Download as pptx, pdf, or txt
Download as pptx, pdf, or txt
You are on page 1of 42

North Zone

1
North Zone

IMPLEMENTATION STATUS

TEVTA INSTITUTE OPERATING MANUAL


(IOM)

2
SEQUENCE
North Zone

1. Introduction
2. Management Section
3. Academics Section
4. Co-Curricular Activities
5. Finance Section
6. Salient Features/Data of the College

3
North Zone

1. Introduction
2. Management Section
3. Academics Section
4. Co-Curricular Activities
5. Finance Section
6. Salient Features/Data of the College

4
INTRODUCTION
North Zone

Name of the Institute: GCT MIANWALI


Year of Establishment: 2009
Name of the Principal: Aamir Shabbir Khan
Address of the institute: 7-KM Kalabagh Road, Near Berowli
Railway Station Mianwali
Nearby land mark: Berowli Railway Station
Status of Building : Rented / Owned: Own
Total area (In square feet): 200 canal 7 Marlas or 1089905 sft
Covered area (in square feet): 53012 Sft
No. of TEVTA employees: 53
No. of Technologies: 03
Name of Technologies: DAE Mechanical, DAE Electrical, DAE Civil
5
INTRODUCTION
North Zone

Principal Profile
• Name: Engr. Aamir Shabbir Khan
• Designation: Principal (since 22-06-2015)
• Qualification: M.Sc Environmental Design, B.Sc Civil Engg.(UET Lahore)
• Date of Birth: 08-04-1980
• Date of Joining: 22-12-2010 .
• Over all Experience: 16 Years

6
INTRODUCTION
North Zone

List of Main Local Industry/Job market.


• Agri-Tech Private Industry (EX- Pak American Fertilizer Ltd.) Daud Khel
Mianwali
• Maple leaf Cement Factory Daud Khel Mianwali
• Atomic Energy Commission (PAEC Chashma)
• Al-Moeez Sugar Mills Ltd Mianwali.

7
North Zone

1. Introduction

2. Management Section
3. Academics Section
4. Co-Curricular Activities
5. Finance Section
6. Salient Features/Data of the College

8
MANAGEMENT SECTION
North Zone

Implementation status (✔)


IOM Parameter Remarks
Good Satisfactory Poor
All the Institutional Data mentioned
on page-2 of Management Section of
IOM (M-1) is Maintained and up to
M-1 Institutional Data ✔
date. Further all the relevant data of
TEVTA Web Portal is also uploaded
and up to date.
M-2 Punctuality of Staff ✔ Measures for Punctuality ensured
M-3 Morning Assembly and Prayer ✔ In practice on regular basis
M-4 Staff Attendance and Movement Control ✔ System in place
M-5 Students attendance record ✔ Maintianed on daily basis
Maintained and Displayed on College
M-6 Course Time Table ✔
notice boards
Displayed in Labs/Class
M-7 Curriculum Display ✔ Rooms/Readily Available with
Teachers and also with CRs
9
MANAGEMENT SECTION
North Zone

Implementation status (✔)


IOM Parameter Remarks
Good Satisfactory Poor
Maintianed on daily basis with the
M-8 Area Upkeep And Maintenance ✔
help of support staff
M-9 Students Uniform ✔ TEVTA Pattern followed
CCTV, Zig Zag entry, Entry Registers,
M-10 Institution — Security Arrangements ✔
Armed Security Guards in Uniform
M-11 Leave Procedure Students ✔ TEVTA Policy followed
M-12 Leave Policy — Staff ✔ TEVTA Policy followed
Hostel Warden and Hostel and Mess
Committees engaged, In/out and Fee
M-13 Hostel Management ✔
register maintianed, all necessary
measures taken
Cleanliness and Hygine issues are look
M-14 Establishment of Canteen/Cafeteria ✔
after on daily basis
M-15 Drinking Water Facility ✔ Clean drinking water available
10
MANAGEMENT SECTION
North Zone

Implementation status (✔)


