PROJECT
Rehabilitation and Upgradation to two lane with paved shoulder from design Ch. 531/775
to design Ch. 598/450 (Kunkuri to CH/JH Border Section) of NH-78 in the state of
Chhattisgarh under NHDP-IV through Engineering, Procurement & Construction (EPC)
basis
Authority's Engineer
M/s Bloom Companies, LLC
EPC Contractor
M/s GAWAR-SCC(JV)
INDEX
Rehabilitation and Up gradation to two lane with paved shoulder from Km 531/775 to Km 598/450 (Kunkuri to CH/JH Border
Section) of NH-78 in the state of Chhattisgarh under NHDP-IV through Engineering, Procurement & Construction (EPC) basis
Page 3
1 LOCATION MAP
Rehabilitation and Up gradation to two lane with paved shoulder from Km 531/775 to Km 598/450 (Kunkuri to CH/JH Border
Section) of NH-78 in the state of Chhattisgarh under NHDP-IV through Engineering, Procurement & Construction (EPC) basis
Page 4
2 EXECUTIVE SUMMARY
NH No.:- NH-78
Phase :- NHDP-IV
Mode / Cost of the Work :- EPC Mode / Rs. 265.58 Cr
Performance Security :- Rs.13.28 Cr & Rs 2.48 Cr
No. of Lanes :- Two Lane with paved shoulders.
Project Length :- 66.675 Km.
Realignment Length :- 5.91 Km.
Bypass Length :- Nil
Toll Plaza :- 01 No. at Ch. 593+350 (Length- 300.00 Mtr.)
Fly Over & ROB :- NIL
Major Bridge :- 01 Nos. Ch. 598.340
Underpass / Overpass :- NIL
Construction Period :- 730 days from appointed date
Maintenance Period :- 4 years from provisional completion
DPR Consultant :- M/s Mott Mac Donald Pvt. Ltd.
Contractor :- M/s GAWAR-SCC (JV)
LOA No. :- RW/NH 37015/01/2017-NHDP-IVA dated 09-06-2017
Authority Engineer :- M/s Bloom Companies, LLC
Rehabilitation and Up gradation to two lane with paved shoulder from Km 531/775 to Km 598/450 (Kunkuri to CH/JH Border
Section) of NH-78 in the state of Chhattisgarh under NHDP-IV through Engineering, Procurement & Construction (EPC) basis
Page 5
3 PRELIMINARY SYNOPSIS
Performance Security Date - 28.06.2017 (Provisions- Within 10 days from EPC Agreement)
Rehabilitation and Up gradation to two lane with paved shoulder from Km 531/775 to Km 598/450 (Kunkuri to CH/JH Border
Section) of NH-78 in the state of Chhattisgarh under NHDP-IV through Engineering, Procurement & Construction (EPC) basis
4 SCOPE – ROAD WORKS Page 6
Rehabilitation and Up gradation to two lane with paved shoulder from Km 531/775 to Km 598/450 (Kunkuri to CH/JH Border
Section) of NH-78 in the state of Chhattisgarh under NHDP-IV through Engineering, Procurement & Construction (EPC) basis
Page 7
5 SCOPE – STRUCTURE WORKS
Rehabilitation and Up gradation to two lane with paved shoulder from Km 531/775 to Km 598/450 (Kunkuri to CH/JH Border
Section) of NH-78 in the state of Chhattisgarh under NHDP-IV through Engineering, Procurement & Construction (EPC) basis
Page 8
6 SCOPE – FACILITIES & OTHER WORKS
CC Drains 2 X 10.0 Km
1 No.
Toll Plazas
Ch. 593+350
Rehabilitation and Up gradation to two lane with paved shoulder from Km 531/775 to Km 598/450 (Kunkuri to CH/JH Border
Section) of NH-78 in the state of Chhattisgarh under NHDP-IV through Engineering, Procurement & Construction (EPC) basis
Page 9
7 KEY PLAN
Rehabilitation and Up gradation to two lane with paved shoulder from Km 531/775 to Km 598/450 (Kunkuri to CH/JH Border
Section) of NH-78 in the state of Chhattisgarh under NHDP-IV through Engineering, Procurement & Construction (EPC) basis
Page 10
8 SITE ESTABLISHMENT & CONTROL
Camps Established –
RMC Plants –
20 Cum at village Chapatoli
30 Cum at Shankh River
120 Cum at village Jhargaon
Fixed Stone Crushers –
200 TPH Crusher Plant with stone quarry at village Chapatoli
Borrow Areas –
Approved : 32 No.
Rehabilitation and Up gradation to two lane with paved shoulder from Km 531/775 to Km 598/450 (Kunkuri to CH/JH Border
Section) of NH-78 in the state of Chhattisgarh under NHDP-IV through Engineering, Procurement & Construction (EPC) basis
Page 11
9 MANPOWER DEPLOYED 1/3
Shivalaya construction co. pvt. Ltd.
project name:-KUNKURI TO CG/JH BORDER ROAD PROJECT NH-78 (NEW NH-43)
Month-Wise Deployment of Manpower at Site
SL. No. Manpower Jun-17 Jul-17 Aug-17 Sep-17 Oct-17 Nov-17 Dec-17 Jan-18 Feb-18
1 PROJECT HEAD 1 1 1 1 1 1 1 1 1
2 BILLING/QS 2 2 2 2 2 2 2 2 3
3 PROJECT MANAGERS 2 2 2 2 2 2 2 2 2
4 DPM HIGHWAY/SR ENGR 2 2 2 2 2 2 2 2 2
5 DPM STRUCTURE / SR ENGR 2 2 2 2 2 2 2 2 2
6 ENGINEERS 3 6 12 18 21 24 27 27 27
7 FORMANS 2 3 5 7 8 9 10 10 10
8 SUPERVISORS 10 15 2 2 25
9 SURVEYORS 5 9 10 10 10
10 SUVEY HELPERS 5 7 7 8 9
11 LAB HEAD 1 1 1 1 1
12 LAB TECHNECIANS 5 6 7 8 9
13 LAB HELPER 6 8 10 12 14
14 SAFETY HEAD 1 1 1 1 1
15 SAFETY ASSTT. 2 3 4 5 5
16 SAFETY HELPERS 2 3 4 5 8
FUNCTIONAL HEADS (Store, HR,
17
Acc, etc.) 3 3 3 3 6
18 FUNCTIONAL ASST. 3 4 4 4 4
19 FUNCTIONAL SUPV. 3 3 3 3 3
20 FUNCTIONAL HELPERS 2 12 12 12 12
21 OPERATORS 3 3 5 13 15 30 35 44 45
22 MECHANIC / ELECTRICIAN 1 1 1 2 2 3 3 4 6
23 DRIVERS 7 7 8 11 18 24 33 60 80
24 COOK 1 2 3 3 3 3 4 8 12
25 HELPERS 3 3 5 13 15 30 35 44 45
TOTAL 29 34 48 76 139 207 224 280 342
Rehabilitation and Up gradation to two lane with paved shoulder from Km 531/775 to Km 598/450 (Kunkuri to CH/JH Border
Section) of NH-78 in the state of Chhattisgarh under NHDP-IV through Engineering, Procurement & Construction (EPC) basis
Page 12
9 MANPOWER DEPLOYED 2/3
Shivalaya construction co. pvt. Ltd.
project name:-KUNKURI TO CG/JH BORDER ROAD PROJECT NH-78 (NEW NH-43)
Month-Wise Deployment of Manpower at Site
SL. No. Manpower Mar-18 Apr-18 May-18 Jun-18 Jul-18 Aug-18 Sep-18 Oct-18 Nov-18 Dec-18
1 PROJECT HEAD 1 1 1 1 1 1 1 1 1 1
2 BILLING/QS 3 3 3 3 3 3 3 3 3 3
3 PROJECT MANAGERS 2 2 2 2 2 2 2 2 2 2
4 DPM HIGHWAY/SR ENGR 2 2 2 2 2 2 2 2 2 2
5 DPM STRUCTURE / SR ENGR 2 2 2 2 2 2 2 2 2 2
6 ENGINEERS 27 27 27 27 27 27 27 27 27 27
7 FORMANS 10 10 10 10 10 10 10 10 10 10
8 SUPERVISORS 30 30 30 30 30 30 30 30 30 30
9 SURVEYORS 10 10 10 10 10 10 10 10 10 10
10 SUVEY HELPERS 10 11 12 12 12 12 12 12 12 12
11 LAB HEAD 1 1 1 1 1 1 1 1 1 1
12 LAB TECHNECIANS 10 11 11 11 11 11 11 11 11 11
13 LAB HELPER 16 18 18 18 18 18 18 18 18 18
14 SAFETY HEAD 1 1 1 1 1 1 1 1 1 1
15 SAFETY ASSTT. 5 5 5 5 5 5 5 5 5 5
16 SAFETY HELPERS 10 12 15 15 15 15 15 15 15 15
17 FUNCTIONAL HEADS 6 6 6 6 6 6 6 6 6 6
18 FUNCTIONAL ASST. 4 4 4 4 4 4 4 4 4 4
19 FUNCTIONAL SUPV. 3 3 3 3 3 3 3 3 3 3
20 FUNCTIONAL HELPERS 12 12 12 12 12 12 12 12 12 12
21 OPERATORS 50 51 51 52 52 52 52 52 52 52
22 MECHANIC / ELECTRICIAN 8 10 10 10 10 10 10 10 10 10
23 DRIVERS 99 99 99 99 99 99 99 99 99 99
24 COOK 16 20 25 25 25 25 25 25 25 25
25 HELPERS 50 51 51 52 52 52 52 52 52 52
TOTAL 388 402 411 413 413 413 413 413 413 413
Rehabilitation and Up gradation to two lane with paved shoulder from Km 531/775 to Km 598/450 (Kunkuri to CH/JH Border
Section) of NH-78 in the state of Chhattisgarh under NHDP-IV through Engineering, Procurement & Construction (EPC) basis
Page 13
9 MANPOWER DEPLOYED 3/3
Shivalaya construction co. pvt. Ltd.
Project name:-KUNKURI TO CG/JH BORDER ROAD PROJECT NH-78 (NEW NH-43)
Month-Wise Deployment of Manpower at Site
SL. No. Manpower Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 Jul-19 Aug-19 Sep-19 Oct-19 Nov-19 Dec-19
1 PROJECT HEAD 1 1 1 1 1 1 1 1 1 1 1 1
2 BILLING/QS 3 3 3 3 3 3 3 3 4 4 4 4
3 PROJECT MANAGERS 2 2 2 2 2 2 2 2 2 2 2 2
DPM HIGHWAY/SR
4
ENGR 2 2 2 2 2 2 2 2 2 2 2 2
DPM STRUCTURE / SR
5
EN 2 2 2 2 2 2 2 2 2 2 2 2
6 ENGINEERS 27 25 25 25 25 25 25 25 25 25 25 25
7 FORMANS 10 10 10 10 10 10 10 10 10 10 10 10
8 SUPERVISORS 30 31 31 31 31 31 31 31 31 31 31
9 SURVEYORS 10 10 10 10 10 10 10 10 10 10 10 10
10 SUVEY HELPERS 12 12 12 12 12 12 12 12 12 12 12 12
11 LAB HEAD 1 1 1 1 1 1 1 1 1 1 1 1
12 LAB TECHNECIANS 11 11 11 11 11 11 11 11 11 11 11 11
13 LAB HELPER 18 18 18 18 18 18 18 18 18 18 18 18
14 SAFETY HEAD 1 1 1 1 1 1 1 1 1 1 1 1
15 SAFETY ASSTT. 5 5 5 5 5 5 5 5 5 5 5 5
16 SAFETY HELPERS 15 15 15 15 15 15 18 18 18 18 18 18
17 FUNCTIONAL HEADS 6 6 6 6 6 6 6 6 6 6 6 6
18 FUNCTIONAL ASST. 4 4 4 4 4 4 4 4 4 4 4 4
19 FUNCTIONAL SUPV. 3 3 3 3 3 3 3 3 3 3 3 3
20 FUNCTIONAL HELPERS 12 12 12 12 12 12 12 12 12 12 12 12
21 OPERATORS 52 52 52 52 52 50 48 40 40 40 40 40
MECHANIC /
22
LECTRICIAN 10 10 10 10 10 10 10 10 10 10 10 10
23 DRIVERS 99 95 95 95 85 82 82 70 70 70 70 70
24 COOK 25 25 25 25 24 24 26 26 26 26 26 26
25 HELPERS 52 52 52 52 50 50 48 37 37 37 37 37
TOTAL 413 408 377 408 395 390 391 360 361 361 361 361
Rehabilitation and Up gradation to two lane with paved shoulder from Km 531/775 to Km 598/450 (Kunkuri to CH/JH Border
Section) of NH-78 in the state of Chhattisgarh under NHDP-IV through Engineering, Procurement & Construction (EPC) basis
Page 14
10 MACHNARIES DEPLOYED 1/3
Shivalaya construction co. pvt. Ltd.
project name:-KUNKURI TO CG/JH BORDER ROAD PROJECT NH-78 (NEW NH-43)
Month-Wise Deployment of Plant & Machineries at Site
SL. No. Equipments Name Jun-17 Jul-17 Aug-17 Sep-17 Oct-17 Nov-17 Dec-17 Jan-18
1 EXCAVATOR 1 1 2 2 2 5 5 5
2 SOIL COMPACTOR 1 1 2 3 3 4 4 5
3 MOTOR GRADER 1 1 1 2 2 3 3 4
4 DUMPERS -20 MT 5 5 5 7 10 10 15 35
5 WATER TANKER 1 1 2 3 5 7 10 10
6 WHEEL LOADER 4 5 5 5 6
7 MOBILE CURESHER PLANT -200 TPH 1 1 1 1 1
8 ROCK BREAKER 1 1 1 1 1
9 Diesel Generator 4 5 6 6 6
10 DIESEL DISPENSER 2 2 2 2
11 TRAILER 2 2 2 2
12 AIR COMPRESSOR 1 1 1 1
13 WATER & MUD PUMP 5 5 7
14 WEIGH BRIDGE 2 3 4
15 TOWER LIGHT 2 2 3
16 4 VEHILER CAR 2 3 4
17 FIXED CURESHER PLANT -200 TPH 2 2 2
18 AJAX FIORI 2 2 2
19 TRANSIT MIXER 2 2 4
20 CONCRETE PUMP 1 1 2
21 BATCHING PLANT 20 cum 1 1 1
22 BATCHING PLANT 30 cum 1 1 1
23 BATCHING PLANT 120 cum 1 2 2
24 DLC PAVER 1 1
25 PQC PAVER 2 2
26 TENDOM ROLLER 1 1
TOTAL 9 9 12 27 39 68 83 114
Rehabilitation and Up gradation to two lane with paved shoulder from Km 531/775 to Km 598/450 (Kunkuri to CH/JH Border
Section) of NH-78 in the state of Chhattisgarh under NHDP-IV through Engineering, Procurement & Construction (EPC) basis
Page 15
10 MACHNARIES DEPLOYED 2/3
Shivalaya construction co. pvt. Ltd.
