Tugas PE-2201 - Perhitungan Material Balance Part 1

You might also like

Download as pptx, pdf, or txt
Download as pptx, pdf, or txt
You are on page 1of 7

PE-2201: Teknik Reservoir I

Tugas Kuliah – Material Balance


Jakarta, 19-20 Maret 2020

© 2015 Chevron Corporation


Assignment Guideline

 This is individual assignment. You can discuss with your coulleague.


 Pleaser Work systematically in MS Excel Spreadsheet. ( On 1 file)
 File Name: Class_ Tugas MATBAL_Your Name_NIM
i.e. PE1_Tugas MATBAL_Andra Simprug_101630012
 Subject Email: Same As File Name
 Submit to: arudiyono@gmail.com
 Due Date : Friday, 27 March 2020. ( Latest at 23.59 o’clock)
 Delay in collection will be penalty. 10 point per 1 day delay.

2
Problem 1 – Solution
Gas Drive Reservoir
(P>Pb) Volumetric
Average
Pressure
No. of
Producing
Wells
Bo
(bbl/STB)
Np (MSTB)
Wp
(MSTB)

3685 1 1.3102 0.000 0.000


3680 2 1.3104 20.481 0.000
3676 2 1.3104 34.750 0.000
3667 3 1.3105 78.557 0.000
3664 4 1.3105 101.846 0.000
3640 19 1.3109 215.681 0.000
3605 2 1.3116 364.613 0.000
3567 36 1.3122 542.985 0.159
3515 48 1.3128 841.591 0.805
3448 59 1.3130 1273.530 2.579
3360 59 1.3150 1691.887 5.008
3275 61 1.3160 2127.077 6.500
Hint: 3188 61 1.3170 2575.330 8.000
1. Prepare tabulation for all pressure condition.
Volumetr ic No. of
Bo Np Wp Eo Ef,w
Average Pr od ucing F (MSTB) DP (Psi) Eo+Ef,w F/(Eo + Ef,w)
(bbl/STB) (MSTB) ( MSTB) ( bbl/ STB) (bbl/STB)
Pressure Wells
3685 1 1.3102 0.000 0.000
3680 2 1.3104 20.481 0.000
3676 2 1.3104 34.750 0.000
3667 3 1.3105 78.557 0.000
3664 4 1.3105 101.846 0.000
3640 19 1.3109 215.681 0.000
3605 2 1.3116 364.613 0.000
3567 36 1.3122 542.985 0.159
3515 48 1.3128 841.591 0.805
3448 59 1.3130 1273.530 2.579
3360 59 1.3150 1691.887 5.008
3275 61 1.3160 2127.077 6.500
3188 61 1.3170 2575.330 8.000

2. Plot F vs (Eo + Efw). Determine OOIP (MMSTB)

3
Problem 2 – Gas Cap Drive
Reservoir at Saturated
Condition
A Saturated oil reservoir with no water drive contains as initial gas cap above the oil column. The
following production and pressure history data and other reservoir characteristics are given below.
Production Data
Initial Solution Gas-Oil Ratio 780 SCF/STB
Initial Reservoir Pressure 2920 Psia Time, Np, WP, Bt, Cum GOR,
P, Psia Bg, RB/STB
Bubble Point Pressure (Pb) 2920 Psi Days MSTB MSTB RB/STB SCF/STB
Bw 1 bbl/stb 0 2920 0 0 1.454 0.954  
Assumed Initial Solution Gas-Oil Ratio still the same until P@1220 Psia 182 2740 4120 12 1.473 1.004 945
455 2560 8320 127 1.501 1.072 1148
Therefore Rsi = Rs
820 2300 12710 408 1.552 1.194 1601
1270 2050 17120 772 1.63 1.347 2011
1817 1800 21600 1137 1.757 1.55 2418
Hint: 2455 1500 26310 1481 1.956 1.905 2793
3185 1220 31200 1971 2.276 2.39 3132
1. Prepare tabulation for all time and pressure
condition.
Volumetric
Average Bt Bg Rp, Wp Eo
Time, Days Np (MSTB) F (MSTB) Eg (RB/MCF) F/Eo Eg/Eo
(RB/STB) (RB/MCF) SCF/STB (MSTB) (bbl/STB)
Pressure
0 2920 1.4540 0.9540 - -
182 2740 1.4730 1.0040 945 4,120 12

2. Plot F/Eo vs Eg/Eo. Determine OOIP (MMSTB) and Gas Cap Volume (BCF).

4
Problem 3 – Solution Gas
Drive Reservoir at Saturated
Condition
Use the following production and PVT data to estimate the original oil in place for given saturated oil
reservoir which does not contain an initial gas cap and water drive. The water production is
negligible. Initial Solution Gas-Oil Ratio 721 SCF/STB.
Production Data
Hint:
1. Prepare tabulation for all time and pressure Time Np, Bt, Bg,
Cum
GOR,
condition. Code MSTB RB/STB RB/STB
SCF/STB
2. Use graph method to determine OOIP (MMSTB) 1 0 1.498 1.048  
2 1882 1.523 1.155 725
3 4976 1.562 1.280 738
4 7292 1.621 1.441 809
5 11126 1.701 1.634 1012
6 12858 1.817 1.884 1223
7 15501 1.967 2.206 1424
8 16016 2.111 2.433 1561
9 17394 2.251 2.654 1695

5
Problem 4 – Water Drive
Reservoir at Saturated
Condition
The material balance parameters, the underground withdrawals F, and Oil expansion Eo of a
saturated oil reservoir ( i.e. m= 0) are given below:

Production Data

P average, Psia F, MSTB Eo


3500 0 0
3488 2.04E+06 0.0548
3162 8.77E+06 0.1540
2782 1.71E+07 0.2820

Hint:
1. Prepare tabulation for all time and pressure condition.
2. Use graph method to determine OOIP (MMSTB)

6
Have a Fun Work

You might also like