IOM Parameter Remarks
Good Satisfactory Poor
Estate Officer declared and all related
M-16 Estate Management ✔
matters administered
Teacher and Students Groups
constituted for upkeep/Care of
M-17 House — Keeping By Students & Teachers ✔
Lawns/Plants , Library and
Labs/Workshops on periodic cycle
In House Sessions arranged for
grooming and enhancing skills of the
M-18 Staff Training ✔ Teachers, Further all the Gaps have
been identified and reported to the
higher authorities for staff training
Steps mentioned on page -23 of IOM
M-19 Image Building Actions & Activities ✔ (M-19) have been taken and activities
are done on regular basis
✔ BoM is engaged as per instructions
M-20 BOM — Institute Monitoring Guidelines 11
received time to time
MANAGEMENT SECTION
North Zone
Implementation status (✔)
IOM Parameter Remarks
Good Satisfactory Poor
On Job Training of Students - Interaction BoM is engaged as per instructions
M-21 ✔
With BOM received time to time
Steps mentioned on page -26 of IOM
M-22 Management of Utilize Capacity (M-22) have been taken and activities
✔ are done on regular basis
IPOs are in place and record is up to
M-23 Placement Support ✔
date
teacher/Student /parent feedback
M-24 Feed Back ✔
system in place
Steps mentioned in IOM (M-19) have
M-25 Workshop/Lab Management ✔ been taken and activities are done on
regular basis
Available through class teachers/OSA in
M-26 Support to Students ✔
all academic matters

12
MANAGEMENT SECTION
North Zone
Implementation status (✔)
IOM Parameter Remarks
Good Satisfactory Poor
M-27 Institution Industrial Linkage ✔ IPO engaged/System in place
Strengths, Weaknesses, Opportunities
M-28 Institutional SWOT Analysis ✔ and Threats identified and strategy to
cater prepared

%AGE IMPLEMENTATION
Good Satisfactory Poor Total
24 4 0 28
86% 14% 0%

13
North Zone

1. Introduction
2. Management Section

3. Academics Section
4. Co-Curricular Activities
5. Finance Section
6. Salient Features/Data of the College

14
ACADEMICS SECTION
North Zone

Implementation status (✔)


IOM Parameter Remarks
Good Satisfactory Poor
A-1 Institute Operational Manual ✔ IOM implemented in true spirit
Action taken where required by
A-2 Assignment/Class Presentation ✔ Teachers being requirement of the
course/teacher
Tests are taken on monthly basis and
corrective measures for poor students
A-3 Monthly Test Analysis and Action ✔ also taken after results. Further results
are regularly dispatched to the parents
of students. The same is basis of PTM
A-4 Mid Term Test (MIT) ✔ Taken as per Academic Calendar/Policy
A-5 Send Up Test (SUT) ✔ Taken as per Academic Calendar/Policy
Assesment Proformas are developed
A-6 Effective Sessional Assessment for Practical's ✔
and checked on regular basis
Activities conducted on regular basis ,
A-7 Competition, Recognition & Incentives Color Badges/Sashes are awarded to
✔ brilliant students and class CRs. 15
ACADEMICS SECTION
North Zone
Implementation status (✔)
IOM Parameter Remarks
Good Satisfactory Poor
Regular Guidelines provided to teachers and
A-8 Guideline for Teachers Training ✔ regular feedback system in place
Monitored on regular basis through student
A-9 Teachers Performance Monitoring ✔ feedback and other measures mentioned in
IOM
Results of each teacher evaluated and
A-10 Analysis of Final Result ✔ reflected in their ACRs, alogwith
appreciation/displeasure letters
✔ A bank of important questions is prepared
A-11 Pre-Exam Revision Program (Prep) by teachers in consultation with HOD
Tutorial sessions, seminars, exhibitions are
A-12 Students Teacher Interaction ✔ ensured to improve student teacher
interaction
Teachers time after classes is fully utilized by
A-13 Utilization of Teacher Time After Classes ✔ formation of different institute committees.

16
ACADEMICS SECTION
North Zone

Implementation status (✔)


IOM Parameter Remarks
Good Satisfactory Poor
Meetings are conducted on Monthly
A-14 Principal Teacher Meetings ✔
basis and minutes of meeting issued.
Proper utilization of lab equipment is
A-15 Lab Equipment Evaluations System ✔ ensured by adopting daily , monthly, six
monthly and yearly check.
All actions are taken mentioned on IOM
A-16 Library Utilization (Self Study) ✔
Page No.43.
actions are taken mentioned on IOM
A-17 Building Teacher Pride And Self-Esteem ✔
Page No.44.
%AGE IMPLEMENTATION
Good Satisfactory Poor Total
13 4 17
76% 24%

17
North Zone

1. Introduction
2. Management Section
3. Academics Section

4. Co-Curricular Activities
5. Finance Section
6. Salient Features/Data of the College

18
CO-CURRICULAR ACTIVITIES
North Zone

Implementation status (✔)


