INTRODUCTION:
• Vande Bharat express also known as Train 18, is an Indian semi-high speed train
and India's first intercity electric multiple unit, a type of self-propelled engine-less
train.
• The unit cost of the first rake was given as 100crores through the unit cost is
expected to go down with subsequent production.
• It is also the first train to be designed and built entirely in India. It was designed
and built by Integral Coach Factory (ICF) Chennai under the Indian government's
Make in India Initiative over a span of 18 months.
• A train-set as the name suggests is a self propelled train like the EMU and
DEMU stock in service today.
• It has the inherent advantage of faster acceleration and turn around as compared
to a conventional train since no reversal of locomotive is required as there is a
driving cab at either end.
• This initiative by team ICF in the high speed travel will improve passenger
satisfaction and help Indian Railways reclaim its modal share in the passenger
segment.
• Normally, in abroad, they take nearly 3 to 4 years to conceive, design and develop
such new type of coaches. But, ICF has taken only 1 year for planning and design
and now the works are going on for the past 6 months.
TECHNOLOGY
• ICF has developed this technology with the help of European partners. It has a
potential to travel up to the speed at 160 kmph as against 130 kmph of Shatabdi
and would result in the travel time being reduced by around 15% once the tracks
are fit to suit Train 18's speed.
FEATURES
• Rotational seats which can be aligned in the direction of travel (available only in
the executive class)
• Disabled-friendly toilets
OTHER FEATURES
• The train set has been flagged off for an inaugural run by Prime Minister of India
Narendra Modi, on 15 February 2019, with its commercial run starting from 17
February 2019 onwards. The train broke down on its first trip on 16 February, with
officials citing brake failure secondary to striking cattle as the cause.
• It will be running on the Delhi-Varanasi route, via Kanpur and Prayagraj, connecting
the Prime minister's Lok Sabha seat to the Capital city, reducing travel time along the
route by 15 percent. The train's regenerative brakes are also expected to allow a 30%
savings in electricity costs as compared to its predecessor at an operating speed of 160
kilometres per hour (99 mph), it will outpace the Shatabdi Express by 30 kilometres per
hour (19 mph)
• Although the trainset has been tested for speeds up to 180 kph, operational speed
has been capped at 130 kph as an internal report by Indian Railways indicated that
just 0.3% of the company's track is capable of supporting speeds of that magnitude.
Every other car on the train is motorized.
• The 8 hour journey from New Delhi to Varanasi station has the base fare of
₹1,239.00 and covers the total distance of about 775 kilometers.
FUTURE
• Train 18 completed almost all the trial run conducted by the RDSO and also it
completed all the necessary test like water bottle test, stability test , high speed
test. Now it is waiting for the green signal given by the Railway safety
commissioner for running on the track.
• According its name suggest TRAIN 18, it will start its commercial journey by
the end of this month.
• According to Railway within the next Fiscal Year there will be more 5 T18 train
set expected to roll out from the ICF.
• They are also introduce TRAIN 20 in 2020 to replace RAJDHANI EXPRESS.