BROOKFEILDS CASE

STUDY
BUILDING SERVICES-3
# Brooke fields is a shopping mall located on
Brooke bond Road (Krishnasamy Road) in
Coimbatore, India.
# It was opened in 2009.
# It Contains of 4 Floors.
# Retail area : 450,000Sq.ft
…..
SERVICES:
GENERATOR
ROOM
TRANFORMER
S(SUBSTATION
)
ELECTRICAL
ROOM
COOLING
ELECTRICAL ROOM:
TRANSFORMER
ROOM(substation):
 Consistes of 3 ELECTRICAL PANEL ROOM:
tranformers. Feed from the substation.
Panels of 440v capcity
 Located in the
basement.
 Powered by the main
GENERATOR
ROOM:
 THERE ARE 6 GENERATORS
 1 AMONG THEM IS A SOLO GENERATORS
AND THE OTHERS ARE SINK.
 EACH OF 1010KV CAPACITY
 EACH GENERATOR WITH 990L CAPACITY
DIESEL TANK.
 THERE IS A 2000L UNDERGROUND TANK
FROM WHICH EACH GENERATORS TANKS
ARE FED
 GLASS WOOL IS PROVIDED AS AN
ACOUSTIC MATERIAL IN ORDER TO TRAP
SOUND AND HEAT.
 EARTHING IS PROVIDED.
 HEIGHT OF THE CEILING 18 FEET.
INFERENCE:
 Ramp should be
provided
 Door sizes should be
appropriate to the
generators sizes.
 Pathway should be
minmum 5 m
 Proper air ventilators to
be provided.
 No proper ventilation.
 AC should not provided.
 Ceiling height should be
18feet.
HVAC:
 THERE ARE 4 CHILLERS ON TOTAL.
 3 ARE USED AND 1 IS STAND BY
 THE AC CAPACITY OF THE MALL IS 3000
TONE AND ON SUMMERS ITS MORE.
 COOLING TOWER IS PRESENT IN THE
TOP OG THE DG ROOM
 ON SUMMERS THE CAPACITY
INCREASES AND THE STAND BY
CHILLER IS ALSO USED
 SHOULD PROVIDE APPROPRIATE
ACCESS FOR THE CHILLERS TO BE
FIXED INSIDE THE BUILDING.
FIRE SAFETY:
 HAS DG BACK UP IN CASE OF
FIRE
 SUMP IS PROVIDED ON TOP OF
THE CONTROL ROOM
 3 LINES ARE PROVIDED
 FOR SPRINKLERS,HYDRANT AND
DG
 ALL THE CONNECTION,PUMPS
ETC ARE CHECKED ON DAILY
BASIS.
 WET RISER IS PROVIDED ON ALL
THE FLOORS FOR EVERY 30M
 WET RISER IS ALSO PROVIDED IN
THE COMPOUND WALLS FOR
EVERY 30M
 THE RATIO FOR SPRINKLERS IS
1:100sqft
FIRE SAFETY:
 HAS DG BACK UP IN CASE OF
FIRE
 SUMP IS PROVIDED ON TOP OF
THE CONTROL ROOM
 3 LINES ARE PROVIDED
 FOR SPRINKLERS,HYDRANT AND
DG
 ALL THE CONNECTION,PUMPS
ETC ARE CHECKED ON DAILY
BASIS.
 WET RISER IS PROVIDED ON ALL
THE FLOORS FOR EVERY 30M
 WET RISER IS ALSO PROVIDED IN
THE COMPOUND WALLS FOR
EVERY 30M
 THE RATIO FOR SPRINKLERS IS
1:100sqft
BY:
VARSHINI ,
VISHNU PRASATH,
NANDHA KUMAR,
KISHORE S,
PRANUJA &
THAMARAI KANNAN.