PROJECT EXECUTION PLAN

BTC SUMMIT HOTEL


ARCHIPELAGO BUILDERS

JANUARY 24, 2020


PROJECT EXECUTION PLAN
• Purpose (to indicate the purpose of PEP)
• Scope (to indicate the scope of your PEP)
INSERT YOUR LOGO
HEREE
BTC SUMMIT
HOTEL
BRGY. BULIHAN, MALOLOS,
BULACAN
Perspective

• Insert Project Perspective


Project Information
(Example) INSERT YOUR
Project Name : BTC SUMMIT HOTEL LOGO HERE
Project Location : BRGY. BULIHAN, MALOLOS, BULACAN
Project Code :

Gross Floor Area : M2


Mall Leasable Area : M2
Mall Common Area : M2

On-site Parking : NOS.


Motorcycle Parking : NOS.

Total Project Cost :

Target Start Date :


Target Completion Date :
Project Duration : 18 MONTHS

Design Consultant :
Vicinity Map
INSERT YOUR
LOGO HERE
Site Development Plan
INSERT YOUR
Please refer to the checklist LOGO HERE
Traffic Flow and Access
INSERT YOUR
LOGO HERE
• Show traffic impact analysis relative to existing
area and show access for vehicular and human
traffic
Towe Crane and Equipment
Logistics
INSERT YOUR
LOGO HERE
• Indicate tower crane type, radius, lifting points, tip
loads, restrictions and capacity and other location of
equipments such as but not limited to line pump,
batching plants etc.
Milestone Dates
INSERT YOUR
LOGO HERE
• Showing Target Start and Finish of Each Milestone dates
Ex.
• Bldg. Permit Acquisition
• Bulk Excavation
• Test Pile
• Pile Driving
• First Pouring
• Structural Topping-off
• Watertightness
• Handover of spaces
• Energization
• Testing and Commissioning
• Project Completion
Risk Management
INSERT YOUR
LOGO HERE
• Show risk management (Risk
description,source, risk, current control
measures, current risk level (probability,
impact/severance, grade, rating)
Safety Plan
INSERT YOUR
LOGO HERE
• Discuss Safety plan including but not limited to HSE programs,
excavation, OPS, fall protection, MEPFS utilities, waste management,
site security, site branding in conjunction with RLC-CCM Approved
Safety Program.
Quality Plan
INSERT YOUR
LOGO HERE
• Discuss proposed Quality plan in conjunction
with RLC-CCM Approved Construction Quality
Plan
Table of Organization
INSERT YOUR
LOGO HERE
• Input approved table of organization
Floor Plans
INSERT YOUR
LOGO HERE
• Input architectural plans
Zoning Plan
INSERT YOUR
LOGO HERE
• Indicate Zoning plan showing sequencing of rebar,
formworks and concreting per zone, per area and per
level.
Overall Concrete and Reinforcing Bar
Requirement
INSERT YOUR
LOGO HERE
• Show graphical presentation for each and every month requirement
of concrete and rebar from start to finish
Overall Manpower
Requirement
INSERT YOUR
LOGO HERE

• Show graphical presentation for each and every month requirement


of manpower Such as carpenter, mason, steelmen, labors, and also
the staff allocation per month in a different slide from start o finish
General Timeline
INSERT YOUR
LOGO HERE
• Indicate tabulated general timeline schedule including
other trade works
S-Curve
INSERT YOUR
LOGO HERE
• Input S-Curve
Procurement Schedule
INSERT YOUR
LOGO HERE
• Input approved procurement schedule
Handover Schedule
INSERT YOUR
LOGO HERE
• Show Highlighted keyplan for handover of schedule
per area/zone for Leasable spaces, front of the
house (FOH) and back of house (BOH)
Construction Methods /
Technologies
INSERT YOUR
LOGO HERE
• Indicate construction methods and methodology list
or technologies to be used in construction. Include
value engineering and innovations
Disturbance and
Environmental Mitigation INSERT YOUR
LOGO HERE
Plan
• Indicate disturbance plan to mitigate disturbance to
neighboring and/or existing communities and
environmental protection measures
Design Management
INSERT YOUR
LOGO HERE
• Indicate design management and communication
(workflows, timetable and communication)
Communication Plan
INSERT YOUR
LOGO HERE
• Indicate design management and communication
(workflows, timetable and communication)
RASCI (Responsibility Matrix)
INSERT YOUR
LOGO HERE
• Responsible, Accountable, Support, Consult and
Inform