project name:-KUNKURI TO CG/JH BORDER ROAD PROJECT NH-78 (NEW NH-43)
Month-Wise Deployment of Plant & Machineries at Site
SL. No. Equipments Name Feb-18 Mar-18 Apr-18 May-18 Jun-18 Jul-18 Aug-18 Sep-18
1 EXCAVATOR 7 7 7 8 10 10 12 12
2 SOIL COMPACTOR 5 6 6 6 6 6 6 6
3 MOTOR GRADER 4 5 5 5 5 5 5 5
4 DUMPERS -20 MT 50 65 65 65 65 65 65 65
5 WATER TANKER 10 10 15 15 15 15 15 15
6 WHEEL LOADER 6 6 6 6 6 6 6 6
7 MOBILE CURESHER PLANT -200 TPH 1 1 1 1 1 1 1 1
8 ROCK BREAKER 1 1 1 1 1 1 1 1
9 Diesel Generator 6 7 7 7 7 8 8 8
10 DIESEL DISPENSER 2 2 2 2 2 2 2 2
11 TRAILER 2 2 2 2 2 2 2 2
12 AIR COMPRESSOR 1 1 1 1 1 1 1 1
13 WATER & MUD PUMP 8 8 8 8 8 8 8 8
14 WEIGH BRIDGE 4 4 4 4 4 4 4 4
15 TOWER LIGHT 3 3 3 4 4 4 4 4
16 4 VEHILER CAR 6 7 8 8 8 8 8 8
17 FIXED CURESHER PLANT -200 TPH 2 2 2 2 2 2 2 2
18 AJAX FIORI 2 2 2 2 2 2 2 2
19 TRANSIT MIXER 5 5 5 5 5 5 5 5
20 CONCRETE PUMP 2 2 2 2 2 2 2 2
21 BATCHING PLANT 20 cum 1 1 1 1 1 1 1 1
22 BATCHING PLANT 30 cum 1 1 1 1 1 1 1 1
23 BATCHING PLANT 120 cum 2 2 2 2 2 2 2 2
24 DLC PAVER 1 1 1 1 1 1 1 1
25 PQC PAVER 2 2 2 2 2 2 2 2
26 TENDOM ROLLER 1 1 1 1 1 1 1 1
TOTAL 135 154 160 162 164 165 167 167
Rehabilitation and Up gradation to two lane with paved shoulder from Km 531/775 to Km 598/450 (Kunkuri to CH/JH Border
Section) of NH-78 in the state of Chhattisgarh under NHDP-IV through Engineering, Procurement & Construction (EPC) basis
Page 16
10 MACHNARIES DEPLOYED 3/3
Shivalaya Construction co. pvt. Ltd.
Project name:-KUNKURI TO CG/JH BORDER ROAD PROJECT NH-78 (NEW NH-43)
Month-Wise Deployment of Plant & Machineries at Site
SL.
Equipments Name Sep-18 Oct-18 Nov-18 Dec-18 Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 Jul-19 Aug-19 Sep-19 Oct-19 Nov-19 Dec-19
No.
1 EXCAVATOR 12 12 12 11 10 10 10 10 10 9 9 9 9 9 9 9
2 SOIL COMPACTOR 6 6 6 6 6 6 6 6 6 3 3 3 3 3 3 3
3 MOTOR GRADER 5 5 5 5 5 5 5 5 5 3 3 3 3 3 3 3
4 DUMPERS -20 MT 65 65 65 65 65 65 64 64 58 48 48 48 48 48 48 48
5 WATER TANKER 15 18 18 18 18 18 18 18 15 14 14 14 14 14 14 14
6 WHEEL LOADER 6 6 6 6 6 6 6 6 4 4 4 4 4 4 4 4
MOBILE CURESHER PLANT -
7
200 TPH 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
8 ROCK BREAKER 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
9 Diesel Generator 8 8 8 8 8 8 8 8 8 10 10 10 10 10 10 10
10 DIESEL DISPENSER 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
11 TRAILER 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
12 AIR COMPRESSOR 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2
13 WATER & MUD PUMP 8 8 8 8 8 8 8 8 12 10 10 10 10 10 10 10
14 WEIGH BRIDGE 4 4 4 4 4 4 4 4 4 3 3 3 3 3 3 3
15 TOWER LIGHT 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
16 4 VEHILER CAR 8 8 8 8 8 8 8 8 8 14 14 14 14 14 14 14
FIXED CURESHER PLANT -250
17
TPH 2 2 2 2 2 2 2 2 1 1 1 1 1 1 1 1
18 AJAX FIORI 2 2 2 2 2 2 2 2 2 1 1 1 1 1 1 1
19 TRANSIT MIXER 5 5 5 5 5 5 5 5 5 11 11 11 11 11 11 11
20 CONCRETE PUMP 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
21 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
BATCHING PLANT 20 cum
22 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
BATCHING PLANT 30 cum
23 2 2 2 2 2 2 2 2 1 1 1 1 1 1 1 1
BATCHING PLANT 120 cum
24 DLC PAVER 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
25 PQC PAVER 2 2 2 2 2 1 1 1 1 1 1 1 1 1 1 1
26 TENDOM ROLLER 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2
TOTAL 167 170 170 169 168 167 166 166 157 152 152 152 152 152 152 152
Rehabilitation and Up gradation to two lane with paved shoulder from Km 531/775 to Km 598/450 (Kunkuri to CH/JH Border
Section) of NH-78 in the state of Chhattisgarh under NHDP-IV through Engineering, Procurement & Construction (EPC) basis
Page 17
11 LAND HANDING OVER SCHEDULE
% Km
It may be mentioned here that the Appointed Date must be declared within 30 days from
the EPC Agreement Date. But, it was declared on 08.01.18 with a delay of 170 days and
providing only 30% land instead of 90% . Refer Clauses 4.1.3 (a), 8.2, 28.1 & Annexure -II,
Schedule-A of EPC Agreement.
Rehabilitation and Up gradation to two lane with paved shoulder from Km 531/775 to Km 598/450 (Kunkuri to CH/JH Border Section)
of NH-78 in the state of Chhattisgarh under NHDP-IV through Engineering, Procurement & Construction (EPC) basis
12 LAND HANDED OVER Page 18
Existing Chainage Total Actual Land Availability (Km)
Existing
Sl. No.
From To Length 08-Jan-18 09-Mar-18 26-Apr-18 29-Jun-18 20-Aug-18 12-Oct-18 04-Apr-19
(Km)
531+250 (Design Ch-
1 536+600 5.350 5.350
531.775)
Rehabilitation and Up gradation to two lane with paved shoulder from Km 531/775 to Km 598/450 (Kunkuri to CH/JH Border Section) of NH-78 in the
state of Chhattisgarh under NHDP-IV through Engineering, Procurement & Construction (EPC) basis
Page 19
Existing Chainage Total Actual Land Availability (Km)
Existing
Sl. No
From To Length 08-Jan-18 09-Mar-18 26-Apr-18 29-Jun-18 20-Aug-18 12-Oct-18 04-Apr-19
(Km)
25 575+600 577+800 2.200 2.200
26 577+800 578+500 0.700 0.700
27 578+500 579+500 1.000 1.000
28 579+500 581+000 1.500 1.500
29 581+000 582+000 1.000 1.000
30 582+000 583+200 1.200 1.200
31 583+200 584+000 0.800 0.800
32 584+000 584+800 0.800 0.800
33 584+800 586+000 1.200 1.200
34 586+000 586+900 0.900 0.900
35 586+900 588+000 1.100 1.100
36 588+000 588+200 0.200 0.200
37 588+200 589+000 0.800 0.800
38 589+000 589+900 0.900 0.900
39 589+900 591+000 1.100 1.100
40 591+000 592+000 1.000 1.000
41 592+000 593+000 1.000 1.000
42 593+000 594+000 1.000 1.000
597+946(Design
43 594+000 3.950 3.950
Ch-598.450)
Total 66.696 20.000 6.750 7.246 7.000 9.250 4.950 11.500
Less Hindrance Exists up to till date 0.500 0.500 0.500 0.500 0.500 0.500 0.500
Net Available Land / PROW (Cumm.) 19.500 26.250 33.496 40.496 49.746 54.696 66.196
Available Land / PROW (Cumm.) in % 29.24% 39.36% 50.22% 60.72% 74.59% 82.01% 99.25%
Rehabilitation and Up gradation to two lane with paved shoulder from Km 531/775 to Km 598/450 (Kunkuri to CH/JH Border
Section) of NH-78 in the state of Chhattisgarh under NHDP-IV through Engineering, Procurement & Construction (EPC) basis
13 HINDRANCES IN AVAILABLE LAND Page 20
Rehabilitation and Up gradation to two lane with paved shoulder from Km 531/775 to Km 598/450 (Kunkuri to CH/JH Border
Section) of NH-78 in the state of Chhattisgarh under NHDP-IV through Engineering, Procurement & Construction (EPC) basis
14 DELAY IN LAND HANDING OVER SCHEDULE Page 21
Delay in
Land Handing over Land actually Affected
terms of
Schedule as per handed over to Land
Description Dates Days no. of
EPC Agreement Contractor /ROW
days
% Km % Km Km
170
Appointed Date 8-Jan-18 0 90% 60.008 26.86% 17.911 42.097
Days
150 days from AD 7-June-18 150 100% 66.675 47.85% 31.904 34.771
451+170
Up to 4th April, 2019 04-April-19 451 100% 66.675 91.72% 61.157 5.518 =621
Days
Up to Month Under 722+170
31-Dec-19 722 100% 66.675 100.00% 66.675 0.500
Report =892Days
Page 22
15 CONSTRUCTION SCHDULE & PROJECT MILESTONES
Rehabilitation and Up gradation to two lane with paved shoulder from Km 531/775 to Km 598/450 (Kunkuri to CH/JH Border
Section) of NH-78 in the state of Chhattisgarh under NHDP-IV through Engineering, Procurement & Construction (EPC) basis
16 PROGRESS OF ROAD WORKS Page 23
Project Length 66.675 KM
Hand Over Land 66.675 KM
Hindrances Land 0.500 KM
Available Land 66.175 KM
Sl No Item Total Length Up to date Previous This Month Progress (%)
(A) Widening and strengthening reconstruction of existing road.
1 Earthwork 60.250 51.047 48.617 2.430 84.73%
2 GSB 60.250 47.560 44.935 2.625 78.94%
3 DLC 59.367 44.425 41.765 2.660 74.83%
4 PQC 59.367 43.181 40.823 2.358 72.74%
5 WMM 0.883 0 0 0 0.00%
6 DBM 0.883 0 0 0 0.00%
7 BC 0.883 0 0 0 0.00%
(B) New two lane realignment/ By-Pass.
1 Earthwork 5.91 5.91 2.870 2.615 0.255
2 GSB 5.91 5.91 2.510 2.245 0.265
3 DLC 5.91 5.91 1.625 1.445 0.180
4 PQC 5.91 5.91 1.950 1.620 0.330
Rehabilitation and Up gradation to two lane with paved shoulder from Km 531/775 to Km 598/450 (Kunkuri to CH/JH
Border Section) of NH-78 in the state of Chhattisgarh under NHDP-IV through Engineering, Procurement & Construction
(EPC) basis
17 PROGRESS OF STRUCTURE & OTHER WORKS Page 24
Total Nos This Progress
Sl. No Item Up to date Previous
/Rmt/Km Month (%)
1 HPC / Box Culvert/Slab 91 86 85 1 94.51%
2 HPC Widening 14 14 14 0 100.00%
Rehabilitation and Up gradation to two lane with paved shoulder from Km 531/775 to Km 598/450 (Kunkuri to CH/JH Border
Section) of NH-78 in the state of Chhattisgarh under NHDP-IV through Engineering, Procurement & Construction (EPC) basis
18 PHYSICAL & FINANCIAL PROGRESS Page 25
Physical Progress : -
Item wise Physical Effective Physical
Sl. No Item Wt. of Contract (%)
Progress (%) Progress (%)
Financial Progress : -
Cumm. Effective Financial Progress
Sl No IPC No. IPC Date Amount
Amount (%)
1 IPC-1 22.07.2018 6.52 6.52 2.46%
2 IPC-2 31.10.2018 15.81 22.33 8.41%
3 IPC-3 03.01.2019 18.25 40.58 15.28%
4 IPC-4 04.02.2019 17.38 57.96 21.82%
5 IPC-5 10.03.2019 16.12 74.08 27.89%
6 IPC-6 12.05.2019 13.86 87.94 33.11%
7 IPC-7 19.07.2019 19.95 107.89 40.62%
8 IPC-8 04.10.2019 16.64 124.53 46.89%
8 IPC-9 06.12.2019 9.10 133.64 50.32%
Rehabilitation and Up gradation to two lane with paved shoulder from Km 531/775 to Km 598/450 (Kunkuri to CH/JH Border
Section) of NH-78 in the state of Chhattisgarh under NHDP-IV through Engineering, Procurement & Construction (EPC) basis
Page 26
19.1 PHYSICAL PROGRESS (1/3)
Cost
Physical Value of
Weightage Percentage Physical
Scope in Progress Physical
Componet percentag Stage of Payment of Progress
Km./Nos Till Date in Progress
e in weightage (%)
Km./Nos (%) (7x4)
Project (%)
1 2 3 4 5 6 7 8
A- Widening and reconstruction of existing road
Earthwork up to
10.640% 60.250 51.047 84.73% 9.01%
top of the sub-grade
Granular Work up to DLC & Shoulders
11.590% 60.250 47.560 78.94% 9.15%
PQC
53.530% 59.367 43.181 72.74% 38.94%
Widening, Repair of Culverts
0.070% 14 14.000 100.00% 0.07%
Roasd works
including approaches Widening,Repir of Minor Bridges
0.330% 10 9.000 90.00% 0.30%
to minor bridges,
underpassess, over Betuminuos Work
0.520% 0.883 0.000 0.00% 0.00%
passess, approaches 71.28%
to ROB/RUB/Major B- New 2-lane Realignments/Bypass
Bridges /Structures
(but excluding service Earthwork up to Subgrade
1.930% 5.910 2.870 48.56% 0.94%
roads)
Granular Work up to DLC & Shoulders
0.710% 5.910 2.510 42.47% 0.30%
PQC
5.280% 5.910 1.950 32.99% 1.74%
C- New Culverts, Minor Bridges & Major Bridges
Culverts Nos. 4.240% 91 86.000 94.51% 4.01%
Minor Bridges Nos.
