PETRONAS METHANOL LABUAN

Department: Offsite Section, Plant 2

Unit-500 Water Treatment Plant

Objective:
To learn and understand the process of
water treatment plant (U-500)
Industrial training Plan
Weeks Plan

1 Introduction to Petronas Methanol Labuan

2 Dual Media Filter

3 Ultrafiltration

4 Reverse Osmosis

5 Electro-deionizer

6 Evaluation

7 Mini Assignment

8 Methanol Synthesis

9 Overall Process Plant

10 Presentation
Activities
Activities Frequency
• Taking samples Daily
• Taking Reading Daily
• DMF Backwash Monday, Wednesday, Friday
• UF CIP When needed
• Lock out tag out (LOTO) If there is maintenance work to be
done
• Biomate Injection Daily
• Heterotrophic bacteria Total Weekly
Count
• Meeting Daily
• Area Owner Team (AOT) Once a month for each group shift
• Mutik-mutik Every week (Monday)
• Others Taking the flow rate of lube oil cooler,
Methanol loading, EDG test run,
Nitrogen loading, line up checking,
swing over pump, HSE Audit, pH
analyser calibration