Consolidation project-VI
Installation Guideline
VI Frequency Band
B1= 2100
B3= 1800
B0/B0A =900
B40= 2300
B41= 2500

Ericsson Internal | 2018-02-21


U ’
N
I O R
R I R 8
CP CT O 41 BASEBAND 6630 (4G) LTE CPRI PORTS
E
N D T 9, 4
N N 1
O
C BA 22
S E 3,
BA 444
L23/L25 L2300+L25
L18/L21 L900 00
RRU 4418
DATA
1 Sec
1800 + 2100 1800 + 2100 1800 + 2100 3
RRU 4443 RRU 4443 RRU 4443
Sec DATA DATA
Sec Sec DATA 900 900 900
1 2 3
RRU2219 RRU2219 L2300+L25
RRU2219
00
DATA DATA DATA RRU 4418
Sec Sec Sec
1 2 3 DATA
1 Sec
G9 / U9 2
G18 /
U21
B1 =
2100 L2300+L25
B3 = 00
RRU 4418
1800
B0 / B0A =900 DATA
Sec
BASEBAND 6630 (3G) G+W CPRI B40 =
1
1
PORTS
Ericsson Internal | 2018-02-21
2300
B41 =
NS
E C TIO ’S BASEBAND 6630 (4G) LTE CPRI PORTS
NN O RRU
CO
I DT 418
CPR EBAN US, 4
R
BAS 19, R
2 2

L1800 L23+L25 L9
L2100
TDD UBR 4418
L2100
L2300+L2500
Sec
3
RRUS12 B1
(U2100) RRU2219/RRUS
(G900 & U900) RRUS14 /2219 B3 Sec
(L2100) 2
(G1800) & L1800
Sec
Sec Sec Sec Sec Sec Sec Sec Sec 1
1 2 2 Sec
3 1 3 1 2
3

G18 + L18
G9 + U9 U =3G (2100+900)
U2100
G=2G (900 + 1800)
L=4G (1800, 2100, 2300, 2500,
900)
BASEBAND 6630 (3G) G+W (2G+3G)
Ericsson Internal | 2018-02-21
CPRI
PORTS
Jumper Connections on Antenna ports - Each S

RRUS12 B1 TDD UBR 4418 RRUS14 /2219 RRU2219 RRUS


U2100 & L2300+L2500 B3 (G900 & U900) (G900 & U900)
Ericsson Internal | 2018-02-21
L2100 G1800 &
m
l ar
r, A
we
P o
C
n, D on s GPS
s io cti GPS ANT. to earth
i s ne
n sm con
Tra ½’”feeder cable
S, N-male connector to
GP ½” feeder to
earth
prepare on both end

N-Female to SMA
male 1.5mtr pre feb
jumper
-48V DC MCB BOX TSR951339/1500
Baseband
earthing point Patch cord to connect GPS receiver
with SFP in TNC port
16 or
32A Existing TXN Equipment 2nd BB6630 (3G) Sync port SAU
Baseband Power cable with
Alarm
one side pre-feb.connector
RPM 1136127 GPS SYNC cable extension
Optical Port Electrical Port
kit
TNA TNC

BASEBAND 6630 (4G) LTE CPRI PORTS


Ericsson Internal | 2018-02-21
Preparation – power connector

DC power connector assembly must be according to the instructions that are delivered with the DC
power connector.
Ensure that the cable shield is properly connected in the DC power connector.
Ensure that the wires are connected to the correct polarities.

Ericsson Internal | 2018-02-21


RRUS02/RUS02 B0 Connectivity

Ericsson Internal | 2018-02-21


Connectivity for UGL900 Configuration Each Sector

RF Ant Ports  2 CPRI each from LTE and


900 Band
WCDMA BB for UGL900
Config
 RX Diversity Cable to be
RRUS0
RRUS0 used between both radio
2
2  RRUS02 cascading not to be
used for UGL900
U900+G900 Config for
W+G
DATA DATA

RX Sector L900 L900


Sector U900 G900 U900 Diversity
Sec1 D N L900 Sec1 G N
Jumper
Sec2 E P L900 Sec2 H P
Sec3 F Q Sec3 J Q
G900

BASEBAND 6630 (3G) G+W CPRI BASEBAND 6630 (4G) LTE CPRI
PORTS
Ericsson Internal | 2018-02-21 PORT
Connectivity for UGL900 Configuration Each Sector
RF Ant Ports  2 CPRI each from LTE and
900 Band WCDMA BB for UGL900
Config
 RX Diversity Cable to be
used between both radio
DATA DATA  RRUS02 cascading not to
be used for UGL900
U900+G900 Config for
W+G
L900

Sector U900 G900 U900 Sector L900 L900


Sec1 D N L900 Sec1 G N
Sec2 E P Sec2 H P
Sec3 F Q Sec3 J Q
G900

BASEBAND 6630 (4G) LTE CPRI


Ericsson Internal | 2018-02-21
BASEBAND 6630 (3G) G+W CPRI PORT
PORTS

You might also like