11.160% 263.86 135.550 51.37% 5.73%
Rehabilitation and Up gradation to two lane with paved shoulder from Km 531/775 to Km 598/450 (Kunkuri to CH/JH Border
Section) of NH-78 in the state of Chhattisgarh under NHDP-IV through Engineering, Procurement & Construction (EPC) basis
Page 27
19.2 PHYSICAL PROGRESS (2/3)
Cost
Weight Physical
Percentag Value of
age Progress Physical
e of Scope in Physical
Component percentag Stage of Payment Till Date Progress
weight Km./Nos Progress
e in in (%)
age (%) (7x4)
Project Km./Nos
(%)
1 2 3 4 5 6 7 8
Foundation 0.00% 0
Sub-Structure 0.00% 0
Superstructure 0.00% 0
7.38%
(B) Major Bridge works and
New Major Bridges
ROB/RUB
Foundation 30.00% 259.2 107.5 41.47% 12.44%
Rehabilitation and Up gradation to two lane with paved shoulder from Km 531/775 to Km 598/450 (Kunkuri to CH/JH Border
Section) of NH-78 in the state of Chhattisgarh under NHDP-IV through Engineering, Procurement & Construction (EPC) basis
Page 28
19.3 PHYSICAL PROGRESS (3/3)
Cost
Weighta
Physical Value of
ge Percentage Physical
Scope in Progress Physical
Componet percent Stage of Payment of Progress
Km./Nos Till Date in Progress
age in weightage (%)
Km./Nos (%) (7x4)
Project
(%)
1 2 3 4 5 6 7 8
Service Roads 0.580% 0.250
Toll Plaza 7.590% 1.000
Road Side Drains 13.680% 10.340 4.860 47.00% 6.43%
Road signs,markings, km
7.810% 66.675
stones, safety devices
Bus Lay bye 2.960% 16.000
Truck Lay bye 4.170% 2.000
Rest Area 12.520% 1.000
Chequered Tiles 0.100% 20.680
Other Works 21.34% Protection Work
Metal Beam 2.320% 0.588
Steel Railing 3.910% 20.680
Retaining/Brest wall 23.260% 1.621 0.820 50.59% 11.77%
Safety and Traffic Mangaement
3.790% 4.000 3.000 75.00% 2.84%
Misc Item
Junctions 3.490% 15.000
C&G, Dismantling 13.610% 66.675 65.710 98.55% 13.41%
Turfing 0.210%
Total For Other Works (C) = 34.45%
Rehabilitation and Up gradation to two lane with paved shoulder from Km 531/775 to Km 598/450 (Kunkuri to CH/JH Border
Section) of NH-78 in the state of Chhattisgarh under NHDP-IV through Engineering, Procurement & Construction (EPC) basis
Page 29
20 PROJECT IMPLEMENTATIONS
Monthly Cumulative
MPR No. Letter No Letter Date Month under Report
Progress (%) Progress (%)
MPR -1 3018 20.02.2018 From June-17 to Jan-18 0.22% 0.22%
MPR -2 3020 04.03.2018 Feb-18 0.43% 0.65%
MPR -3 3031 06.04.2018 Mar-18 0.68% 1.33%
MPR -4 3064 07.05.2018 Apr-18 0.89% 2.22%
MPR -5 3078 09.06.2018 May-18 0.59% 2.81%
MPR - 6 3094 04.07.2018 Jun-18 0.30% 3.11%
MPR - 7 3143 10.10.2018 Jul-18 1.26% 4.37%
MPR - 8 3145 10.10.2018 Aug-18 0.62% 4.99%
MPR - 9 3150 11.10.2018 Sep-18 1.26% 6.25%
MPR - 10 3171 03.11.2018 Oct-18 2.73% 8.98%
MPR - 11 3179A 10.12.2018 Nov-18 2.67% 11.65%
MPR - 12 3192A 03.01.2019 Dec-18 3.79% 15.44%
MPR - 13 3200 31.01.2019 Jan-19 7.31% 22.75%
MPR - 14 3214 08.02.2019 Feb-19 3.82% 26.57%
MPR - 15 3214 06.03.2019 Mar-19 4.67% 31.24%
MPR - 16 3233 06.05.2019 April-19 2.71% 33.95%
MPR - 17 3245 25.05.2019 May-19 4.17% 38.12%
MPR - 18 3247 02.07.2019 Jun-19 5.64% 43.76%
MPR - 19 3257 13.08.2019 Jul-19 2.64% 46.20%
MPR - 20 3262 04.09.2019 Aug-19 2.93% 49.33%
MPR - 21 3270 03.10.2019 Sep-19 1.97% 51.30%
MPR - 22 3283 02.11.2019 Oct-19 0.89% 52.19
MPR - 23 3294 13.12.2019 Nov-19 1.58% 55.30
MPR - 24 3300 03.01.2020 Dec-20 3.00% 58.30
Rehabilitation and Up gradation to two lane with paved shoulder from Km 531/775 to Km 598/450 (Kunkuri to CH/JH Border
Section) of NH-78 in the state of Chhattisgarh under NHDP-IV through Engineering, Procurement & Construction (EPC) basis
Page 30
21.1 LAB REPORTS 1/3
MONTHLY PROGRESS REPORT UP TO NOVEMBER 2019
Rehabilitation and Upgradation to two lane with paved shoulders from Km 531/775 to Km 598/450 (kunkuri to CG/JH Border section) of NH-78 in
Project the state of Chhattishgarh under NHDP-IV through Engineering, Procurement & Construction (EPC) basis.
Client Chief Engineer, NH-Zone PWD, Raipur, Chhattishgarh
Authority Engineer Bloom Companies, LLC, USA
Contractor GAWAR S.C.C. (JV)
Test to be conducted (Lab / Field)
Opening Balance December Month Checked By AE. Upto Date
Name Of Test Frequency of tests MORTH CLAUSE
This Upto
Pass Fail Pass Fail Pass Fail
Month Date
LAB & FIELD TESTS
1.0 Test on Borrow/areas/OGL/Embankment/S.G MoRT&H Clause 903
1.1 Free Swell Index (FSI) 1 test /1500 m3 MORTH Clause 903 Cum 521 0 3 0 2 329 524 0
1.2 Proctor test (MDD Vs OMC) 1 test /1500 m3 MORTH Clause 903 Cum 525 0 3 0 2 355 528 0
1.3 Atterberg limits (LL & PI) 1 test /1500 m3 MORTH Clause 903 Cum 525 0 3 0 2 330 528 0
1.4 Gradation 1 test /1500 m3 MORTH Clause 903 Cum 525 0 3 0 2 327 528 0
1.5 CBR 1 test /3000 m3 MORTH Clause 903 Cum 336 0 3 0 2 213 339 0
1.6 Field Density (Emb. Layer) 1 test /3000 m2 MORTH Clause 903 Sqm 2,660 54 219 0 73 973 2,879 54
1.7 Field Density (Sub. Layer) 1 test /2000 m2 MORTH Clause 903 Sqm 4,122 59 57 0 14 1557 4,179 59
2.0 Tests on Granular Sub-Base Course (GSB)
2.1 Gradation 1 test /400 m3 MORTH Table no. 900.3 Cum 325 15 28 0 10 114 353 15
2.2 CBR Test As Required MORTH Table no. 900.3 Cum 28 0 1 0 1 13 29 0
2.3 LL/PL/PI 1 test /400 m3 MORTH Table no. 900.3 Cum 207 0 28 0 10 66 235 0
2.4 Field Moisture Content 1 test /400 m3 MORTH Table no. 900.3 Cum 1,058 16 277 0 83 530 1,335 16
2.5 Field Density 1 test /1000 m2 MORTH Table no. 900.3 Cum 1,210 24 277 0 83 626 1,487 24
4.2 specific gravity/ water absorption Table 1 (IS 2430) Clause 4.2.1 of IS 2430 MT 36 0 1 0 0 14 37 0
4.5 Total Soluble Sulphates and Chlorides As per score IRC SP-47 Profarma 1 MT 0 0 0 0 0 0 0 0
Rehabilitation and Up gradation to two lane with paved shoulder from Km 531/775 to Km 598/450 (Kunkuri to CH/JH Border
Section) of NH-78 in the state of Chhattisgarh under NHDP-IV through Engineering, Procurement & Construction (EPC) basis
Page 31
21.2 LAB REPORTS 2/3
5.0 Coarse Aggregate (For Concrete)
5.1 Grad/sieve analysis Table 1 (IS 2430) Clause 4.2.1 of IS 2430 MT 749 9 31 0 10 277 780 9
5.3 AIV Table 1 (IS 2430) Clause 4.2.1 of IS 2430 MT 527 0 31 0 10 233 558 0
5.4 Flakiness Index Table 1 (IS 2430) Clause 4.2.1 of IS 2430 MT 534 2 31 0 10 165 565 2
5.8 Test Solube Sulphates and Chlorides As per score IRC SP-47 Profarma 1 MT 8 0 0 0 0 2 8 0
6.1 Cube Test 7 days As Required MORTH Table- 1700.8 Cum 2,887 0 186 0 60 1034 3,073 0
6.2 Cube Test 28 days As Required MORTH Table- 1700.8 Cum 4,064 0 292 0 91 1704 4,356 0
7.1 Gradation One test for every day MORTH Table no. 900.6 MT 307 0 24 0 7 146 331 0
Workability of fresh concrete (Slump One Test For each Dumper Load
7.4 MORTH Table no. 900.6 MT 17699 0 810 0 243 5691 18,509 0
Test) of Both Batching plant & Site
7.5 Flexural Strength 7 days 2 Beams per 150 cu.m MORTH Table no. 900.6 Cum 336 0 14 0 6 150 350 0
7.6 Flexural Strength 28days 2 Beams per 150 cu.m MORTH Table no. 900.6 Cum 704 0 11 0 7 347 715 0
7.7 Strength Of Concrete Cube 7 Days 2 Cube per 150 cu.m MORTH Table no. 900.6 Cum 357 0 14 0 9 200 371 0
7.8 Strength Of Concrete Cube 28 Days 2 Cube per 150 cu.m MORTH Table no. 900.6 Cum 725 0 11 0 9 420 736 0
Rehabilitation and Up gradation to two lane with paved shoulder from Km 531/775 to Km 598/450 (Kunkuri to CH/JH Border
Section) of NH-78 in the state of Chhattisgarh under NHDP-IV through Engineering, Procurement & Construction (EPC) basis
21.3 LAB REPORTS 3/3 Page 32
8.0 Dry Lean Concrete
8.1 Field Density 3 test /2000 m2 MORTH Table- 905.1.2 Sqm 1,147 6 146 0 45 570 1,293 6
8.2 Gradation 1 test for every day MORTH Table- 600-1 Cum 264 1 17 0 5 99 281 1
8.3 AIV 1 test for each source As per IS : 383-1970 Cum 256 0 17 0 5 91 273 0
8.4 Flakiness Index 1 test for each source Cum 251 0 17 0 5 86 268 0
8.5 Strength Of Concrete Cube 7 Days Cum 884 0 69 0 28 404 953 0
9.0 Water
9.1 PH Value New Source/ Thrice a year 1 test per source change 3 0 0 0 0 0 3 0
