Iida Fvi Station Improvement

You might also like

Download as ppt, pdf, or txt
Download as ppt, pdf, or txt
You are on page 1of 10

IIDA

(ALL
(ALL EY
EY SERIES
SERIES MODELS)
MODELS)

FVI STATION
IMPROVEMENT
Trademark: Products: Prepared By:

Alminda L. Arivan
History : 1990 - Developed digital speed limiter.
1946 - IIDA was established by an 1992 - Developed digital speed limiter –
Aeronautical Engineer, Mr. Yoshihisa Ignition system integrated module.
Iida at Machida-City Tokyo Japan. 1994 - Developed DC ignition module
1948 - The company head office was For small engines.
Moved to new location of Meguro Tokyo. 1995 - Started Production at Laguna,
1951 - Mistake Plant was newly Built at Philippines.
Mitaka-City Tokyo. 1996 - Developed ESS (engine safety
1974 - Developed TCI (transistor Controlled Switch).
Ignition) system. 1997 - Started production of iron cast
1979 - Started export Sales for Oversea Flywheel and stamping parts at Chinese
customer. Partners.
1980 - Developed Hybrid IC for TCI 1999 - Developed float type oil sensor.
Systems. 2001 - Increased capacity of Philippines
1983 - Receive reward from Ministry of Laguna Production Line at IMI.
Science and Technology on IIDA 2001 - Developed ignition module for
TCI System. Emission regulation.
1988 - Developed full automatic winding 2002 - Developed ultra – small sized
Ignition Coil Machine. Ignition module.
IIDA Improvement Plan
Slide 1

Process : FVI 1

Observation: Inspection w/out solder balls


Inspection w/ solder balls

Out of 60 observations 52% of the units does not have solder


balls and most of the time the operator is just doing it for extra
handling/motion. The average inspection time is 3 seconds per
unit which is very fast and can be eliminated.

IMI SSCG- Industrial Engineering Group Providing the edge in electronics manufacturing…
IIDA Improvement Plan
Slide 3

- w/out solder balls


Time Study Observation :
IIDA / EY SERIES

FVI 1 (Casing) 1 2 3 4 5 6 7 8 9 10
Get unit / place under magnifying lense Total Time = 3.6070
Inspect / get twizer remove solder balls 2.94 4.61 1.59 5.97 1.93 5.1 2.65 5.56 2.44 3.28 36.0700 10 3.6070 Standard Time = 3.8880
Setaside HPU = 0.001080
UPH = 926

Get unit / place under magnifying lense Total Time = 3.2910


Inspect / get twizer remove solder balls 1.96 2.42 3.3 3.53 4.08 1.88 2.11 5.69 5.66 2.28 32.9100 10 3.2910 Standard Time = 3.5474
Setaside HPU = 0.000985
UPH = 1015

Get unit / place under magnifying lense Total Time = 3.1950


Inspect / get twizer remove solder balls 5.64 3.06 2.58 2.33 1.5 1.97 2.44 3.18 3.87 5.38 31.9500 10 3.1950 Standard Time = 3.4439
Setaside HPU = 0.000957
UPH = 1045

Get unit / place under magnifying lense Total Time = 3.2310


Inspect / get twizer remove solder balls 2.63 2.36 3.62 2.11 6.16 2.33 3.52 3.68 1.7 4.2 32.3100 10 3.2310 Standard Time = 3.4827
Setaside HPU = 0.000967
UPH = 1034

Get unit / place under magnifying lense Total Time = 3.1070


Inspect / get twizer remove solder balls 4.96 2.8 3.71 2.1 5.25 3.31 1.7 1.85 1.46 3.93 31.0700 10 3.1070 Standard Time = 3.3490
Setaside HPU = 0.000930
UPH = 1075

Get unit / place under magnifying lense Total Time = 3.1370


Inspect / get twizer remove solder balls 2.01 4.36 1.72 2.04 1.68 1.71 6.4 4.29 4.43 2.73 31.3700 10 3.1370 Standard Time = 3.3814
Setaside HPU = 0.000939
UPH = 1065
IIDA Improvement Plan
Slide 2

Recommendation:

Eliminate the FVI on casing since 52% of the inspection time the operator is
not seeing any solder balls from the units. And most of time the operator is
just handling the units for the sake that she inspected it . And the process has
a yield of 99.9% .

IMI SSCG- Industrial Engineering Group Providing the edge in electronics manufacturing…
IIDA Improvement Plan
Slide 3

Standard Time Detail / Impact:

CUSTOMER: IIDA

IMPROVEMENT PER STATION IMPROVEMENT OVERALL STATION


MODEL HPU HPU % HPU HPU %
FVI 1 FVI 1 DIFFERENCE DIFFERENCE OVERALL OVERALL DIFFERENCE DIFFERENCE
(EXISTING) (IMPROVED) (EXISTING) (IMPROVED)
EY SERIES (ALL) 0.004070 0.001986 0.002084 51% 0.041183 0.039099 0.002084 5%
EY 26310 0.004070 0.001986 0.002084 51% 0.041959 0.039875 0.002084 5%
EY 26400 0.007015 0.001986 0.005029 72% 0.059048 0.054019 0.005029 9%
IIDA Improvement Plan
Slide 4

Cost Saving Indicator : Project Implemented on:


July 26, 2006

FROM TO
BACKEND INSPECTION BACKEND INSPECTION
PROCESS PROCESS

1 MS 1 1 MS 1

2 FVI 1 FVI MS1 (c o m p o ne nts/ 2 FVI 1 FVI MS1 (c o m p o ne nts/


o rie nta tio n) o rie nta tio n)

3 MS CASING 3 MS CASING

4 FVI 1 FVI CASING


(so ld e ra b ility)

5 FCT 1 4 FCT 1

Eliminate
FVI Casing
Process

IMI SSCG- Industrial Engineering Group Providing the edge in electronics manufacturing…
IIDA Improvement Plan
Slide 5

Benefits from the Improvement:

1. Eliminate unnecessary process.


2. Optimize the time of the operators.
3. It will save time and energy.
4. Increase in output.

IMI SSCG- Industrial Engineering Group Providing the edge in electronics manufacturing…
IIDA Improvement Plan
Slide 6

Cost Benefits from the Improvement:

INTEGRATED MICROELECTRONICS INC.


STANDARD & SEMI-CUSTOM GROUP
INDUSTRIAL ENGINEERING GROUP

COST SAVINGS FROM IMPROVEMENT

HPU % IMPROVEMENT (OVERALL BACKEND)


HPU HPU HPU % Computed
PRODUCT IMPROVEMENT AREA
Existing Imprv't Difference Imprv't $ Savings
IIDA
( EY Series Models ) FVI1 Process FVI Station 0.041183 0.039099 0.002084 5% 2647.52
EY26310 Simplification 0.041959 0.039875 0.002084 5% 39.67
EY26400 0.059048 0.054019 0.005029 9% 75.23

Total Savings $2,762.43


From Aug to Dec

IMI SSCG- Industrial Engineering Group Providing the edge in electronics manufacturing…
IIDA Improvement Plan
Slide 7

IMI SSCG- Industrial Engineering Group Providing the edge in electronics manufacturing…