Bhubaneshwar Case Study

You might also like

Download as pptx, pdf, or txt
Download as pptx, pdf, or txt
You are on page 1of 13

I.S.B.T.

Bhubaneshwar
INTRODUCTION
I.S.B.T at baramunda is the newly proposed and approved
bus terminal which will be constructed in place of the
existing terminal which is in a chaotic state.
Baramunda bus stand is the major bus terminus in the city
from where buses ply to all the districts in Odisha as well as
to neighbouring state's cities like Hyderabad, Kolkata,
Visakhapatnam, Raipur and Ranchi.

DESIGNED BY :
Delhi Integrated Multi Modal Transit System ltd

AIM:
To study the circulation segregation
To study the area distribution of facilities.

NH5
CONCEPT PLAN
AREA STATEMENT
ENTRY/EXIT
• For the terminal the bus entry is from the southern access road and
exit is on to the Main highway service lane.
• Dedicated entry/ exit gate and lane has been planned for local city
buses.
• The private cars and public transport like auto/ taxis enter from the
rear (northern side) access.
•The commercial area entry / exit is from the northern access road
• The intercity/ interstate buses enter from the southern access road,
move along the boundary towards the respective bays along the
terminal building.
•The local buses enter from its dedicated lane and move right directly
to their respective bays.
•Private vehicles enter and exit from the northern access road and
have a drop off along the other side of the terminal building.

Inter state buses Taxi


Intra city buses Private cars
Auto rickshaw
TERMINAL BUILDING
GROUND FLOOR- areas
•Pedestrian Circulation area
•Bus platform
•Ticket counters/ Enquiry counters /offices
•Toilets
•Electrical room/ BMS room
•Vertical Circulation elements
•Drinking Water Fountains (RO)
•Shops/ kiosks

Area distribution
circulation ticket counter/offices
bus platform electrical & BMS room
vertical circulation toilets
shops/kiosks
5%
5%
7%
10% 48%

14%
11%
TERMINAL BUILDING
FIRST FLOOR- areas
•Food court
•Toilets
•Electrical room/ BMS room
•Vertical Circulation elements- Elevators and Stairs
•Drinking Water Fountains (RO)

Area distribution
Food court 1040sqm

4% 13% Vertical circulation


13% 190sqm

70% Electrical/BMS room


64.1sqm

Toilets 200sqm
TERMINAL BUILDING
SECOND FLOOR- areas
•Drivers rest room
•Dormitories
•Toilets
•Electrical room/ BMS room
•Vertical Circulation elements- Elevators and Stairs
•Drinking Water Fountains (RO)

Area distribution
Drivers' dormitory General dormitory
Resting rooms Toilets
Vertical circulation Electrical/BMS room
5%

15% 10%
19%
14%

37%
TERMINAL BUILDING
THIRD FLOOR- areas
•Administrative offices
•Association offices
•Toilets
•Electrical room/ BMS room
•Vertical Circulation elements- Elevators and Stairs
•Drinking Water Fountains (RO)

Area distribution
Admistrative offices Associate offices
Toilets vertical circulation
Electrical/BMS room

5%
15%
47%
14%

19%
COMMERCIAL BUILDING
GROUND FLOOR- areas
•Space for Retail/ shops
•Toilets
•Electrical room/ BMS room
•Vertical Circulation elements- Elevators and Stairs
•Drinking Water Fountains (RO)

Area distribution
pedestrian circulation retail space
electrical/BMS room toilet
vertical circulation

20% 30%
8%

6% 36%
COMMERCIAL BUILDING
FIRST FLOOR- areas
•Restaurants (fine dining)
•Toilets
•Electrical room/ BMS room
•Vertical Circulation elements- Elevators and Stairs

Area distribution
Restaurant (fine dine) electrical/BMS room
toilet

6%
9%

85%
COMMERCIAL BUILDING
SECOND FLOOR- areas
•Space for retail
•Toilets
•Electrical room/ BMS room
•Vertical Circulation elements- Elevators and Stairs

Area distribution
space for retail electrical/BMS room
toilet vertical circulation

18%
7%

5% 70%
COMMERCIAL BUILDING
THIRD FLOOR- areas
•Space for offices
•Toilets
•Electrical room/ BMS room
•Vertical Circulation elements- Elevators and Stairs

Area distribution
space for offices electrical/BMS room
toilet vertical circulation

18%
7%

5% 70%
COMMERCIAL BUILDING
FOURTH FLOOR/FIFT FLOOR- areas
•Budget hotel
•Toilets
•Electrical room/ BMS room
•Vertical Circulation elements- Elevators and Stairs

Area distribution
Budget hotel electrical/BMS room
toilet vertical circulation

18%
7%

5% 70%

You might also like