FVI STATION
IMPROVEMENT
Trademark: Products: Prepared By:
Alminda L. Arivan
History : 1990 - Developed digital speed limiter.
1946 - IIDA was established by an 1992 - Developed digital speed limiter –
Aeronautical Engineer, Mr. Yoshihisa Ignition system integrated module.
Iida at Machida-City Tokyo Japan. 1994 - Developed DC ignition module
1948 - The company head office was For small engines.
Moved to new location of Meguro Tokyo. 1995 - Started Production at Laguna,
1951 - Mistake Plant was newly Built at Philippines.
Mitaka-City Tokyo. 1996 - Developed ESS (engine safety
1974 - Developed TCI (transistor Controlled Switch).
Ignition) system. 1997 - Started production of iron cast
1979 - Started export Sales for Oversea Flywheel and stamping parts at Chinese
customer. Partners.
1980 - Developed Hybrid IC for TCI 1999 - Developed float type oil sensor.
Systems. 2001 - Increased capacity of Philippines
1983 - Receive reward from Ministry of Laguna Production Line at IMI.
Science and Technology on IIDA 2001 - Developed ignition module for
TCI System. Emission regulation.
1988 - Developed full automatic winding 2002 - Developed ultra – small sized
Ignition Coil Machine. Ignition module.
IIDA Improvement Plan
Slide 1
Process : FVI 1
IMI SSCG- Industrial Engineering Group Providing the edge in electronics manufacturing…
IIDA Improvement Plan
Slide 3
FVI 1 (Casing) 1 2 3 4 5 6 7 8 9 10
Get unit / place under magnifying lense Total Time = 3.6070
Inspect / get twizer remove solder balls 2.94 4.61 1.59 5.97 1.93 5.1 2.65 5.56 2.44 3.28 36.0700 10 3.6070 Standard Time = 3.8880
Setaside HPU = 0.001080
UPH = 926
Recommendation:
Eliminate the FVI on casing since 52% of the inspection time the operator is
not seeing any solder balls from the units. And most of time the operator is
just handling the units for the sake that she inspected it . And the process has
a yield of 99.9% .
IMI SSCG- Industrial Engineering Group Providing the edge in electronics manufacturing…
IIDA Improvement Plan
Slide 3
CUSTOMER: IIDA
FROM TO
BACKEND INSPECTION BACKEND INSPECTION
PROCESS PROCESS
1 MS 1 1 MS 1
3 MS CASING 3 MS CASING
5 FCT 1 4 FCT 1
Eliminate
FVI Casing
Process
IMI SSCG- Industrial Engineering Group Providing the edge in electronics manufacturing…
IIDA Improvement Plan
Slide 5
IMI SSCG- Industrial Engineering Group Providing the edge in electronics manufacturing…
IIDA Improvement Plan
Slide 6
IMI SSCG- Industrial Engineering Group Providing the edge in electronics manufacturing…
IIDA Improvement Plan
Slide 7
IMI SSCG- Industrial Engineering Group Providing the edge in electronics manufacturing…