Download as pptx, pdf, or txt
Download as pptx, pdf, or txt
You are on page 1of 13

FACH Congestion Solution (Result) –RNC Wisma Mulia

Huawei NPI Team-15th Jan

HUAWEI TECHNOLOGIES CO., LTD.


Summary

 We take action to switch the FACH User Number from 30 to 60 on 11th J


an .
 There is a significant increase on FACH User Number ;
 For PS and HS Drop call rate decreased, CS drop call rate maintained
.
 For Cell Update Success Rate improved .
 For VS.FACH.DTCH.CONG.TIME increased .

Microsoft Excel
¹¤×÷±í

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 22
FACH User Numbers
1. Total trend from 4th to 14th 2. Include working days and weekend days
6th VS 13th , 7th VS 14th

3. Conclusion : after we modify the parameters , there is a significant improvement on FACH User Numbers .

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 3 Page 3
FACH Utilization

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 44
Cell Update Success Rate
2. Include working days and weekend days
1. Total trend from 4th to 14th
6th VS 13th , 7th VS 14th

3. Conclusion : after we modify the parameters , there is a significant improvement on Cell Update success Rate.

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 5 Page 5
CS Drop Call Rate(%) 2. Include working days and weekend days
6h VS 13th , 7th VS 14th
1. Total trend from 4th to 14th

3. Conclusion : after we modify the parameters ,the CS drop call rate maintained.

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 66
CS Drop Call Times
2. Include working days and weekend days
6h VS 13th , 7th VS 14th
1. Total trend from 4th to 14th

3. Conclusion : after we modify the parameters ,the CS drop call times maintained.

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 77
RAB Drop Call (PS)
2. Include working days and weekend days
6h VS 13th , 7th VS 14th
1. Total trend from 4th to 14th

3. Conclusion : after we modify the parameters ,the PS drop call rate decreased .

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 8 Page 8
Drop call times (PS)
2. Include working days and weekend days
1. Total trend from 4th to 14th 6h VS 13th , 7th VS 14th

3. Conclusion : after we modify the parameters ,the PS drop times decreased .

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 99
Drop Call HS
2. Include working days and weekend days
1. Total trend from 4 to 14
th th 6h VS 13th , 7th VS 14th

3. Conclusion : after we modify the parameters ,the HS drop call rate decreased .

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 10 Page 10
Call Drop times (HS)
2. Include working days and weekend days
1. Total trend from 4th to 14th 6h VS 13th , 7th VS 14th

3. Conclusion : after we modify the parameters ,the HS drop call times decreased .

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 11
11
VS.FACH.DTCH.CONG.TIME(S)
2. Include working days and weekend days
1. Total trend from 4 to 14
th th 46h VS 13th , 7th VS 14th

3. Conclusion : after we modify the parameters ,the VS.FACH.DTCH.CONG.TIME increased

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 12 Page 12
Thank you

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 13
13

You might also like