9.2 Objectionable maters New Source/ Thrice a year 1 test per source change 0 0 0 0 0 0 0 0
9.3 acidity New Source/ Thrice a year 1 test per source change 3 0 0 0 0 0 3 0
9.4 Alkalinity New Source/ Thrice a year 1 test per source change 3 0 0 0 0 0 3 0
9.5 Organic/inorganic Solids New Source/ Thrice a year 1 test per source change 3 0 0 0 0 0 3 0
10.0 Cement
10.1 Fineness 2 Test per Lot/ Batch Table-2 IS 3535 MT 736 0 40 0 12 244 776 0
10.2 Consistancy 2 Test per Lot/ Batch Table-2 IS 3535 MT 758 0 40 0 12 232 798 0
10.3 I.S.T. & F.S.T 2 Test per Lot/ Batch Table-2 IS 3535 MT 649 0 40 0 12 199 689 0
10.4 Soundness 2 Test per Lot/ Batch Table-2 IS 3535 MT 797 0 40 0 12 244 837 0
10.5 Cube test (3 days) 2 Test per Lot/ Batch Table-2 IS 3535 MT 964 0 36 0 11 294 1,000 0
10.6 Cube Test (7 days) 2 Test per Lot/ Batch Table-2 IS 3535 MT 1,032 0 31 0 16 374 1,063 0
10.7 Cube Test (28 days) 2 Test per Lot/ Batch Table-2 IS 3535 MT 930 0 28 0 14 345 958 0
10.8 Chemical Testing 2 Test per Lot/ Batch Table-2 IS 3535 MT 0 0 0 0 0 0 0 0
11.0 FLYASH
11.1 Fineness 2 Test per Lot/ Batch IS: 1727 -1967 Cl. 6 MT 273 0 15 0 5 85 288 0
11.2 Cube test (3 days) 2 Test per Lot/ Batch IS: 1727 -1967 Cl. 10 MT 321 0 12 0 4 119 333 0
11.3 Cube Test (7 days) 2 Test per Lot/ Batch IS: 1727 -1967 Cl. 10 MT 284 0 10 0 3 105 294 0
11.4 Cube Test (28 days) 2 Test per Lot/ Batch IS: 1727 -1967 Cl. 10 MT 235 0 6 0 2 84 241 0
11.5 Specific Gravity 2 Test per Lot/ Batch IS: 1727 -1967 Cl. 15 MT 21 0 1 0 1 6 22 0
12.0 Admixture
12.1 Dry Material Content 1 Test per Batch 1 test per batch/9000 liter MT 6 0 0 0 0 1 6 0
12.2 Ash Content 1 Test per Batch 1 test per batch/9000 liter MT 6 0 0 0 0 1 6 0
12.3 Relative Density 1 Test per Batch 1 test per batch/9000 liter MT 6 0 0 0 0 1 6 0
12.4 Chloride ion Content 1 Test per Batch 1 test per batch/9000 liter MT 6 0 0 0 0 1 6 0
12.5 pH 1 Test per Batch 1 test per batch/9000 liter MT 6 0 0 0 0 1 6 0
13.0 STEEL Third party test (Chemical/Physical)
13.1 Carbon 1 Test per Batch ASTM-E-415 MT 25 0 5 0 0 0 30 0
13.2 Sulphur 1 Test per Batch ASTM-E-415 MT 25 0 5 0 0 0 30 0
13.3 Phosphorus 1 Test per Batch ASTM-E-415 MT 25 0 5 0 0 0 30 0
13.4 Sulphur + Phosphorus 1 Test per Batch ASTM-E-415 MT 25 0 5 0 0 0 30 0
13.5 Tensile Strenght N/mm2 1 Test per Batch Is:1608(Part-1) MT 38 0 5 0 0 0 43 0
13.6 Yield Stress N/mm2 1 Test per Batch Is:1608(Part-1) MT 38 0 5 0 0 0 43 0
13.7 T/S/YS Ratio 1 Test per Batch MT 38 0 5 0 0 0 43 0
13.8 Elongation % 1 Test per Batch Is:1608(Part-1) MT 38 0 5 0 0 0 43 0
13.9 Bend Test 1 Test per Batch Is:1599-2012 MT 38 0 5 0 0 0 43 0
14.0 Re-Bend Test 1 Test per Batch Is:1599-2012 MT 38 0 5 0 0 0 43 0
14.1 Mass Per Meter run(kg)* 1 Test per Batch Is:1786-2008 MT 38 0 5 0 0 0 43 0
14.2 Rib Area (mm2/mm /length) 1 Test per Batch Is:1786-2008 MT 38 0 5 0 0 0 43 0
Rehabilitation and Up gradation to two lane with paved shoulder from Km 531/775 to Km 598/450 (Kunkuri to CH/JH Border
Section) of NH-78 in the state of Chhattisgarh under NHDP-IV through Engineering, Procurement & Construction (EPC) basis
22 WEATHER REPORT Page 33
WEA THER R EP O R T
Sl Ja shp ku n ku Du ld u l
Mo n th Da te Ra in (mm) Da te Ra in (mm) Da te Ra in (mm)
No ur ri a
1 ##### 0 0 0
2 ##### 0 0 0
3 ##### 0 0 0
4 ##### 0 0 0
5 ##### 6 2 8 ,2 9 5 ,1 3 4 .6 2 8 ,2 9 2 5 .4 ,9 .2 0
15 . 3 , 7 . 5 , 9 . 1, 19 . 0 , 12 . 4 , 2 5 . 0 ,
4 0 , 9 , 14 . 3 , 3 3 ,
2 , 3 , 4 , 7 , 9 , 10 , 15 . 5 , 2 . 2 , 3 . 8 , 2 , 3 , 4 , 9 , 11, 12 , 1 4 8 .8 , 3 .0 , 2 9 .0 , 2 , 4 , 9 , 12 , 13 , 1
10 , 2 7 , 2 8 . 4 ,
6 ##### 16 9 11, 12 , 14 , 2 2 , 1. 8 , 2 4 . 2 , 3 . 2 , 342 4 ,2 2 ,2 3 ,2 6 ,2 7 19 . 6 , 18 . 2 , 12 . 2 , 2 9 8 .6 4 ,2 2 ,2 4 ,2 6 ,
13 , 7 7 , 19 . 3 ,
2 3 ,2 4 ,2 6 ,2 7 2 . 6 , 4 . 4 , 11. 1, ,2 8 ,2 9 7 4 .2 , 4 2 .2 , 3 2 .0 , 2 7 ,2 8 ,2 9
2 3 .3 , 4 .3
6 0 .0 , 8 .6 , 6 .0
2 7 , 13 , 2 6 , 2 . 2 , 4 7 . 4 , 16 . 4 , 0 . 8 ,
2, 3, 4, 5, 7,
2 , 4 .7 , 3 .8 , 3 5 , 2 , 4 , 5 , 8 , 10 , 5 . 4 , 12 . 4 , 19 . 2 , 2 , 7 , 8 , 10 , 11, 2 7 , 15 , 12 , 3 . 2 ,
10 , 11, 13 , 14 ,
2 . 6 , 15 , 7 6 . 5 , 11, 13 , 14 , 15 , 3 3 .2 , 6 8 .2 , 4 .0 , 14 , 15 , 17 , 18 , 4 . 3 , 2 9 . 3 , 18 ,
16 , 17 , 18 , 19 ,
7 J u l- 18 5 12 3 8 , 15 , 6 . 1, 15 . 9 , 450 17 , 18 , 19 , 2 0 , 14 . 8 , 4 4 . 4 , 2 4 . 4 , 4 4 0 .3 19 , 2 0 , 2 2 , 4 1. 2 , 2 7 , 2 . 3 ,
20, 22, 23, 24,
6 5 ,2 4 , 2 8 .3 , 2 1, 2 2 , 2 3 , 2 4 , 4 . 6 , 1, 12 . 4 , 8 2 , 23, 24, 25, 5 2 , 18 , 7 5 , 2 ,
25, 26, 27, 29,
8 6 . 2 , 15 . 3 , 3 . 2 , 25, 26, 27, 31 5 .6 , 7 .8 , 3 7 .8 , 7 .2 , 26, 29, 30 2 , 10 5 , 4 , 3
30
7 .2 1. 2
6 . 2 , 12 . 9 , 9 . 8 , 1,
1, 2 , 3 , 4 , 6 , 8 , 1, 2 , 3 , 8 , 9 , 13 , 1, 2 5 , 3 . 2 , 2 5 , 7 , 2 , 3 , 8 , 9 , 14 , 12 , 5 . 3 , 2 3 , 1,
0 .6 , 3 2 , 8 .9 ,
9 , 13 , 14 , 15 , 14 , 17 , 18 , 19 , 3 9 , 2 9 . 8 , 14 . 2 , 2 . 4 , 16 , 17 , 2 0 , 15 . 4 , 2 . 1, 2 1. 3 ,
2 2 . 4 , 12 . 2 , 7 . 2 ,
8 ##### 252 18 , 2 0 , 2 1, 2 6 , 283 2 0 , 2 1, 2 2 , 2 4 , 15 . 4 , . 5 7 . 2 , 7 . 6 , 11, 16 2 . 3 2 1, 2 4 , 2 5 , 11. 2 , 4 . 4 , 7 . 3 ,
10 . 6 , 7 . 8 , 2 9 . 6 ,
27, 28, 29, 30, 26, 27, 28, 29, 2 . 4 , 18 . 8 , 9 , 6 . 4 , 26, 27, 28, 2 . 1, 1. 1, 4 0 , 10 ,
9 . 3 , 6 0 , 10 , 5 . 6 ,
31 30, 31 4 . 8 , 2 . 6 , 1. 6 30 6 .1
4 .9 , 0 .6
0 .9 , 4 0 .4 , 4 .8 ,
1, 2 , 3 , 6 , 7 , 8 , 2 4 . 8 , 8 9 , 10 , 1, 3 3 , 6 6 , 3 . 1,
6 0 . 4 , 4 4 . 6 , 18 . 2 , 1, 2 , 3 , 5 , 6 , 7 , 1, 2 , 3 , 6 , 7 ,
9 ##### 240 11, 14 , 16 , 2 1, 240 11. 4 , 2 8 . 8 , 17 . 4 , 17 9 . 6 8 . 3 , 4 9 , 11, 1. 2 ,
3 1, 11. 6 , 16 . 2 , 1, 8 , 14 , 18 8 , 14 , 2 3
22, 23, 5 .6 , 2 .4 , 8
10 , 0 . 4
10 ##### 0 0 2 .3 14 2 .3
11 ##### 0 0 6 23 6
12 ##### 57 17 , 18 8 . 1, 4 8 . 9 48 17 , 18 , 19 8 . 4 , 3 8 . 4 , 1. 2 2 1. 6 17 , 18 2 . 3 , 19 . 3
13 ##### 0 4 .2 27 4 .2 1. 7 26 1. 7
0 . 5 , 15 . 1, 1. 3 ,
14 ##### 2 7 .1 9 , 16 , 2 3 , 2 5 5 0 .2 16 , 2 5 12 , 3 8 . 2 2 0 .6 9 , 16 , 2 5 2 . 4 , 14 , 4 . 2
10 . 2
15 ##### 2 1. 1 4 , 16 , 18 1. 2 , 13 . 8 , 6 . 1, 2 6 .4 4 , 16 , 18 8 . 4 , 10 . 0 , 8 . 0 , 7 .4 16 , 18 .2 , 7 .2
3 , 12 . 4 , 2 5 , 10 , 8 . 2 , 5 . 4 , 1. 0 ,
16 ##### 6 8 .8 8 , 19 , 2 0 9 .5 , 3 2 .5 , 2 6 .8 10 9 1, 8 , 19 , 2 0 , 2 2 17 . 8 8 , 19 , 2 0 , 2 2
5 8 .6 3 .2 0
17 ##### 2 4 .9 1 2 4 .9 0 0
6 . 2 , 10 . 4 , 9 . 8 , 12 .
1, 3 , 13 , 16 , 17 , 18 4 , 16 , 17 , 19 , 2 0 , 10 . 2 , 3 . 6 , 5 . , 7 . 4 , 1. 6
3 , 10 . 4 , . 9 , 1. 2 , 6 7 . 3 . 0 , 19 . 3 , 2 2 . 3 , 1
18 ##### 240 ,2 0 ,2 2 ,2 3 ,9 .8 , 233 2 2 ,2 3 ,2 4 ,2 7 ,2 ,6 3 .8 ,2 4 .6 ,7 ,6 7 ,4 5 5 .6 1, 2 2 , 2 7 , 2 8
8 , 2 0 . 5 , 9 . 8 , 9 0 . 1, 1. 0 ,
2 7 ,2 8 ,2 9 8 ,2 9 , 2 . 2 , 1,
.5 ,.2 ,
1. 2 , 11. 7 , 2 5 . 9 , 4 . 9
1, 2 , 3 , 4 , 5 , 6 , 7 , 8 2 . 8 , 13 . 8 , 3 1. 6 , 3 . 2 , 1
1, 2 , 3 , 4 , 5 , 6 , 7 , 8 , 0 . 2 , 3 9 . 1, 5 4 . 2 , 6 1, 2 , 3 , 4 , 6 , 7 , 8 4 2 . 3 , 11, 15 , 2 . 3 ,
, 9 , 10 , 11, 12 , 13 , 1 . 6 , 12 , 4 0 , 3 . 2 , 2 5 . 8 ,
, 9 , 10 , 11, 12 , 13 , 1 . 8 , 10 1. 2 , 3 . 8 , 3 9 . , 9 , 10 , 11, 13 , 19 9 , 2 5 , 4 . 3 , 12 . 2 ,
19 J u l- 19 407 272 4 , 16 , 18 , 2 0 , , 2 5 , 12 . 6 , 16 , 3 , 13 , 3 . 6 , 7 . 2 2 0 .6
9 ,2 5 ,2 7 ,2 8 ,2 9 6 , 0 . 6 , 0 . 1, 2 , 2 3 , 1 ,2 5 ,2 7 ,2 8 ,2 5 , 3 6 . 2 , 4 , 17 , 4 , 1
2 7 ,2 8 ,2 9 ,3 0 ,3 8 , 1. 8 , 1, 2 7 . 4 , 16 . 6 , 9
,3 0 ,3 1 4 . 9 , 4 . 8 , 12 . 3 , 3 0 . 9 ,3 0 ,3 1 2 ,6 .3 ,3 ,5 ,7
1 . 2 , 4 , 8 , 14
5 ,3 0 .3
5 .1,2 8 .3 ,8 .9 ,6 .2 ,2 7 .1
1,6 ,7 ,8 ,9 ,11,12 ,13 ,1 1,2 ,3 ,6 ,7 ,8 ,9 ,10 ,11,1 4 .8 ,4 .,1.4 ,13 .4 ,11.2 ,6 ,13 . 1,3 ,6 ,7 ,8 ,9 ,10 ,11, 1.2 ,1.,1.2 ,3 ,9 .3 ,12 ,1,
,2 5 .,0 .5 ,0 .3 ,5 0 .8 ,7 .1,
4 ,15 ,18 ,19 ,2 0 ,2 1,2 3 ,14 ,15 ,16 ,18 ,19 ,2 0 8 ,3 .8 ,5 .6 ,5 ,9 0 .4 ,10 ,12 , 13 ,14 , 4 5 ,1
20 A u g -19 3 3 4 .8 15 .0 ,5 2 .0 ,0 .5 ,3 .1,1.9 , 4 2 6 .8 2 5 2 .8
2 ,2 4 ,2 5 ,2 6 ,2 7 ,2 9 , ,2 1,2 2 ,2 4 ,2 5 ,2 6 ,2 2 .2 ,3 2 .4 ,3 .4 ,3 .6 ,1.2 ,2 4 . 16 ,18 ,19 ,2 0 ,2 4 ,2 ,6 2 ,8 .3 ,2 ,4 0 ,2 .2 ,7 .
