CIE-2 Presentation SGNNSGNWFNSG
CIE-2 Presentation SGNNSGNWFNSG
CIE-2 Presentation SGNNSGNWFNSG
Mehul mer P ro f . M i h i r Ve l a n i
15SOEEE11018
A s i s t . P ro f . , E E
External Guide:
M r. D e e p a k S o m a i y a
Department of Mechanical Engineering,
School of Diploma Studies, RK
Senior Supervisor
University
5S Implementation
Machine Maintenance
Rejection Material
Incoming Material Inspection Report
Standard Room Instruments
References
Conclusion
To implement any system it is necessary to decide the
best system to implement for making Lean
Manufacturing process. These are several steps given
below .
Management Decision
Sorting of various Department
Sorting of Manpower according to division.
Idea’s from all of the employees.
List of best ideas to be implemented and the things
required for implementation.
1. Sort.
2. Set in order.
3. Shine.
4. Standardise.
5. Sustain.
The departments are divided into various zones.
Each zone is having zonal Heads and other employee.
Firstly idea’s from all workers is gathered and the best
one idea is chosen for implementation.
Maintenance of Machine is done on the given Basis.
Daily Maintenance
Weekly Maintenance
Monthly Maintenance
Yearly Maintenance
Preventive Maintenance
Breakdown Maintenance &
CLIT Sheet (Cleaning, Lubrication, Inspection, & Tightening )
1. Cleaning of Machine & Checking of near about area.
2. Cleaning of all Electric Motor & checking of it’s
heating.
3. Cleaning of Electric Panel Board from Outside.
4. Oiling in Dresser & Machine Slide.
5. Checking of vibration of Dresser.
6. Cleaning of Comparator Stand & Dial Indicator.
7. Covering of Grinding Area with Plastic.
8. Checking of Dial of Machine Slide.
1. Checking of all Electric Motor for heating.
2. Checking of extra noise in Hydraulic Motor.
3. Checking of extra noise in Machine.
4. Checking of Gear oil Level with color
5. Checking of extra noise & heating of feeder motor.
6. Checking of Point of Diamond of Dresser.
7. Cleaning of Dresser.
8. Checking of feeder rolls by using of different series.
9. Checking of Poka-Yoke system status and Proxy
Sensor.
Accident on Outer Diameter & Face
Corrosion + Uneven Cutting Edge
Length Minus + Improper Face Forging Defected
1. Rough Center less Grinder 3. End Face Grinder
o OD Size o Length
o Taper o Face Run out
o 3 Point Ovality o Face Radius
o Visual o OD 3 Point Ovality
o Face RA
o Visual
2. Semi-Finish Center less 4. Finish Center less Grinder
Grinder o OD Size
o OD Size o Taper
o Taper o OD Profile
o OD Profile o OD Roundness
o OD RA o OD RA Value
o OD 3 Point Ovality o OD 3 Point Ovality
o Visual o Visual
Sr. No. Parameter Instrument
1 Roller OD Diameter Dial Comparator Stand ( 2-point )
2 Taper Variation Dial Comparator Stand ( 2-point )
3 2pt. Ovality Dial Comparator Stand ( 2-point )
4 3pt. Ovality Dial Comparator Stand ( 3-point )
5 Length Length Dial Comparator Stand
6 Face Run out Dial with V-Block
7 Radius Runout Dial with V-Block
8 Dimple Runout Dial with V-Block
9 Indent (Dimple) Diameter Vernier Caliper
10 Indent (Dimple)Depth Vernier Caliper
11 Indent (Dimple) Visual Visual
12 Small End Visual Visual
13 Hardness Rockwell Hardness Tester
There are mainly 2 instruments in the standard room.
1. Mahr MMQ 100 &
2. Mahr XC 20