Download as ppt, pdf, or txt
Download as ppt, pdf, or txt
You are on page 1of 14

From PDS to SP3D

SmartPlant 3D Implementation
at Linde Engineering
From PDS to SP3D
Ralf Bellaire,
SmartPlant 3D Implementation
Rom, 11.10.2009
at Linde Engineering Division

Ralf Bellaire,
Rome, PP&M IAC 2009

THE LINDE
GROUP
Engineering
From PDS to SP3D

The Linde Group – Linde Engineering Divisions


Engineering Business Evaluation – Market
Drivers
Software Evaluation
Business Case
Implementation plan
Migration and Integration plan
Considerations and Recommendations

Linde AG Engineering Division 2 R.Bellaire / Linde Engineering/ 27.09.09


The Linde Group
Engineering Division
Product Range
— Petrochemical plants
— Polyolefin plants
— LNG plants
— Natural gas processing
plants
— Gas processing plants
— Hydrogen- and
synthesis gas plants
— Adsorption plants
— Air separation plants
— Cryogenic plants
— Biotechnological plants
— Manufacturing of plant
components and
modules

Linde AG Engineering Division 3 R.Bellaire / Linde Engineering/ 27.09.09


Engineering Division
Engineering Offices and Research
Facilities
—The engineering offices
and research facilities are
located at Pullach about
10 km south of Munich

—The office buildings


comprise a floor space
of 41,000 m² and
offices for more than 2,060
engineers and other
specialists

Linde AG Engineering Division 4 R.Bellaire / Linde Engineering/ 27.09.09


Plant Design disciplines

Piping Material

Plant Layout & Piping Design

Piping Stress Analysis

Civil Engineering

Structural Engineering

CAE 3D Plant Design

Linde AG Engineering Division 5 R.Bellaire / Linde Engineering/ 27.09.09


Engineering Business Evaluation
Market Drivers

Customer driversBusiness drivers

Linde vision

Linde AG Engineering Division 6 R.Bellaire / Linde Engineering/ 27.09.09


Engineering Bussines Evaluation
Market Drivers

inde Engineering Vision – Step change in productivity

With PDS, we have reached a point, where no further


productivity increases are possible
We face strong competition with low cost engineering
centers

 Integrated Engineering and design solutions


 Effective re-use of design data
 Effective global engineering functionalities
 Rule driven design and design automation
 Integrated workflow and data management

Linde AG Engineering Division 7 R.Bellaire / Linde Engineering/ 27.09.09


Pre-designed Assemblies for Smart
Plant 3D
Starting Point: P&ID Macros

n C l a ss
Desig  Operability/Maintainability
 Availability/Reliability
 Safety
8
Linde AG Engineering Division 8 R.Bellaire / Linde Engineering/ 27.09.09
Software Evaluation

Jan Dec Apr Jan Aug Apr


2001 2005 2006 200 2007 2008
7

IT Project
Technology Preview Productivity initiatives
„Evaluation of SP3D

Test and evaluation report:


 test results
 shortcomings
 missing functionality
 estimation of the implementation costs

Linde AG Engineering Division 9 R.Bellaire / Linde Engineering/ 27.09.09


Business case
Benefits,Expected Savings and
Quality
Benefits: Integrated tools, improved data management, concurrent engineering
opportunities
Expected Savings
PDS PDS

Custom commands PID & PSA Integration

Improvement in Drawings tasks CAD pipe class generation

Integration of 3rd party applications Data Re-use

View handling Improved modification functionalities

Piping modeling task


Administration
Structural modeling tasks
Common tasks / areas Civil modeling tasks Specific tasks / areas

SP3D Productivity prospects SP3D Productivity prospects

Quality: Improved tracking , monitoring , revision and knowledge management


capabilities
Linde AG Engineering Division 10 R.Bellaire / Linde Engineering 27.09.09
Implementation plan

1Qt 2Qt 3Qt 4Qt 1Qt 2Qt 3Qt 4Qt


2009 2009 2009 2009 2010 2010 2010 2010

Project & catalogue set up, Migration & Interfaces

Blue Print User training

Pilot project

Evaluation

“go or no go”
decision
Improvement phase
Key Success Factors
1st project
 Strong support from management (especially in difficult times)
 Detailed implementation plan
 Integrated team concept
 Detailed training plan
 Detailed deployment plan
Linde AG Engineering Division 11 R.Bellaire / Linde Engineering 27.09.09
Migration plan

 Migrate Marian database to Smart Plant Reference Data

 Integratation of Orbiter (3D conceptual layout)

 Migrate all plant design Linde utilities and catalogues

Linde AG Engineering Division 12 R.Bellaire / Linde Engineering 27.09.09


Integration plan – Phase 1

SPRD Orbiter

Material DB
Integration Platform
SPPID
IsoManager

Document
Control
Process Equipment
Workbench
SP Review

Pipe Stress Structural Analysis Fabrication model

Intergraph 3rd party application Linde application


Linde AG Engineering Division 13 R.Bellaire / Linde Engineering 27.09.09
Consideration and
Recommendations

Considerations Recommendations

 Significant change for users groups  Release mature software


versions
 Training (e-learning & class room)
 Don’t dismiss valuable PDS
 Work share concepts functionality!
 Compensate shortcomings of
Define workflow for SP3D with consultancy
data management & control  Bring the customers together
to push concerted evaluations
 Suitable deployment strategy
and developments.
 Join EPC contractor in
converting PDS into SP3D

Linde AG Engineering Division 14 R.Bellaire / Linde Engineering 27.09.09

You might also like