3 .1,4 .0 ,3 .9 ,3 8 ,4 2 .10 ,
3 0 ,3 1 7 ,2 8 ,2 9 4 ,4 5 ,6 .2 ,8 .,2 1.8 ,9 7 .2 5 ,2 6 ,2 7 ,2 9 , 2 ,2 0 ,2 , 12 ,2 2 .4 ,
8 .2 ,3 .7
8 .2 ,0 .9 ,1.2 ,12 ,2 .1,1.9 , 3 ,4 ,5 ,6 ,8 ,9 ,10 ,11,12 15 .8 ,2 .2 ,5 ,6 .8 ,3 ,14 .4 ,2 1,2 ,3 ,4 ,5 ,6 ,8 ,9 ,1 1,2 .2 ,10 ,3 .3 ,5 ,2 ,4 ,1
1,2 ,4 ,6 ,7 ,8 ,9 ,10 ,11,
11.6 ,14 .2 ,1.3 ,2 7 .9 ,3 9 . ,13 ,14 ,17 ,2 1,2 3 ,2 4 , 4 ,3 0 .4 ,3 1.2 ,2 9 ,2 ,4 .4 ,7 , 0 ,11,12 ,13 ,14 ,2 4 , 0 .1,8 ,11.2 ,3 0 .3 ,9 7 ,1
21 S e p -19 386 12 ,13 ,14 ,2 4 ,2 5 ,2 6 , 664 454
7 ,1.2 ,7 ,2 6 .2 ,16 .4 ,110 . 2 5 ,2 6 ,2 7 ,2 8 ,2 9 ,3 2 .2 ,3 ,17 ,2 8 .4 ,6 2 .2 ,2 7 , 2 5 ,2 6 ,2 7 ,2 8 ,2 9 ,1,10 ,10 ,8 5 ,3 2 ,9 7 ,2
2 7 ,2 8 ,2 9 ,3 0
2 ,11.4 ,7 3 5 ,19 .1 0 7 5 .6 ,17 .6 ,3 0 4
18 .7 ,1.5 ,0 .5 ,2 3 ,14 .3 ,1
1,2 ,3 ,6 ,7 ,8 ,,10 ,1,2 1, 1,6 ,7 ,8 ,9 ,10 ,19 ,2 1,2 4 8 ,17 .4 ,3 .8 ,14 ,9 ,1,2 0 ,2 1,3 ,6 ,7 ,8 ,10 ,12 ,1 10 5 ,6 .3 ,14 ,15 ,13 ,4 .
22 O c t -19 17 3 .8 .3 ,1.5 ,0 .9 ,2 .9 ,2 4 .2 ,5 209 2 4 2 .2
2 4 ,2 5 4 ,2 5 2 .4 ,4 8 .4 ,2 5 9 ,2 1,2 4 ,2 5 3 ,19 .3 ,18 ,8 ,2 0 ,19 .3
7 .2 ,2 7 .8
23 O c t -19 0 0 0
Rehabilitation and Up gradation to two lane with paved shoulder from Km 531/775 to Km 598/450 (Kunkuri to CH/JH Border
Section) of NH-78 in the state of Chhattisgarh under NHDP-IV through Engineering, Procurement & Construction (EPC) basis
23.1 Progress of work – Photographs 1/2 Page 34
598+340 598+340
598+340 598+340
Rehabilitation and Up gradation to two lane with paved shoulder from Km 531/775 to Km 598/450 (Kunkuri to CH/JH Border
Section) of NH-78 in the state of Chhattisgarh under NHDP-IV through Engineering, Procurement & Construction (EPC) basis
23.2 Progress of work – Photographs 2/2 Page 35
Rehabilitation and Up gradation to two lane with paved shoulder from Km 531/775 to Km 598/450 (Kunkuri to CH/JH Border Section) of NH-78
in the state of Chhattisgarh under NHDP-IV through Engineering, Procurement & Construction (EPC) basis
Page 36
24 KEY CONSTRAINTS
GSB
SUB
GSB
SUB
SUB
GSB
GSB
SUB
SUB
GSB
GSB
SUB
SUB
GSB
GSB
SUB
SUB
GSB
GSB
SUB
SUB
GSB
PQC
PQC
PQC
PQC
PQC
PQC
PQC
PQC
PQC
PQC
PQC
C&G
C&G
C&G
C&G
C&G
C&G
C&G
C&G
C&G
C&G
C&G
CH CH CH CH CH CH
0
0
0
0
0
0
0
0
0
0
0
0
C&G LHS
SUB LHS
GSB LHS
DLC LHS
PQC LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS 0 LHS RHS 0 LHS RHS 0 LHS RHS 0 LHS RHS 0 LHS RHS 0 LHS
536010 535010 534010 533010 532010 531010
536020 535020 534020 533020 532020 531020
1612
1629
1665
536030 535030 534030 533030 532030 531030
536040 535040 534040 533040 532040 531040
536050 535050 534050 533050 532050 531050
536060 535060 534060 533060 532060 531060
1908 - 11.10.2018
1930 - 13.10.2018
1082 - 15.05.2018
536070 535070 534070 533070 532070 531070
3077-30.01.2019
1668-23.09.2018
3113-03.02.2019
2330 - 27.11.2018
1691 - 25.09.2018
536080 535080 534080 533080 532080 531080
3187-12.02.2019
536090 535090 534090 533090 532090 531090
1877 - 20.04.2018
536100 535100 534100 533100 532100 531100
2287 - 23.11.2018
3163-08.02.2019
536110 535110 534110 533110 532110 531110
536120 535120 534120 533120 532120 531120
2272 - 21.11.2018
1999-20.10.2018
3080-31.01.2019
3042-28.01.2019
536130 535130 534130 533130 532130 531130
1747 - 29.09.2018
2854-09.01.2019
2084 - 27.10.2018
536140 535140 534140 533140 532140 531140
3276-2302.20109
1746 - 29.09.2018
536150 535150 534150 533150 532150 531150
3168-09.02.2019
3091-01.02.2019
3076-30.01.2019
2070 - 25.10.2018
2112-29.10.2018
3070-30.01.2019
531 - 23.04.2018
1932 - 13.10.2018
1638 - 21.09.2018
536180 535180 534180 533180 532180 531180
2942-17.01.2019
536190 535190 534190 533190 532190 531190
1690-25.09.2018
1977-17.10.18
3144-05.02.2019
3033-27.01.2019
536210 535210 534210 533210 532210 531210
1847 - 06.10.2018
536220 535220 534220 533220 532220 531220
3072-30.01.2019
2015-22.10.2018
2841-08.01.2019
1185 - 04.06.2018
536230 535230 534230 533230 532230 531230
2333 - 28.11.2018
536240 535240 534240 533240 532240 531240
536250 535250 534250 533250 532250 531250
3081-31.01.2019
1652 - 22.09.2018
25-1 STRIP CHART
3179-10.02.2019
536270 535270 534270 533270 532270 531270
3057-30.01.2019
3156-07.02.2019
5012 - 19.12.19
4980 - 13.12.19
536300 535300 534300 533300 532300 531300
3282-24.02.2019
536310 535310 534310 533310 532310 531310
4979 - 13.12.19
2986-22.01.2019 4978 - 13.12.19
1876 - 08.10.2018
536320 535320 534320 533320 532320 531320
2792-04.01.2019
1932a
2112a
536330 535330 534330 533330 532330 531330
2311 - 25.11.2018
536340 535340 534340 533340 532340 531340
3119-04.02.2019
4983 - 13.12.19
4982 - 13.12.19
4981 - 13.12.19
1897 - 10.10.2018
536370 535370 534370 533370 532370 531370
536380 535380 534380 533380 532380 531380
1081 - 15.05.2018
2942a-17.01.2019
536390 535390 534390 533390 532390 531390
536400 535400 534400 533400 532400 531400
536410 535410 534410 533410 532410 531410
536420 535420 534420 533420 532420 531420
3200-13.02.2019
1848 - 06.10.2018
536430 535430 534430 533430 532430 531430
536440 535440 534440 533440 532440 531440
536450 535450 534450 533450 532450 531450
536460 535460 534460 533460 532460 531460
536470 535470 534470 533470 532470 531470
2854-09.01.2019
3182-11.02.2019
70 -01.04.2018
70 -01.04.2018
70 -01.04.2018
70 -01.04.2018
70 -01.04.2018
70 -01.04.2018
70 -01.04.2018
70 -01.04.2018
296 -11.04.2018
296 -11.04.2018
536530 535530 534530 533530 532530 531530
536540 535540 534540 533540 532540 531540
2932A
2112A
2156 - 02.11.2018
1712-26.09.18
3071-30.01.2019
2929-16.01.2019
2865.10.01.2019
845 - 08.05.2018
1861
70 -01.04.2018
70 -01.04.2018
882 - 09.05.2018
2015-22.10.2018
Section) of NH-78 in the state of Chhattisgarh under NHDP-IV through Engineering, Procurement & Construction (EPC) basis
3072-30.01.2019
1931 - 13.10.2018
2029 - 22.10.2018
2330 - 27.11.2018
2854-09.01.2019
1932 - 13.10.2018
1185 - 04.06.2018
1908 - 11.10.2018
1930 - 13.10.2018
1082 - 15.05.2018
GSB
SUB
SUB
GSB
GSB
SUB
SUB
GSB
GSB
SUB
SUB
GSB
GSB
SUB
SUB
GSB
GSB
SUB
SUB
GSB
GSB
SUB
SUB
GSB
PQC
PQC
PQC
PQC
PQC
PQC
PQC
PQC
PQC
PQC
PQC
PQC
C&G
C&G
C&G
C&G
C&G
C&G
C&G
C&G
C&G
C&G
C&G
C&G
CH CH CH CH CH CH
0
0
0
0
0
0
0
0
0
0
0
0
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS 0 LHS RHS 0 LHS RHS 0 LHS RHS 0 LHS RHS 0 LHS RHS 0 LHS
.
542010 541010 540010 539010 538010 537010
2354
2355
542020 541020 540020 539020 538020 537020
542030 541030 540030 539030 538030 537030
542040 541040 540040 539040 538040 537040
542050 541050 540050 539050 538050 537050
3209-14.02.2019
542060 541060 540060 539060 538060 537060
3311-28.02.2019
542070 541070 540070 539070 538070 537070
2345-29.11.2018
2374 - 02.12.2018
2158 - 02.11.2018
2095-29.10.2018
542080 541080 540080 539080 538080 537080
2428 - 06.12.2018
3291-25.02.2019
542090 541090 540090 539090 538090 537090
3239-18.02.2019
542100 541100 540100 539100 538100 537100
2185 - 03.11.2018
2043 - 24.10.2018
2364 - 01.12.2018
886 - 09.05.2018
542110 541110 540110 539110 538110 537110
2410-03.12.2018
2006 - 21.10.2018
2627 - 23.12.2018
2399 - 03.12.2018
542120 541120 540120 539120 538120 537120
3271-22.02.2019
3261-20.02.2019
3254-20.02.2019
3190-12.02.2019
542130 541130 540130 539130 538130 537130
2246-14.11.2018
542140 541140 540140 539140 538140 537140
3344-04.03.2019
539 - 24.04.2018
2040 - 24.10.2018
3376-06.03.2019
3225-15.02.2019
2229-09.11.2018
2194 - 04.11.2018
3222-15.02.2019
3179-10.02.2019
2587 - 19.12.2018
3128-05.02.2019
646 - 02.05.2018
25-2 STRIP CHART
2265-18.11.2018
542270 541270 540270 539270 538270 537270
3417-08.03.2019
3374-05.03.2019
3212-12.02.2019
3068-30.01.2019
3067-30.01.2019
2718 - 30.12.2018
2397 - 03.12.2018
3340-03.03.2019
2059 - 25.10.2018
3297-22.02.2019
2057 - 25.10.2018
542300 541300 540300 539300 538300 537300
2654 - 24.12.2018
542310 541310 540310 539310 538310 537310
2234-28.11.2018
1948 - 14.10.2018
2615 - 22.12.2018
2365-01.12.2018
542330 541330 540330 539330 538330 537330
2033 - 23.10.2018
542340 541340 540340 539340 538340 537340
3337-03.03.2019
542350 541350 540350 539350 538350 537350
542360 541360 540360 539360 538360 537360
542370 541370 540370 539370 538370 537370
1927-12.10.2018
1927-12.10.2018
2007 - 21.10.2018
2231-10.11.2018
3315-28.02.2019
542440 541440 540440 539440 538440 537440
542450 541450 540450 539450 538450 537450
3207-14.02.2019
3207-14.02.2019
2255 - 16.11.2018
3336-03.03.2019
3201-13.02.2019
2225-06.11.2018
3321-01.03.2019
2398 - 03.12.2018
3314-28.02.2019
542500 541500 540500 539500 538500 537500
542510 541510 540510 539510 538510 537510
542520 541520 540520 539520 538520 537520
28 -16.04.2018
28 -16.04.2018
28 -16.04.2018
28 -16.04.2018
3339-03.03.2019
2332-27.11.2018
296 -11.04.2018
296 -11.04.2018
296 -11.04.2018
296 -11.04.2018
296 -11.04.2018
296 -11.04.2018
29 -16.01.2018
29 -16.01.2018
3225-15.02.2019
3069-30.01.2019
3068-30.01.2019
2204 - 05.11.2018
2232 - 10.11.2018
2184 - 03.11.2018
3207-14.02.2019
2704 - 29.12.2018
2034 - 23.10.2018
2058 - 25.10.2018
2185 - 03.11.2018
2374 - 02.12.2018
2399 - 03.12.2018
2615 - 22.12.2018
2042 - 24.10.2018
2194 - 04.11.2018
3311-28.02.2019
2587 - 19.12.2018
GSB
SUB
SUB
GSB
GSB
SUB
SUB
GSB
GSB
SUB
SUB
GSB
GSB
SUB
SUB
GSB
GSB
SUB
SUB
GSB
GSB
SUB
SUB
GSB
PQC
PQC
PQC
PQC
PQC
PQC
PQC
PQC
PQC
PQC
PQC
PQC
C&G
C&G
C&G
C&G
C&G
C&G
C&G
C&G
C&G
C&G
C&G
C&G
CH CH CH CH CH CH
0
0
0
0
0
0
0
0
0
0
0
0
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS 0 LHS RHS 0 LHS RHS 0 LHS RHS 0 LHS RHS 0 LHS RHS 0 LHS
548010 547010 546010 545010 544010 543010
548020 547020 546020 545020 544020 543020
2814
1478
548030 547030 546030 545030 544030 543030
2948
548040 547040 546040 545040 544040 543040
548050 547050 546050 545050 544050 543050
1564 - 31.08.2018
548060 547060 546060 545060 544060 543060
548070 547070 546070 545070 544070 543070
2535-15.12.2018
2458 - 09.12.2018
1332 - 03.07.2018
548080 547080 546080 545080 544080 543080
1358-10.07.2018
1618 - 15.09.2018
548090 547090 546090 545090 544090 543090
1574 - 10.09.2018
1137 - 21.05.2018
1085 - 15.05.2018
548100 547100 546100 545100 544100 543100
2912-15.01.2019
