Professional Documents
Culture Documents
BCW
BCW
PRESENTATION
On
Description
Start Permissive
Protection
Starting Procedure
Isolation Procedure
Emergency Operation
BCW PUMP
EQUIPMENT DESCRIPTION
No. Description
1 3 Nos. BCW are produced by Torishima company. As per design 2 out of 3 pumps can run
full load operation. In order to increase the flexibility of operation, 3 pumps can be put into
service.
2 Three pumps are equipped with wet motor type HLAV2 X300-500/1C type.
TECHNICAL DATA
2
Design pressure 215 Kg/cm Test pressure 322.5 Kg/cm2
3
Capacity 3748 m /h Head 32.5 m
Boiler water circulating pump motor
Type model HLV55/4 FQ45-335 Rated power 450 kW
Rated voltage 3300 V Rated current 122 A
Speed 1458 r/min Protection IP/68
START PERMISSIVE
4 Electrical trip
5 Uncommanded trip
BCW LINE DIAGRAM
BCW CAVITY FILLING
Ensure that Work permit on respective equipment's are closed and men and material are removed from these areas.
1
Ensure Pump vents are kept open & line drains are closed
9
Start cavity filling .
10
Maintain and ensure flow of 5 L/Min by throttling manual valve ( after 2nd strainer )
11
Do cavity air venting & flushing through pump vent.
12
Once cavity filled ensure water comes out from the vent. Take sample
13
Stop the filling.
14
Check Motor Megger value and it should be > 200 M-Ohm
15
STARTING PROCEDURE
1 Ensure that Work permit on respective equipment’s are closed and men and material are removed from these areas.
2 Ensure that Boiler water circulating pumps motor cavity is properly filled and vented.
3 Local drum gauge glass is available. Hydra step and drum level recorder available in CCR.
4 Ensure Boiler Drum vent valves B3, B4, B25 & B26 are in closed condition and Healthy.
5 Ensure Boiler Drum vent valves B1, B2, B28 & B29 are in closed condition and Healthy.
Ensure the pump draws about 60-75 amps and DP is >1 kg/cm2, If values are fluctuating immediate stop the
1
pump, vent thoroughly and ensure the Drum level.
2 Check that drum level is adequate, if not open the low range feed control valve to make it up.
3 Open Boiler Drum vent valves B1, B2, B28 & B29, as it takes auto close command with BCW Pump ON.
4 Start another BCW pump when Drum pressure will reach above 8 kg/cm2 and Check the following ;
a) Motor current
0
1 To stop the BCW pump the suction manifold temperature should be. less than 90 C and differential drum metal temperature
0
should be less than 50 C.
3 Confirm BCW pump breaker off, breaker, switch off Control supply. Rack out the breaker.
0 0
1 Temperature of motor chamber high: In normal operation motor temperature is less than 50 C. When temperature exceeds 60 C alarm
will appear and pump will trip if the temperature is greater than 65°C.The following reasons may cause high temperature:-
f) Motor cavity drain valve should be full closed and drain valve near motor should be hand tightened. There should not be any drop of
water leakage.
2 If the temperature rises continuously above 60 Deg C and reason not found and when cannot be corrected then stop the pump.
0
3 If Suction manifold and pump casing metal Diff. Temp is >50 C, pump start permissive not available, to avoid this open equalising line drain.
4 One running pump trips out of 3, it will affect the drum level, than control the drum level.
5 If 2 pumps trips unit will run back to reduce the load to 300 MW, bottom elevation 3 mill hold and AB elevation guns cut in.