Professional Documents
Culture Documents
GP NIKOLIC Presentation (1) 2020
GP NIKOLIC Presentation (1) 2020
We are on a mission to
design and build long- Structure Design Concrete Structures Turn-key projects
lasting structures of
service to the individuals
that drive the economic
advancement and the
society at large.
Equipment Rental Concrete Sales Transportation
Mobile cranes: Liebherr - 60t, Sirakuza - 45t, Metalna - 40t, Jones - 35t, Metalna - 30t, Lokomo - 25t, OK - 25t, Coles – 16t,
Bendini - 15t, Coles - 5t. Tower cranes: Lifting 3 and 8 tons.
Earthmoving, lifting and transportation machinery: Telescopic handler, Backhoe Loader, Bulldozer, Crawler excavator,
Machinery Wheel Excavator, Loader, 2 Concrete mixing trucks 6 and 10m³, 3 Heavy-duty Trucks, 3 Trailers, Tipper truck, 2 pickup
trucks, Passenger bus 55 seats, Passenger mini-bus 12 seats, 12 cars. Other: 03 power generators.
Concrete: 2 Concrete plants – cumulative capacity of 65m³ concrete per hour. In-house concrete quality testing lab
GP NIKOLIĆ
endorsed and controlled by IMS Institute, Belgrade. Ratinska 15, Kraljevo 36000
Tel: +381 36 316 730
Concrete Construction & Engineering www.gpnikolic.com
Structural Design
• We design Bridges, Viaducts, Industrial buildings, Commercial buildings, and Residential buildings
including pre-stressed and post-tensioned structures.
• Licensed experienced team of designers developing creative, pragmatic and efficient solutions
• Use of advanced software Autodesk Architecture Engineering & Construction Collection suite which
includes 40 software components (among others Revit and AutoCad), Tower, and Arm CAD to design and
test structural solutions virtually.
• With our collected experience of three decades we continue to improve our ability to design stable,
durable, elegant and economic buildings in all conditions.
1. Corporates
1. Governments 2. Infrastructure Sponsors 1. Small Businesses
Clients 2. NGO-s 3. Financial Institutions 2. Individuals
3. Other Construction Companies 4. State-owned enterprises
We are continuously
working process
improvement and
automation.
This turn-key
project was
completed in 2012
8.050 m2.
-I phase 5000 m2 in
2017.
-II phase 5000m2 in 2019
-I phase 2000m2
completed in 2017
-II phase 2000m2
completed in 2019