1483-06.08.2018
548110 547110 546110 545110 544110 543110
548120 547120 546120 545120 544120 543120
1544 - 23.08.2018
1541-22.08.2018
1380-16.07.2018
2494 - 12.12.2018
1539 - 21.08.2018
1366 - 12.07.2018
1368 - 13.07.2018
1570 - 05.09.2018
548130 547130 546130 545130 544130 2774-02.01.2019 543130
548140 547140 546140 545140 544140 543140
548150 547150 546150 545150 544150 543150
3448-11.03.2019
3283-24.02.2019
3267-21.02.2019
1351 - 08.07.2018
548160 547160 546160 545160 544160 543160
548170 547170 546170 545170 544170 543170
2579-18.12.2018
1565 - 02.09.2018
548180 547180 546180 545180 544180 543180
3243-18.02.2019
548190 547190 546190 545190 544190 543190
1569 - 05.09.2018
2357 - 30.11.2018
1337 - 04.07.2018
2739-31.12.2018
548210 547210 546210 545210 544210 543210
1359-11.07.2018
548220 547220 546220 545220 544220 543220
1537 -21.08.2018
548230 547230 546230 545230 544230 543230
548240 547240 546240 545240 544240 543240
1536 -20.08.2018
1489
2511-13.12.2018
2702-29.12.2018
2863-10.01.2019
1385-17.07.2018
1319-01.07.2018
2839-08.01.2019
25-3 STRIP CHART
2346 - 29.11.2018
2670 - 26.12.2018
1148 - 25.05.2018
1136 - 21.05.2018
548280 547280 546280 545280 544280 543280
1618 - 19.09.2018
548290 547290 546290 545290 544290 543290
548300 547300 546300 545300 544300 543300
1550-24.08.2018
1330-02.07.18
2958-19.01.2019
1484-06-08-2018
1552 - 25.08.2018
1481 - 05.08.2018
548330 547330 546330 545330 544330 543330
2789-03.01.2018
2761-01.01.2019
1495 - 11.08.2018
1582 - 12.09.2018
548350 547350 546350 545350 544350 543350
1508 - 13.08.2018
1511 - 14.08.2018
1513-16.08.2018
2495 - 12.12.2018
2888-12.01.2020
2658 - 25.12.2018
548380 547380 546380 545380 544380 543380
2679-27.12.2018
2580-18.12.2018
1484a
2522-14.12.2018
1340-04.07.18
1394-20.07.2018
2656-25.12.2018
2740-31.12.2018
2468- 1012.2018
2471 - 10.12.2018
NCR NO 4
NCR NO 4
NCR NO 4
NCR NO 4
548470 547470 546470 545470 544470 543470
1512-16.08.2018
1379 - 16.07.2018
1391 - 20.07.2018
47 - 23.01.2018
47 - 23.01.2018
32 - 17.01.2018
32 - 17.01.2018
32 - 17.01.2018
32 - 17.01.2018
30 - 16.01.2018
30 - 16.01.2018
30 - 16.01.2018
30 - 16.01.2018
29 - 16.01.2018
29 - 16.01.2018
2771-01.01.2019
548600 547600 546600 545600 544600 543600
548610 547610 546610 545610 544610 543610
1510-14.08.2018
1186 - 05.06.2018
1086 - 21.05.2018
2512 - 13.12.2018
548630 547630 546630 545630 544630 543630
1550 -24.08.2018
1138 - 23.05.2018
2470 - 10.12.2018
1504 - 12.8.2018
2496 - 12.12.2018
1149 - 25.05.2018
2908-14.01.2019
2706 - 29.12.2018
1134 - 21.05.2018
2964-20.01.2019
2948-18.01.2019
1347 - 07.07.2018
1839 - 05.10.2018
1479 - 05.08.2018
2497
1529 - 20.08.2018
2494 - 12.12.2018
2670 - 26.12.2018
1123 - 18.05.2018
2702-29.12.2018
3448-11.03.2019
1735-28.09.2018
1351 - 08.07.2018
Section) of NH-78 in the state of Chhattisgarh under NHDP-IV through Engineering, Procurement & Construction (EPC) basis
2963-20.01.2019
Rehabilitation and Up gradation to two lane with paved shoulder from Km 531/775 to Km 598/450 (Kunkuri to CH/JH Border
2458 - 09.12.2018
2658 - 25.12.2018
1361 - 11.07.2018
1368 - 13.07.2018
1085 -15.05.2018
1137 - 21.05.2018
1570 - 05.09.2018
1478 - 05.08.2018
1332 - 03.07.2018
3448-11.03.2019
3283-24.02.2019
3267-21.02.2019
1141 - 23.05.2018
1574 - 10.09.2018
1544 - 23.08.2018
1857 - 06.10.2018
1564
GSB
SUB
SUB
GSB
GSB
SUB
SUB
GSB
GSB
SUB
SUB
GSB
GSB
SUB
SUB
GSB
GSB
SUB
SUB
GSB
GSB
SUB
SUB
GSB
PQC
PQC
PQC
PQC
PQC
PQC
PQC
PQC
PQC
PQC
PQC
PQC
C&G
C&G
C&G
C&G
C&G
C&G
C&G
C&G
C&G
C&G
C&G
C&G
CH CH CH CH CH CH
0
0
0
0
0
0
0
0
0
0
0
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS 0 LHS RHS 0 LHS RHS 0 LHS RHS 0 LHS RHS 0 LHS RHS 0 LHS
554010 553010 552010 551010 550010 549010
###
4146
4151
554020 553020 552020 551020 550020 549020
2964
2963
554030 553030 552030 551030 550030 549030
1681
554040 553040 552040 551040 550040 549040
554050 553050 552050 551050 550050 549050
4029 12.06.2019
4882 -01.12.2019
1819-03.10.2018
1708 - 26.09.2018
1812 - 03.10.2018
1940 - 14.10.2018
554060 553060 552060 551060 550060 549060
1640-21.09.2018
554070 553070 552070 551070 550070 549070
1592 - 15.09.2018
1627 - 20.09.2018
1141 - 23.05.2018
1942 - 14.10.2018
2282
554090 553090 552090 551090 550090 549090
554100 553100 552100 551100 550100 549100
2632 - 23.12.2018
554110 553110 552110 551110 550110 549110
2296-24.11.18
2283 - 22.11.2018
2358 - 30.11.2018
4273 - 22.07.19
4285 - 23.07.19
554120 553120 552120 551120 550120 549120
554130 553130 552130 551130 550130 549130
4829/22.11.2019
554140 553140 552140 551140 550140 549140
1881 - 08.10.2018
3039-28.01.2019
2937-17.01.2019
1153 - 26.05.2018
1968-16.10.2018
2013 - 21.10.2018
2919-15.01.2019
554210 553210 552210 551210 550210 549210
1795-01.10.2018
1960 - 15.10.2018
2795-04.01.2019
2992-23.01.2019
554220 553220 552220 551220 550220 549220
1857 - 06.10.2018
3014-25.01.2019
705 - 04.05.2018
705 - 04.05.2018
2816-06.01.2019
1740 - 28.09.2018
2537 - 15.12.2018
1936 - 13.10.2018
1787 - 30.09.2018
2928-16.01.2019
2830-07.01.2019
1585 - 13.09.2018
4838 - 23.11.2019
4837 - 23.11.2019
554530 553530 552530 551530 550530 549530
37 (A) - 18.01.2018
37 (A) - 18.01.2018
37 (A) - 18.01.2018
37 (A) - 18.01.2018
4830/22.11.2019
4882 - 01.12.2019
2550 - 16.12.2018
1967 - 16.10.2018
4222 - 15.07.19
2937-17.01.2019
2794-04.01.2019
1902 - 10.10.2018
2816-06.01.2019
2808-05.01.2019
2632 - 23.12.2018
1145 - 24.05.2018
1627 - 20.09.2018
1874 - 08.10.2018
1940 - 14.10.2018
1942
1960
1968
GSB
SUB
SUB
GSB
GSB
SUB
SUB
GSB
GSB
SUB
SUB
GSB
GSB
SUB
SUB
GSB
GSB
SUB
SUB
GSB
GSB
SUB
SUB
GSB
PQC
PQC
PQC
PQC
PQC
PQC
PQC
PQC
PQC
PQC
PQC
PQC
C&G
C&G
C&G
C&G
C&G
C&G
C&G
C&G
C&G
C&G
C&G
C&G
CH CH CH CH CH CH
0
0
0
0
0
0
0
0
0
0
0
0
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS 0 LHS RHS 0 LHS RHS 0 LHS RHS 0 LHS RHS 0 LHS RHS 0 LHS
560010 559010 558010 557010 556010 555010
560020 559020 558020 557020 556020 555020
560030 559030 558030 557030 556030 555030
4852 - 25.11.2019
4852 - 25.11.2019
560040 559040 558040 557040 556040 555040
677
677
560050 559050 558050 557050 556050 555050
560060 559060 558060 557060 556060 555060
3481-15.03.2019
560070 559070 558070 557070 556070 555070
560080 559080 558080 557080 556080 555080
3138-05.02.2019
3055-30.01.2019
560090 559090 558090 557090 556090 555090
560100 559100 558100 557100 556100 555100
2924-15.01.2019
560110 559110 558110 557110 556110 555110
560120 559120 558120 557120 556120 555120
3459-13.03.2019
3441-10.03.2019
3411-07.03.2019
3008-24.01.2019
3015-25.01.2019
4853 - 25.11.2019
4853 - 25.11.2019
560130 559130 558130 557130 556130 555130
677 - 03.05.2018
677 - 03.05.2018
560140 559140 558140 557140 556140 555140
2965-20.01.2019
560150 559150 558150 557150 556150 555150
3031-27.01.2019
560160 559160 558160 557160 556160 555160
560170 559170 558170 557170 556170 555170
4846 - 24.11.2019
573 - 27.04.2018
573 - 27.04.2018
560180 559180 558180 557180 556180 555180
3078-31.01.2019
560190 559190 558190 557190 556190 555190
560200 559200 558200 557200 556200 555200
2997-23.01.2019
560210 559210 558210 557210 556210 555210
560220 559220 558220 557220 556220 555220
560230 559230 558230 557230 556230 555230
3447-10.02.2019
2923-15.01.2019
560240 559240 558240 557240 556240 555240
560250 559250 558250 557250 556250 555250
3460-12.032019
3451-11.03.2019
25-5 STRIP CHART
3022-25.01.2019
3483-16.03.2019
560320 559320 558320 557320 556320 555320
677 -03.05.2018
677 -03.05.2018
3382-06.03.2019
560330 559330 558330 557330 556330 555330
3084-31.01.2019
3090-01.02.2019
3007-24.01.2019
3046-28.01.2019
1402 - 26.07.2018
560340 559340 558340 557340 556340 555340
4850 - 25.11.2019
4850 - 25.11.2019
3553-31.03.2019
560360 559360 558360 557360 556360 555360
560370 559370 558370 557370 556370 555370
560380 559380 558380 557380 556380 555380
560390 559390 558390 557390 556390 555390
560400 559400 558400 557400 556400 555400
560410 559410 558410 557410 556410 555410
560420 559420 558420 557420 556420 555420
560430 559430 558430 557430 556430 555430
560440 559440 558440 557440 556440 555440
3478-14.03.2019
3079-31.01.2019
(Approval after clear coments)
3462-12.03.2019
560450 559450 558450 557450 556450 555450
560460 559460 558460 557460 556460 555460
560470 559470 558470 557470 556470 555470
560480 559480 558480 557480 556480 555480
2973-21.01.2019
3498-19.03.2019
560510 559510 558510 557510 556510 555510
560520 559520 558520 557520 556520 555520
391 - 16.04.2018
391 - 16.04.2018
3441-10.03.2019
2261 - 17.11.2018
4845 - 24.11.2019
4844 - 24.11.2019
2513 - 13.12.2018
560580 3099-02.02.2019
559580 558580 557580 556580 555580
560590 559590 558590 557590 556590 555590
NCR-06
3004-24.01.2019
1403 - 26.07.2018
3531-28.03.2020
560610 559610 558610 557610 556610 555610
560620 559620 558620 557620 556620 555620
3564-01.04.2019
560630 559630 558630 557630 556630 555630
560640 559640 558640 557640 556640 555640
3023.01.2019
2539 - 15.12.2018
2984-22.01.2019
3490-17.03.2019
2493 - 12.12.2018
Rehabilitation and Up gradation to two lane with paved shoulder from Km 531/775 to Km 598/450 (Kunkuri to CH/JH Border
677 - 03.05.2018
677 - 03.05.2018
3493-18.03.32019
GSB
SUB
SUB
GSB
GSB
SUB
SUB
GSB
GSB
SUB
SUB
GSB
GSB
SUB
SUB
GSB
GSB
SUB
SUB
GSB
GSB
SUB
SUB
GSB
PQC
PQC
PQC
PQC
PQC
PQC
PQC
PQC
PQC
PQC
PQC
PQC
C&G
C&G
C&G
C&G
C&G
C&G
C&G
C&G
C&G
C&G
C&G
C&G
CH CH CH CH CH CH
0
0
0
0
0
0
0
0
0
0
0
0
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS 0 LHS RHS 0 LHS RHS 0 LHS RHS 0 LHS RHS 0 LHS RHS 0 LHS
566010 565010 564010 563010 562010 561010
2196
2862
566020 565020 564020 563020 562020 561020
2799
2188
566030 565030 564030 563030 562030 561030
2075
2131
566040 565040 564040 563040 562040 561040
2189-03.11.18
566050 565050 564050 563050 562050 561050
3564-01.04.2019
2434-07.12.2018
2309 - 25.11.2018
2350 - 29.11.2018
566060 565060 564060 563060 562060 561060
1644 - 21.09.2018
566070 565070 564070 563070 562070 561070
2701 - 28.12.2018
1790 - 30.9.2018
1972 - 16.10.2018
566080 565080 564080 563080 562080 561080