IOM Parameter Remarks
Good Satisfactory Poor
Tutorial gropes have been formed
C-1 Formation & Functioning of Tutorial Groups ✔
and are functional.
Sports activities are conducted on
C-2 Sports Activities in Institutions ✔ regular basis as per IOM
Requirement.
Debate/ Speech contest are arranged
C-3 Debates/Speech Contents on different occasions of national
✔ importance.
Students are encouraged through
C-4 Annual Prize Award Policy ✔
annual prize distribution.
Industrial Tours are arranged for 3rd
C-5 Study/Industrial Tours For Students
✔ year students.
Actively participate in skill
C-6 TEVTA Skill Competition ✔
competitions with distinction.
19
CO-CURRICULAR ACTIVITIES
North Zone

%AGE IMPLEMENTATION
Good Satisfactory Poor Total
4 2 06
67% 33%

20
North Zone

1. Introduction
2. Management Section
3. Academics Section
4. Co-Curricular Activities

5. Finance Section
6. Salient Features/Data of the College

21
FINANCE SECTION
North Zone
Implementation status (✔)
IOM Parameter Remarks
Good Satisfactory Poor
Working for the Finance & Accounts All procedures regarding Finance and accounts working
F-1
Department of TEVTA ✔ mentioned on IOM Pahe#52,53 are fully implemented.
Receipts and payments of salary and non salary
F-2 Receipts ✔ accounts are updated regularly.
Summary of Officer Salaries (PS 16 Salary statement of Officers (PS 16 and above) updated
F-3 ✔ and sent to AM Finance on monthly basis.
and above)
✔ Salary statement (PS 01 to 15)updated and sent AM
F-4 Summary of Staff Salary (PS 1 to 15) Finance on monthly basis.
Head wise Non salary expense report updated on daily
F-5 Summary of Non Salary ✔ basis and sent to AM Finance on monthly basis .
F-6 to
Institution Cash Book ✔ Cash books are prepared on daily basis.
F-7
Cash books are prepared on daily basis and reconcile d
F-8 Daily Bank and Cash Statements ✔ with bank on monthly basis.
F-9 Detail of Fixed Assets ✔ Fixed Asset register is complete and updated regularly.
F-10 to Budget & Expense report updated on daily basis and
Budget Poistion ✔ sent to AM Finance on monthly basis.
F-13
22
FINANCE SECTION
North Zone

%AGE IMPLEMENTATION
Good Satisfactory Poor Total
12 1 13
92% 8%

23
Overall Progress on IOM
North Zone

Sr Section Good Satisfactory Poor Total

1 Management Section 24 04 0 28

2 Academics Section 13 04 0 17

3 Co-Curricular Activities 04 02 0 06

4 Finance Section 12 01 0 13

Total 53 11 0 64

Progress in %age 83% 17%


24
North Zone

1. Introduction
2. Management Section
3. Academics Section
4. Co-Curricular Activities
5. Finance Section

6. Salient Features/Data of the College

25
SALIENT FEATURES/DATA OF THE COLLEGE
North Zone

1. College Total Enrolment of all courses Technology Wise


2. Staffing Data (Qualification Wise) and Vacancy Position (Regular + Visiting)
3. Extra Curricular Activities
4. Placement/OJT/Internship data
5. Pictures of Lawns/grounds/parking/Labs/Workshops/Café/Mess/Hostel etc
6. Best Practices
7. Special Initiative
8. Achievements (Curricular + Extra Curricular)
9. Future Projects/Plans
10. Gaps/Problems with Suggestions
26
Technology Wise Enrolment
Session 2018-19
North Zone

Morning Shift 2nd Shift


Sr. Name of Technology
1st Year 2nd Year 3rd Year Total 1st Year 2nd Year 3rd Year Total

1 DAE, Civil Technology 64 45 51 160 46 29 42 117


DAE, Electrical
65 51 47 163 64 43 29 136
2 Technology
DAE, Mechanical
63 56 43 162 65 52 45 162
3 Technology
Total 192 152 141 485 175 124 116 415

Link Enrolment Details of last 03 sessions


27
Staff Position and Qualification Levels of
Teaching Staff
North Zone

No. of Teaching Posts No. of Non Teaching Posts


Sanctioned Filled Vacant Sanctioned Filled Vacant
Regular=30 Regular=23
55 Visiting=02 23 37 D/W=06 08
TOTAL=32 TOTAL=29

B. Tech/BS
Ph.D/MS/M.Phil/M.Sc. Master & B.Sc. B. Tech
Engineering Certificate
Engineering. Engineering. Pass/D.A.E
Technology
7 17 9 20

Link Detail of Vacancy Position


28
Extra Curricular Activities
North Zone

 Following co-curricular activates are being conducted on regular basis.


