Philippine Green Building Code

You might also like

Download as pptx, pdf, or txt
Download as pptx, pdf, or txt
You are on page 1of 6

INTRODUCTION

BUILDING DEMAND-
1998- 2014 FASTER GROWING BUILDING INDUSTRY IN THE COUNTRY

ENERGY USE AND CLIMATE CHANGE-

BUILDING INDUSTRY CONSUMES 36% OF THE NATIONAL ENERGY


GREEN BUILDING- 36 %
DEVELOP SUSTAINABLE BUILDING DESIGN AND IT’S RESILIENCY BUILDING
INDUSTRY
CODE DEVELOPMENT AND IMPLEMENTATION-
JUNE 2015 IMPLEMENTATION BY DPWH (DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS)
- PROMOTE RESOURCE EFFICIENCY IN
ENERGY AND WATER,
SOLID WASTE MANAGEMENT,
INDOOR INVIRONMENT QUALITY,
MATERIAL SUSTAINABILITY,
AND SITE SUSTAINABILITY.
- THE REFERRAL CODE OF THE NATIONAL BUILDING CODE (PD NO. 1096)
PERMIT PROCESS>
APLLICATION DRAWING AND SPECS DOCUMENTATION

ENERGY EFFICIENCY>
BUILDING ENVELOPE, MECHANICAL SYSTEMS, ELECTRICAL SYSEMS

WATER EFFICIENCY>
FIXTURES, WATER HARVESTING, WATER RECYCLING

MATERIAL SUSTAINABILITY>
NON- TOXIC, DURABILITY

SOLID WASTE MANAGEMENT>


MATERIAL RECOVERY FACILITY (MRF)

SITE SUSTAINABILITY>
SITE GROUND PREPARATION: FLOOD SAFE, TYPHON SAFE,
SWOT ANALYSIS
STRENGHTS WEAKNESSES OPPORTUNITES THREATS
• DEEPER COMPLIANCE • DEEPER COMPLIANCE • EXPENSIVE INITIAL OR
OF GREEN BUILDING • NEWLY IMPLEMENTED OF THE CODE AND CAPITAL EXPENSES OF
CODE COMPLEMENTS CODE BY PRACTICE OF GREEN THE PROJECT, THAT
THE COMPANY’S GOVERNMENT. STILL BUILDING DESIGN MAY DISCOURAGE
VISION “…WHILE PICKING UP PACE OF ADVANCES THE OWNER TO PUSH
RESPECTING MOTHER FULL ACCEPTANCE TO COMPANY MORE THROUGH THE
NATURE” PROJECT OWNERS READY TO COMPETE PROJECT
GLOBAL
• BACKS UP THE • STILL NEED TO STUDY • LESSENS THE RENTABLE
COMPANY IN TO JUSTIFY WITH • COMPANY TO BE FLOOR AREAS, MAY
IMPOSING THE GREEN PROJECT OWNERS EXPOSED TO MORE CAUSE THE OWNER TO
DESIGN TO THE AND CLIENTS THE RESPONSIBLE GREEN DISCONTINUE THE
PROJECT OWNERS GOOD IMPLICATION BUILDING PRODUCTS PROJECT
AND CLIENTS OF THE CODE AND CHANCES TO
MEET WITH GROUPS
• CONCRETE • CODE STILL TO BE WITH THE SAME
MEASUREMENT FOR STUDIED TO GREEN DESIGN
THE COMPREHENSIVE ANALYTICAL/ INTEREST FOREIGN
GREEN DESIGN OF CACULATION AND DOMESTIC.
THE COMPANY APPROACH IN
SPECIFYING • COMPANY CAN
• HIGH ADVANTAGE TO MATERIALS, FINISHES, HAVE OPPORTUNITY
OPERATIONAL COST AND EVEN COLORS. TO TAP WITH THE
OF THE BUILDING OR INTERNATIONAL
UNIT. ENERGY SUPPORTERS OF
EFFICIENT GREEN BUILDING
AFFILIATIONS
THANK YOU
FOR THE TIME
OCB+AA PURPOSE: EXECUTION

You might also like