Train users
• Install the system (including components and
hardware)
• Use and modify the system
Copyright © 2015 Pearson Education, Inc.
22-5
Phase 4: Systems Implementation

• Implementation plan
• Select and train personnel
• Complete documentation
▫ Development documentation
▫ Operations documentation
▫ User documentation
• Testing the system
• Conversion

Copyright © 2015 Pearson Education, Inc.


22-6
Testing the System

• Walk-throughs
▫ Step by step review
• Processing test data
▫ Test all valid transactions and error conditions
• Acceptance tests
▫ Use copies of real data

Copyright © 2015 Pearson Education, Inc.


22-7
Conversion Approaches
• Direct conversion
▫ Terminates the old and begins with the new system
• Parallel conversion
▫ Operate old and new systems for a period of time
• Phase-in conversion
▫ Gradual replacement of old elements with new system
elements
• Pilot conversion
▫ Implement a system in a part of an organization (e.g.,
a branch)
Copyright © 2015 Pearson Education, Inc.
22-8
Phase 5: Operations and Maintenance

• Conduct post-implementation review

Copyright © 2015 Pearson Education, Inc.


22-9
Key Terms
• Conceptual design • Systems implementation
specifications • Implementation plan
• Conceptual systems design • Walk-through
report • Processing test data
• Scheduled report • Acceptance test
• Special-purpose analysis • Conversion
report • Direct conversion
• Triggered exception report • Parallel conversion
• Demand report • Phase-in conversion
• Structured programming • Pilot conversion
• Debugging • Post-implementation review
• Program maintenance • Post-implementation review
• Physical systems design report report
Copyright © 2015 Pearson Education, Inc. 22-10