566090 565090 564090 563090 562090 561090
566100 565100 564100 563100 562100 561100
3303-27.02.2019
566110 565110 564110 563110 562110 561110
3112-03.02.2019
2077 - 26.10.2018
2144 - 01.11.2018
566120 565120 564120 563120 562120 561120
2211 - 6.11.2018
2936-17.01.2019
1944 - 14.10.2018
566130 565130 564130 563130 562130 561130
3657-21.04.2019
3431-09.03.2019
566140 565140 564140 563140 562140 561140
3530-28.03.2019
566150 565150 564150 563150 562150 561150
1845 - 5.10.2018
3249-19.02.2019
3194-12.02.2019
566160 565160 564160 563160 562160 561160
566170 565170 564170 563170 562170 561170
3293-25.02.2019
1725 - 29.9.2018
566180 565180 564180 563180 562180 561180
566190 565190 564190 563190 562190 561190
566200 565200 564200 563200 562200 561200
1800 - 1.10.2018
2818-06.01.2019
2278 - 21.11.2018
566210 565210 564210 563210 562210 561210
2815-06.01.2019
3580-04.04.2019 (NCR-07)
1645 - 21.09.2018
2202-05.11-2018
2993-23.01.2019
2889-12.01.2019
2214-06.11.2018
3292-25.02.2019
3211-14.02.2019
1815 - 3.10.2018
706 - 04.05.2018
1676 - 24.09.2018
2378 - 02.12.2018
2514 - 13.12.2018
3685-26.04.2019
2630A-17.11.2018
566240 565240 564240 563240 562240 561240
566250 565250 564250 563250 562250 561250
3466-13.03.2019
2429-06.12.18
2277 - 21.11.2018
2412-04.12.2018
25-6 STRIP CHART
2777-03.01.2019
3345-04.03.2019
2842-08.01.2019
2855-09.01.2019
3338-03.03.2019
3279-23.02.2019
3266-21.02.2019
566280 565280 564280 563280 562280 561280
NCR -06
3569-02.04.2019
3312-28.02.2019
3467-13.03.2019
3125-04.02.2019
2120-30.10.2018
2165 - 02.11.2018
2829-07.01.2019
3531-28.03.2019
1844 - 05.10.2018
2909-14.01.2019
566320 565320 564320 563320 562320 561320
566330 565330 564330 563330 562330 561330
2340A-28.11.2018
2853-09.01.2019
566360 565360 564360 563360 562360 561360
2738-31.12.2018
1744 - 28.9.18
3331-02.03.2019
3537-29.03.2019
3644-18.04.2019
566420 565420 564420 563420 562420 561420
3387-07.03.2019
1971 - 16.10.2018
566440 565440 564440 563440 562440 561440
2438 - 07.12.2018
2449
1816 - 3.10.2018
1971 - 16.10.2018
566460 565460 564460 563460 562460 561460
2825-07.01.2019
1757 - 29.9.2018
3285-24.02.2019
1969 - 16.10.2018
3665-22.04.2019
566510 565510 564510 563510 562510 561510
566520 565520 564520 563520 562520 561520
2308 - 25.11.2018
2349A -29.11.2018
2828-07.01.2019
2011 - 21.10.2018
3431-09.03.2019
3458-12.03.2019
566540 565540 564540 563540 562540 561540
566550 565550 564550 563550 562550 561550
2791-04.01.2019
2145 - 01.11.2018
1726 - 27.09.2018
2644 - 24.12.2018
2073 - 26.10.2018
3697-27.04.2019
2213-06.11.2018
3304-27.02.2019
1904 - 10.10.2018
2899-13.01.2019
3472-14.03.2019
3521-27.03.2019
2186 - 03.11.2018
1756 - 29.09.2018
3330-02.03.2019
3294-25.02.2019
2010 - 21.10.2018
1790 - 30.9.2018
3323-01.03.2019
1980 - 18.10.2018
2027 - 25.10.2018
1971
2856-09.012019
1711 - 26.09.2018
3345-04.03.2019
2843-08.01.2019
3670-23.04.2019
Rehabilitation and Up gradation to two lane with paved shoulder from Km 531/775 to Km 598/450 (Kunkuri to CH/JH Border
2189-03.11.18
1725 -27.9.2018
1815 - 3.10.2018
3466-13.03.2019
3431-09.03.2019
3266-21.02.2019
2214-06.11.2018
2064 - 25.10.2018
2076 - 26.10.2018
3279-23.02.2019
2867-10.01.2019
3293-25.02.2019
3657-21.04.2019
2131-31.10.2018
2188-03.11.2018
1726 - 27.09.2018
1643 - 21.09.2018
2075 - 26.10.2018
2309 - 25.11.2018
2350 - 29.11.2018
2077
2144
1676-24.09.2018 1269 - 26.6.2018
2842-08.01.2019
GSB
SUB
SUB
GSB
GSB
SUB
SUB
GSB
GSB
SUB
SUB
GSB
GSB
SUB
SUB
GSB
GSB
SUB
SUB
GSB
GSB
SUB
SUB
GSB
PQC
PQC
PQC
PQC
PQC
PQC
PQC
PQC
PQC
PQC
PQC
PQC
C&G
C&G
C&G
C&G
C&G
C&G
C&G
C&G
C&G
C&G
C&G
C&G
CH CH CH CH CH CH
0
0
0
0
0
0
0
0
0
0
0
0
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS 0 LHS RHS 0 LHS RHS 0 LHS RHS 0 LHS RHS 0 LHS RHS 0 LHS
572010 571010 570010 569010 568010 567010
3789
3772
3773
572020 571020 570020 569020 568020 567020
572030 571030 570030 569030 568030 567030
572040 571040 570040 569040 568040 567040
4192 07.07.19
572050 571050 570050 569050 568050 567050
3740- 06.05.2019
2486 - 11.12.2018
572060 571060 570060 569060 568060 567060
4057 - 16.06.19
572070 571070 570070 569070 568070 567070
3383-06.03.2019
572080 571080 570080 569080 568080 567080
572090 571090 570090 569090 568090 567090
572100 571100 570100 569100 568100 567100
2939-17.01.2019
2940-17.01.2019
572110 571110 570110 569110 568110 567110
3180-10.02.2019
3718-01.05.2019
572130 571130 570130 569130 568130 567130
572140 571140 570140 569140 568140 567140
3557-31.03.2019
3565-02.04.2019
572150 571150 570150 569150 568150 567150
2452 - 08.12.2018
572160 571160 570160 569160 568160 567160
572170 571170 570170 569170 568170 567170
3145-05.02.2019
3088-31.01.2019
3332-02.03.2019
3513-25.03.2019
3538-29.03.2019
4880 - 01.12.2019
4166 - 04.07.19
572220 571220 570220 569220 568220 567220
572230 571230 570230 569230 568230 567230
3996- 09.06.19
4881 - 01.12.2019
572240 571240 570240 569240 568240 567240
3640-18.04.2019
572250 571250 570250 569250 568250 567250
2459 - 9.12.2018
2459 - 9.12.2018
25-7 STRIP CHART
4144 - 29.06.19
4200 10.07.2019
572270 571270 570270 569270 568270 567270
4020 - 1.06.19
3966 - 04.06.19
2061 -25.10.2018
3932 -31.05.2019
2061 - 25.10.2018
3953 - 02.06.2019
3933 - 31.05.2019
3923 - 29.05.2019
3751- 08.05.2019
3801 - 13.05.2019
572300 571300 570300 569300 568300 567300
4020 - 11.06.19
572340 571340 570340 569340 568340 567340
3515-25.03.2019
4019
572350 571350 570350 569350 568350 567350
572360 571360 570360 569360 568360 567360
3781- 11.05.2019
3782- 11.05.2019
572370 571370 570370 569370 568370 567370
572380 571380 570380 3421-08.03.2019 569380 568380 567380
572390 571390 570390 569390 568390 567390
3581-04.04.2019
3356/05-03-2019 (not Approved)
3356/05-03-2019 (not Approved)
4280 - 23.07.19
572410 571410 570410 569410 568410 567410
572420 571420 570420 569420 568420 567420
3412-07.03.2019
2104 - 29.10.2018
2103 - 29.10.2018
572470 571470 570470 569470 568470 567470
3688-26.04.2019
3701-28.04.2019
4150 - 30.06.19
4248 - 19.07.19
572500 571500 570500 569500 568500 567500
4184 05.07.2019
4052 - 14.06.19
3983 - 07.06.19
3978 - 06.06.19
3172-09.02.2019
3556-31.03.2019
2486 - 11.12.2018
2487 - 11.12.2018
2720 - 30.12.2018
4070 - 18.06.19
572560 571560 570560 569560 568560 567560
572570 571570 570570 569570 568570 567570
572580 571580 570580 569580 568580 567580
572590 571590 570590 569590 568590 567590
572600 571600 570600 569600 568600 567600
4026 - 12.06.19
4300 - 25.07.19
572660 571660 570660 569660 568660 567660
3672-24.04.2020
4187 6.07.2019
2646 - 24.12.2018
3589-06.04.2019
4008 - 10.06.19
3505-23.03.2019
3996 09.06.19
3973 -05.06.19
4031 - 13.06.19
2061 -25.10.2018
2083 - 27.10.2018
2083 - 27.10.2018
2061 - 25.10.2018
3941 - 01.06.2019
3953 - 02.06.2019
3928 - 30.05.2019
3768- 10.05.2019
3783-11.05.2019
4207 12.07.2019
3698-27.04.2019
3538-29.03.2019
3810 - 15.05.2019
4075
3640
4166
0
0
GSB RHS 4080 - 19.06.19 4060 -16.06.19 4220 - 14.07.19 4228 - 15.07.19
DLC RHS 4075-19.06.19 4082 - 20.06.19 4223 - 15.07.19 4239 17-.07-19
PQC RHS
0 4345 / 02.08.19
PQC LHS 3847-20.05.19 (+073) 4442/16.8.19 3848-20.05 (+125) 3856 - 21.05.2019 3829 - 18.05.2019 4447/17.08.19
DLC LHS 3716-30.04.2019 4407 - 08-08-19 3831 - 18.05.2019 3840 - 19.05.2019 3716-30.04.2019 3722-02.05.2019 4143 - 28.06.19
LHS
0
0
GSB RHS 4228 15.07.19 4236 - 16.07.19 4242 - 17.07.19 4254 - 19.07.19 4348/2.8.19 4121/25.6
DLC RHS 4239 - 17.07.19 4249 - 19.07.19 4259 - 20.07.19 4349/2.8.19 4217 -17.7
PQC RHS
0 4345 / 02.08.19 4361 / 04.08.19 4355 / 03.08.19 4362 / 04.08.19 4373 / 05.08.19 4392 / 07.08.19
PQC LHS 4447/17.08.19 3889 - 24.05.2019 3665 - 22.05.2019
DLC LHS 4143 - 28.06.19 4688 / 20.10.2019 4689 / 20.10.2019 3866 - 22.05.2019 3727- 03.05.2025
LHS
0
0
0
0
0
0
C&G RHS 2379 - 2.12.2018 3389/07-03-19 2382 - 2.12.2018 3140-05.02.2019 2386 - 02.12.2018
SUB RHS 4235 - 16.07.19 / 18.07.19 4245 - 18.07.19 4363 - 04.08.19 4364 - 04.08.19
RHS
GSB RHS 4255 - 19.07.19 4260 - 20.07.19 4367 7 04.08.19 4368 / 04.08.19
DLC RHS 4258 - 20.07.19 4271 - 21.07.19 4448/17.08.19 4449/17.08.19
PQC RHS
0 4425/13.08.19 (577+135) 4436/14.08.19 (577+135 to) 4475/22.08.19 4481/23.08.19 4488/24.08.19
PQC LHS 3948 - 02.06.2019 3957 - 03.06.19 3978 - 06.06.19 3981 -07.06.19
DLC LHS 3752- 08.05.2019 3757 -09.05.2019 3769- 10.05.2019
LHS
0
0
GSB RHS 4368 / 04.08.19 4267 - 21.07.19 4276 - 22.07.19 4277 - 22.07.19
DLC RHS 4449/17.08.19 4281 - 23.07.19 4292 - 24.07.19
PQC RHS 4488/ 24.08.19 4493/ 25.08.19 4506 / 28.08.19 4508 / 30.08.19
Rehabilitation and Up gradation to two lane with paved shoulder from Km 531/775 to Km 598/450 (Kunkuri to CH/JH Border
Section) of NH-78 in the state of Chhattisgarh under NHDP-IV through Engineering, Procurement & Construction (EPC) basis
DLC
DLC
DLC
DLC
DLC
DLC
DLC
DLC
DLC
DLC
DLC
DLC
GSB
SUB
SUB
GSB
GSB
SUB
SUB
GSB
GSB
SUB
SUB
GSB
GSB
SUB
SUB
GSB
GSB
SUB
SUB
GSB
GSB
SUB
SUB
GSB
PQC
PQC
PQC
PQC
PQC
PQC
PQC
PQC
PQC
PQC
PQC
PQC
C&G
C&G
C&G
C&G
C&G
C&G
C&G
C&G
C&G
C&G
C&G
C&G
CH CH CH CH CH CH
0
0
0
0
0
0
0
0
0
0
0
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS 0 LHS RHS 0 LHS RHS 0 LHS RHS 0 LHS RHS 0 LHS RHS 0 LHS
584010 583010 582010 581010 580010 579010
584020 583020 582020 581020 580020 579020
4508/+015
584030 583030 582030 581030 580030 579030
584040 583040 582040 581040 580040 579040
4074 - 19.06.19
584050 583050 582050 581050 580050 579050
4589/21.09.2019
4668/17.10.19 (.055)
4788/19.11.19
4050 + 15.06.19
4607/ 24.09.2019
4610/ 24.09.2019
584060 583060 582060 581060 580060 579060
4666/16.10.2019
3811 - 15.05.2019
4674 / 17.10.2019
4684 / 19.10.2019
4914 - 05-12-19
584070 583070 582070 581070 580070 579070
584080 583080 582080 581080 580080 579080
584090 583090 582090 581090 580090 579090
4536 / 05.09.19
4017 - 11.06.19 (580+115)
4928 - 06-12-19
584100 583100 582100 581100 580100 579100
4523 / 03.09.19
4522 / 03.09.19
584110 583110 582110 581110 580110 579110
4510 / 31.08.19
584120 583120 582120 581120 580120 579120
4710 - 06.11.19
4711 - 06.11.19
3733- 04.05.2019
