Airtel GSM Network IP Conversion

HUAWEI TECHNOLOGIES CO., LTD.


Contents

1 GSM & UMTS network Topology

2 IP Clock Server Network Design

3 Co-Transmission Network Topology

4 Co-Transmission Cable Connections

5 Separate-Transmission Cable Connections

5 Full IP Project Plan

HISILICON SEMICONDUCTOR
HUAWEI TECHNOLOGIES CO., LTD. Page 2
Airtel Network GSM & UMTS network Topology

HISILICON SEMICONDUCTOR
HUAWEI TECHNOLOGIES CO., LTD. Page 3
Airtel Network IP Clock Server Network Design
 IP Clock Servers will be deployed at Kadawatha and integrated with RNC01A and RNC1B
CX routers. Reference clock will be extracted from MUX equipment.

HISILICON SEMICONDUCTOR
HUAWEI TECHNOLOGIES CO., LTD. Page 4
Airtel Network IP Clock Server Network Design
 IP Plan for Clock Servers
Network element Port Port Type IP address Remark
Service_Port_FE/GE-1 RJ 45 10.20.100.14/30 Reserved for future use
Service_Port_FE/GE-2 SFP 10.20.100.2/30 Service Port To be in use
IP Clock Server 1
Service_Port_FE/GE-3 SFP 10.20.100.6/30 Reserved for future use
Primary
Service_Port_FE/GE-4 SFP 10.20.100.10/30 Reserved for future use
O&M Port (DBG/NMS) RJ 45 10.200.163.120 M2000 Subnet
Service_Port_FE/GE-1 RJ 45 10.20.100.30/30 Reserved for future use
Service_Port_FE/GE-2 SFP 10.20.100.18/30 Service Port To be in use
IP Clock Server 2
Service_Port_FE/GE-3 SFP 10.20.100.22/30 Reserved for future use
Secondary
Service_Port_FE/GE-4 SFP 10.20.100.26/30 Reserved for future use
O&M Port (DBG/NMS) RJ 45 10.200.163.121 M2000 Subnet

 The IP transport network should meet the quality of service (QoS) requirements ;
 A single port supports a maximum of 512 Nodes. One Clock server supports 2048 Nodes.
QOS Requirement
Delay ≤ 60 ms
Jitter < 20 ms (one-way)
Packet loss < 1%

HISILICON SEMICONDUCTOR
HUAWEI TECHNOLOGIES CO., LTD. Page 5
Co-Transmission Network Topology(with IP)

HISILICON SEMICONDUCTOR
HUAWEI TECHNOLOGIES CO., LTD. Page 6
Separate Transmission Network Topology(with IP)

HISILICON SEMICONDUCTOR
HUAWEI TECHNOLOGIES CO., LTD. Page 7
Co-Transmission Cable Connections
Connect GTMU FE1 port to WMPT FE1 port using optical cable

HISILICON SEMICONDUCTOR
HUAWEI TECHNOLOGIES CO., LTD. Page 8
Separate Transmission Cable Connections
Connect GTMU FE0 port to the RTN directly using Ethernet cable

HISILICON SEMICONDUCTOR
HUAWEI TECHNOLOGIES CO., LTD. Page 9
Full IP Project Plan
As per the plan, 3 BSCs should convert to full IP. SOW are below,

• IPCLK Server installation in Kawadatha, commissioning and integration with CX routers.


• GOUc boards installation, fiber laying and integration with CX.
• CX-X3 V6R8 upgrade and LPU50 installation.
• RTN to CX and BSC to CX fiber laying- Requirements: AMP-48 PCS, Kandy-44 PCS & POL-44 PCS
• Full IP Migration--- There are 21 Rings. Per night, Only one ring cutover will be carried out with KPI confirmation.

P.S: Initially RTN ring will be considered.

Weeks
Descriptions
W1 W2 W3 W4 W5 W6 W7 W8 W9 W10 W11
Materials Arrive to Port-ETA
Materials Clearance
Materials Delivery
BSC GOUc card Installation & Integration
IP Clock Server Installation & Integration
CX-X3-V3R8 upgrade,LPU50-board Installation & commissioning
Site level fiber cable connection(Inter connection) & IP change @ BTS level
Abis & IuB IP migration BSC16- 8 Rings BSC18-6 Rings BSC11-7 Rings

HISILICON SEMICONDUCTOR
HUAWEI TECHNOLOGIES CO., LTD. Page 10
10
Thank you
www.huawei.com