Professional Documents
Culture Documents
PPT
PPT
2
3. Naitwar Mori HEP (60MW) - Salient Features
FEATURES DESCRIPTION
River Tons (tributary of Yamuna)
Design Head Gross Head: 96.76m , Net Head: 90.76m
Design Discharge 73.5 cumecs
Design Energy 265.50 MU annually
Barrage Height 18.50 m from foundation level
Head Race Tunnel 4.32 km long, 5.6 m dia
Surge Shaft 18 m dia, 53.63 m deep
Pressure Shaft 1 No, 4 m dia, 154.47 m (L)
Power House Underground, 57.8 m (L) x 18.6 m (W) x 32.27 m (H)
Project Cost 648.33 Crore at Oct 16 PL
3
4. BTPP- Salient Features
Location Chausa, Distt. Buxar, Bihar
Land 1058 acre (for main plant) and 225 acre for
railway siding and water pipeline
Water Source River Ganga, 5.3 Km away
Fuel/Coal Magadh/Amrapali Coal Block, Jharkhand of
CCL).
Chimney One no. 275 m High (with FGD)
Turbine Single Reheat Condensing Type
Transformer 6 nos. single phase & 1 no. spare
Annual Generation 9828 MU
Project Cost Rs. 10,439.09 Cr. at Jan, 19 at price level
Levellised tariff Rs. 4.19/unit
4
5. Kholongchhu HEP (600 MW)
Executed by Kholongchhu Hydro Energy Ltd
(50:50 JV with Druk Green Power Corporation) :
Salient Features:
Project Location Trashiyangtse District of Bhutan
Dam Concrete Gravity, 94 m high
HRT 15.77 km, 5.7m diameter, 6 adits
Surge shaft Depth: 152.8m ; Dia: 9.5m
Power House Underground, 132m x 21m x 43m
Design Head 761.53 m
Design Discharge 54 m3/ sec
Design Energy 2569 MU
Project cost Rs. 4971.08 Cr. at March, 2019 PL
Levellised Tariff Rs. 4.34/unit
5
1. Luhri Stage-1 HEP (210 MW)- Salient Features
Location Shimla & Kullu Districts in H. P.
River Satluj River
Dam 80 m high
Power House Dam Toe Surface (122 X 51 X 66) m
Design discharge 491 m3/ sec
Design head 37 m
Design Energy 758 MU
Project cost Rs. 1732.59 crores at Jan, 2019 price
level
Levellised tariff Rs. 4.15/unit
6
2. Dhaulasidh HEP (66 MW) – Salient Features
Project Location Hamirpur District in H. P.
River Beas River
Dam Concrete gravity 70 m high
Power House Dam Toe Surface [56 x 23 x 48] m
Design discharge 161 m3/sec
Design head 45 m
Design Energy 304 MU
Project cost Rs. 667.98 crores at Dec, 2018 price level
7
3. Devsari HEP (162 MW) – Salient Features
Location Chamoli District in Uttarakhand
River Pindar River (Ganga Basin)
Dam 35 m high from river bed
HRT 5.6 m dia, 17.9 km long
Power House Underground [80 x 20 x 43] m
Design discharge 78 m3/sec
Design head 230 m
Design Energy 556 MU
Project Cost Rs. 1387.37 Cr. at Dec, 2019 PL
Levellised tariff Rs. 5.97/unit
8
4. Jakhol Sankri HEP - 44 MW – Salient Features
Project Location Uttarkashi District in Uttarakhand
River Supin River (Yamuna Basin)
Diversion Structure 17m high Barrage
HRT 3m dia, 6.6 km long
Power House Underground [61(L) X 17 (W) X 35
(H)] m
Design discharge 11 m3/ sec
Design head 436 m
Design Energy 166 MU
Project cost Rs. 477.15 Cr. at April, 2016 PL
Levellised tariff Rs. 7.56/unit
9
1. Sunni Dam HEP (382 MW) - Salient Features
Location Shimla & Mandi Districts
in HP
River Satluj River
Design head 58 m
11
3. Jangi Thopan Powari HEP (780 MW):
• Project Cost- 5463.18 Cr at Sept, 19 PL.
• Six preliminary chapters submitted to CEA on 04.10.19
and 1st consultation meeting held on 04.11.19. MoM
issued on 06.01.2020.
• Survey work completed on 08.12.19.
• Preliminary studies & identification of land in progress.
12