Professional Documents
Culture Documents
Akshay Patra Om2 by Paras 1
Akshay Patra Om2 by Paras 1
PRESENTED BY
PARAS BAGDE 16PGP099
NIKITA PENDSE 16PGP096
. From this simple, yet heart breaking incident, came the determination
that: No one within a ten mile radius of our center should go hungry.
&
•Then MR sacks are transported into stores at second floor and retrieved
as needed by preprocessing section
• These containers are moved over slotted conveyors and sealed with lid
• Then the packed sambar containers are moved to loading bins through
roller conveyors
What would be the throughput time for the production of rice and sambar
in the cooking section?
Throughput Time for Rice Preparation
Now consider the instance where eight rice cauldrons and eight sambar
cauldrons are available. Within the operating times of the cauldron, how
many containers of rice and sambar would it be possible to produce in a
day?
Rice containers