 Tutorial
 Sports activities/competitions and prize distribution
 Debate /Speech contests
 TEVTA Skill Competitions
 NAVTTC Skill Competitions

29
Placement/OJT/Internship Support and Data
North Zone

• Name of IPO: Muhammad Ameer Mukhtiar Lecturer (Physics)


IPO has been designated who regularly visits local industries for the purpose of
Placement/OJT, Internships. Career Counseling sessions are arranged by Industry’s
Experts.

Enrolled Pass Out Employed Higher Studies Self Employed Un-Employed

900 622 110 90 18 404

30
Graphically Representation of Placement & Traceability

31
Pictorial Coverage of College Facilities
Lawns/grounds/parking/Labs/Workshops/Café/Mess/Hostel etc
North Zone

Lawn
Lawns

Lawns
Mech Lab

Electrical- Lab

32
Pictorial Coverage of College Facilities
Lawns/grounds/parking/Labs/Workshops/Café/Mess/Hostel etc
North Zone

Masque
Hostel

Cafeteria Play ground

Mech-Shop
Civil- Lab

33
Pictorial Coverage of College Facilities
Lawns/grounds/parking/Labs/Workshops/Café/Mess/Hostel etc
North Zone

Lawn

Ground

Main Gate

Lawn

34
Best Practices
North Zone

Sr. Best Practice Impact

1 Tree Plantation Enhancement of overall look of the institute


Enhancement of overall look of the institute
2 Clean and Green Pakistan Activities

Conduct of career counseling seminars by Industry and Awareness regarding jobs and higher studies in
3
different educational systems for higher studies students.
Awareness of technical education in high schools of
4 Enhancement in admissions of the institute
the area.

Arrangement of Road Safety Lectures by District Traffic


5 Awareness about road safety among the students
Police

35
Special Initiatives
North Zone
1. 6 Month NAVTTC Short courses are being run successfully in the institute
2. 5 weeks security guard course has successfully launched and completed in previous years.
3. Laptop distribution by HEC among students of the college having good academic record.

36
Achievements
North Zone (Curricular + Extra Curricular)
• Success Stories
Sr. No Name of Graduate Session Trade Department Salary
package
1 Zeeshan Khan 2009-2012 Electrical Abroad(Qatar) 150000
2 Ashir Waseem Khan 2011-2014 Mechanical Commissioned Officer 85000
In Pak Army
3 Touqeer Hassan 2014-2015 Electrical Abroad (Saudi Arabia) 6000
4 Syed Muhammad Adnan Shafqat 2009-2012 Electrical PAEC 45000
5 Raheem Ud DIN 2009-2012 Electrical PAEC 45000
6 Nasir Iqbal 2011-2014 Mechanical PAEC 45000
7 Muhammad Baqir Sadiq 2010-2013 Civil Punjab B&R 42000
8 Asif Shahzad 2015-2016 Mechanical Maple Leaf Cement Factory 42000
9 Malik Sheraz Ahmed 2011-2014 Civil MES 39000
10 Junaid Azhar 2011-2014 Civil Punjab TEVTA 36000
• Achievement
Sr. No. Name of Student Technology Exam PBTE Position

1 Zahid Khan Mechanical 1st Annual ,2017 3rd 37


Future Projects/Plans
North Zone

Sr Project Estimated Cost Soucre of Funds TimeLine

Preparation of Ground in front of college Development Funds of


1 600000 02-Months
main building the Institute

Re-appropriation Case
of profit amount for
2Bus Stand for Buses 100000 03-Months
construction of Bus
Stand is under process

Development Funds of
3Plantation and Development of Lawns 300000 01-Month
the Institute

38
Gaps/Problems with Suggestions
North Zone

Sr. Gaps/Problems Suggestions Progress/Working if any

Partition of Auto and Diesel Hall to


1 establish Labs for mechanical Approval for Tender is required. Tendering under process
technology

2 College Transport( 1 Bus) 1 more bus is required for students.

As per curriculum 6 labs are


3 Labs for Mechanical Technology
deficient forMechanicalTechnology.

39
Technology Wise Result
Session 2017-18
North Zone

1st Year 2nd Year 3rd Year


Sr Name of Technology
Appeared Pass %age Appeared Pass %age Appeared Pass %age

86 16 19 84 39 42 64 52 77
1 Civil
96 19 20 74 29 22 38 33 79
2 Electrical
111 26 24 89 49 50 67 59 88
3 Mechanical
Total 293 61 21 247 117 48 169 144 85

Link Detail Technology Wise Result


40
LAY OUT PLAN OF
GOVT. COLLEGE OF TECHNOLOGY MIANWALI
North Zone

41
THANKS

42

You might also like