4720 - 08.11.2019
4557/15.09.2019
584130 583130 582130 581130 580130 579130
3791- 12.05.2019
3794- 12.05.2019
4286 - 23.07.19
3857 - 21.05.2019
4025-12.06.19
4806/20.11.2019
4579 / 19.09.2019
584170 583170 582170 581170 580170 579170
3981 - 07.06.19
4953 - 10-12-19
3878 - 23.05.2019
584180 583180 582180 581180 580180 579180
584190 583190 582190 581190 580190 579190
4862/27.11.2019
4081 - 20.06.19
4292 24.07.19
4945 - 08-12-19
584200 583200 582200 581200 580200 579200
4369 / 04.08.19
4311 - 26.07.19
4862/27.11.2019
4805 - 19.11.2019
584210 583210 582210 581210 580210 579210
4840/23.11.2019
4804 - 19.11.2019
4752 - 13.11.2019
584220 583220 582220 581220 580220 579220
4374 / 05.08.19
4387 / 06-08-19
4284 - 23.07.19
4578 / 19.09.2019
584240 583240 582240 581240 580240 579240
584250 583250 582250 581250 580250 579250
4569 / 17.09.2019
25-9 STRIP CHART
4545/07.09.2019
584270 583270 582270 581270 580270 579270
3703-28/04/2019
4514 / 01.09.19
4825/21.11.2019
3793-12.05.2019
3795 -12.05.2019
3817 - 16.05.2019
3822 - 17.05.2019
4625 / 03-10-2019
584420 583420 582420 581420 580420 579420
584430 583430 582430 581430 580430 579430
584440 583440 582440 581440 580440 579440
3779- 11.05.2019
4584 / 20.06.2019
4665/16.10.2019
584460 583460 582460 581460 580460 579460
3987 08.06.19
3884 - 24.05.2019
3820 - 16.05.2019
3867 - 22.05.2019
3062-30.01.2019
3062-30.01.2019
3061-30.01.2019
3061-30.01.2019
3061-30.01.2019
3061-30.01.2019
2883-11.01.2019
2883-11.01.2019
2868-10.01.2019
2868-10.01.2019
5002 - 18-12-19
584550 583550 582550 581550 580550 579550
4639 / 06-10-19
4658/14.10.2019
3901 - 26.05.2019
4867 - 28.11.2019
4583/ 19.09.2019
4582/ 19.09.2019
4915 - 05-12-19
4885 - 02-12-19
4528 / 04.09.19
4884 - 02-12-19
4786/18.11.2019
4774 - 16.11.2019
4554/14.09.2019
4879 -01.12.2019
3745+- 07.05.2019
5010 - 19-12-19
3841 - 19.05.2019
3858 - 21.05.2019
4634 / 04-10-19
3780- 11.05.2019
3795 -12.05.2019
4605 / 24.09.2019
4666/16.10.2019
4674 / 17.10.2019
3811 - 15.05.2019
3857 - 21.05.2019
4668/17.10.19
4650/7-10-19
4710 - 06.11.19
4711 - 06.11.19
4647 / 07-10-19
5019 - 21.12.19
DLC
DLC
DLC
DLC
DLC
DLC
DLC
DLC
DLC
DLC
DLC
DLC
GSB
SUB
SUB
GSB
GSB
SUB
SUB
GSB
GSB
SUB
SUB
GSB
GSB
SUB
SUB
GSB
GSB
SUB
SUB
GSB
GSB
SUB
SUB
GSB
PQC
PQC
PQC
PQC
PQC
PQC
PQC
PQC
PQC
PQC
PQC
PQC
C&G
C&G
C&G
C&G
C&G
C&G
C&G
C&G
C&G
C&G
C&G
C&G
CH CH CH CH CH CH
0
0
0
0
0
0
0
0
0
0
0
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS 0 LHS RHS 0 LHS RHS 0 LHS RHS 0 LHS RHS 0 LHS RHS 0 LHS
590010 589010 588010 587010 586010 585010
590020 589020 588020 587020 586020 585020
1263
590030 589030 588030 587030 586030 585030
590040 589040 588040 587040 586040 585040
5080 - 29.12.19
590050 589050 588050 587050 586050 585050
4790/19.11.2019
3395/07-03-2019
4775 -16.11.2019
4650/7-10-19
2067 - 25.12.2018
590060 589060 588060 587060 586060 585060
590070 589070 588070 587070 586070 585070
4696 - 22.10.19
3394/07-03-2019
4686 / 19.10.2019
590080 589080 588080 587080 586080 585080
590090 589090 588090 587090 586090 585090
4814/20.11.19 + 3396/07-03-2019
590120 589120 588120 587120 586120 585120
5063 - 27.12.19
4920 - 06-12-19
590130 589130 588130 587130 586130 585130
4924 - 06-12-19
590140 589140 588140 587140 586140 585140
5086/30-12-19
4907 - 04-12-19
4932 - 07-12-19
4860/26.11.2019
4835 - 23.11.2019
590150 589150 588150 587150 586150 585150
1257 - 25.6.2018
5031 - 23.12.19
4723 - 09.11.2019
590170 589170 588170 587170 586170 585170
4636 /05-10-19
4647 / 07-10-19
4789/19.11.2019
1256 - 25.06.2018
590210 589210 588210 587210 586210 585210
590220 589220 588220 587220 586220 585220
4736 - 11.11.2019
4743 - 12.11.2019
2361 - 30.11.2018
2361 - 30.11.2018
5019 - 21.12.19
2012 - 21.10.2018
4705 - 03/11/2019
590280 589280 588280 587280 586280 585280
3397/07-03-2019
1261 - 25.06.2018
590290 589290 588290 587290 586290 585290
4669 / 17/10/19
25- 10 STRIP CHART
4946 -09-12-19
590320 589320 588320 587320 586320 585320
590330 589330 588330 587330 586330 585330
590340 589340 588340 587340 586340 585340
590350 589350 588350 587350 586350 585350
590360 589360 588360 587360 586360 585360
590370 589370 588370 587370 586370 585370
590380 589380 588380 587380 586380 585380
4815-20.11.19 + 3398/07-03-2019
590390 589390 588390 587390 586390 585390
590400 589400 588400 587400 586400 585400
590410 589410 588410 587410 586410 585410
590420 589420 588420 587420 586420 585420
4726 - 09.11.19
590430 589430 588430 587430 586430 585430
4729 - 10.11.2019
1255 - 25.06.2018
5078 - 29.12.19
4836 - 23.11.2019
590460 589460 588460 587460 586460 585460
590470 589470 588470 587470 586470 585470
4661/15.10.2019
4704 - 03/11/2019
4641 / 06-10-2019
1254 - 25.06.2018
5046 - 25.12.19
2106 - 29.10.2018
2106 - 29.10.2018
4791 - 19.11.2019
3399/07-03-2019
590600 589600 588600 587600 586600 585600
4810/20.11.2019
590610 589610 588610 587610 586610 585610
1297 - 28.06.2018
1297 - 28.06.2018
4700 - 01/11/2019
1260 - 25.06.2018
4812/20-11-19
4934 - 07-12-19
4931 - 07-12-19
4864 - 27.11.2019
2012 - 21.10.2018
3401/07-03-2019
4785/18.11.2019
2067 - 25.10.2018
Rehabilitation and Up gradation to two lane with paved shoulder from Km 531/775 to Km 598/450 (Kunkuri to CH/JH Border
4946 - 09-12-19
4924 - 06-12-19
4790/19.11.2019
4775 -16.11.2019
4696 - 22.10.2019
4865/27.11.19
4813 - 20.11.19 +3395/07-03-2019
GSB
SUB
SUB
GSB
GSB
SUB
SUB
GSB
GSB
SUB
SUB
GSB
GSB
SUB
SUB
GSB
GSB
SUB
SUB
GSB
GSB
SUB
SUB
GSB
PQC
PQC
PQC
PQC
PQC
PQC
PQC
PQC
PQC
PQC
PQC
PQC
C&G
C&G
C&G
C&G
C&G
C&G
C&G
C&G
C&G
C&G
C&G
C&G
CH CH CH CH CH CH
0
0
0
0
0
0
0
0
0
0
0
0
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS 0 LHS RHS 0 LHS RHS 0 LHS RHS 0 LHS 0 LHS RHS 0 LHS
RHSRHS
596010 595010 594010 593010 592010 591010
596020 595020 594020 593020 592020 591020
596030 595030 594030 593030 592030 591030
596040 595040 594040 593040 592040 591040
4965 - 12.12.19
4966 - 12.12.19
596050 595050 594050 593050 592050 591050
596060 595060 594060 593060 592060 591060
596070 595070 594070 593070 592070 591070
5004 - 18-12-19
596080 595080 594080 593080 592080 591080
596090 595090 594090 593090 592090 591090
4974 - 13.12.19
4957 - 10-12-19
4922 - 06-12-19
596100 595100 594100 593100 592100 591100
1276 - 27.06.2018
596110 595110 594110 593110 592110 591110
596120 595120 594120 593120 592120 591120
1251 - 25.06.2018
1280 - 27.06.2018
5039 - 24.12.19
4940 - 08-12-19
596130 595130 594130 593130 592130 591130
1278 - 27.06.2018
596140 595140 594140 593140 592140 4993 - 15.12.19 591140
596150 595150 594150 593150 592150 591150
4892 - 03-12-19
596160 595160 594160 593160 592160 591160
1276 - 27.06.2018
596170 595170 594170 593170 592170 591170
4991 - 14.12.19
596180 595180 594180 593180 592180 591180
596190 595190 594190 593190 592190 591190
596200 595200 594200 593200 592200 591200
596210 595210 594210 593210 592210 591210
3362-05.03.2019
3363-05.03.2019
596220 595220 594220 593220 592220 591220
1274 - 27.06.2018
596230 595230 594230 593230 592230 591230
596240 595240 594240 593240 592240 591240
596250 595250 594250 593250 592250 591250
596260 595260 594260 593260 592260 591260
2221-06.11.208
596270 595270 594270 593270 592270 591270
5027 - 22.12.19
4966 - 12.12.19
4965 - 12-12-19
4865/27.11.2019
5015 - 20.12.19
4999 - 16.12.19
4956 - 10-12-19
596300 595300 594300 593300 592300 591300
596310 595310 594310 593310 592310 591310
2218-06.11.2018
4947 - 09-12-19
596470 595470 594470 593470 592470 591470
596480 595480 594480 593480 592480 591480
596490 595490 594490 593490 592490 591490
1250 - 25.06.2018
5014 - 20.12.19
4900 - 04-12-19
596640 595640 594640 593640 592640 591640
596650 595650 594650 593650 592650 591650
596660 595660 594660 593660 592660 591660
4898 - 04-12-19
Rehabilitation and Up gradation to two lane with paved shoulder from Km 531/775 to Km 598/450 (Kunkuri to CH/JH Border
4940 - 08-12-19
5004 - 18-12-19
4965 - 12-12-19
1276
1274
GSB
SUB
SUB
GSB
GSB
SUB
SUB
GSB
PQC
PQC
PQC
PQC
C&G
C&G
C&G
C&G
CH CH
0
0
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS 0 LHS RHS 0 LHS
598010 597010
598020 597020
598030 597030
598040 597040
598050 597050
598060 597060
598070 597070
598080 597080
598090 597090
598100 597100
598110 597110
598120 597120
598130 597130
598140 597140
598150 597150
598160 597160
598170 597170
598180 597180
598190 597190
598200 597200
598210 597210
598220 597220
598230 597230
598240 597240
598250 597250
598260 597260
598270 597270
598280 597280
25- 12 STRIP CHART
598290 597290
598300 597300
598310 597310
598320 597320
598330 597330
4987 - 14.12.19
598340 597340
598350 597350
598360 597360
598370 597370
598380 597380
598390 597390
598400 597400
598410 597410
598420 597420
598430 597430
598440 597440
598450 597450
598460 597460
598470 597470
598480 597480
598490 597490
4901 - 04-12-19
4899 - 04-12-19
598500 597500
598510 597510
598520 597520
598530 597530
598540 597540
598550 597550
598560 597560
598570 597570
598580 597580
598590 597590
598600 597600
598610 597610
598620 597620
598630 597630
598640 597640
598650 597650
598660 597660
598670 597670
598680 597680
598690 597690
598700 597700
598710 597710
598720 597720
598730 597730
598740 597740
598750 597750
598760 597760
598770 597770
598780 597780
598790 597790
598800 597800
598810 597810
598820 597820
598830 597830
598840 597840
598850 597850
598860 597860
598870 597870
598880 597880
598890 597890
598900 597900
Section) of NH-78 in the state of Chhattisgarh under NHDP-IV through Engineering, Procurement & Construction (EPC) basis
Rehabilitation and Up gradation to two lane with paved shoulder from Km 531/775 to Km 598/450 (Kunkuri to CH/JH Border
598910 597910
598920 597920
598930 597930
598940 597940
598950 597950
598960 597960
Page 48
598970 597970
598980 597980
598990 597990
599000 598000
Thank you
Rehabilitation and Up gradation to two lane with paved shoulder from Km 531/775 to Km 598/450 (Kunkuri to CH/JH Border
Section) of NH-78 in the state of Chhattisgarh under NHDP-IV through Engineering, Procurement & Construction (EPC) basis