Final Bidding Proposal: CE 505 - Construction Methods and Project Management 2 Sem 2018 - 2019
Final Bidding Proposal: CE 505 - Construction Methods and Project Management 2 Sem 2018 - 2019
Cover Pages
Part 1: Company Profile
Part 2: Cost Estimates
Part 3: Scheduling
Part 4: Attachments
Cover Pages
Title Pages
Final Bid Proposal Checklist
Table of Contents
Invitation to Bid
Final Bid Proposal Summary
PART 1: Cost Estimates
1) Final Cost Proposal Summary
2) Detailed Quantity Estimates
3) Quantity Computation
4) Summary of Unit Prices
5) Materials Unit Price Analysis
6) Prices of Commercial Materials
7) Labor Unit Price Analysis
8) Equipment Rental Rates
9) Labor Crew Summary
10) Labor Crew Breakdown
Part 2: Scheduling
1) Work Breakdown Structure
2) Network Logic Table
3) PERT-CPM
4) Gantt Chart
5) S-Curve
6) Cash Flow
7) Manpower Schedule
8) Equipment Utilization Schedule
Part 3: Attachments
1) Architectural Plans
2) Structural Plans
3) Mechanical Plans
4) Electrical Plans
5) Fire Protection Plans
6) Plumbing and Sanitary Plans
7) Construction Methodology
8) Construction Health and Safety Program
9) Construction All Risk Insurance
COST
ESTIMATES PART 1
LABOR CREW BREAKDOWN
SHOWS:
The composition of each team / band / group
The rate per hour and equivalent daily bare rate
AIM:
Tocompute the Cost per Labor-Hour (Php/LH)
each team
PART 1: COST ESTIMATES
Final Cost Proposal Summary
SHOWS:
The Summarization of the multiple-page Labor Crew Breakdown
The Cost per Labor-Hours (Php/LH) of each team broken down
previously in the Labor Crew Breakdown
Description of each team, which activity they are to be assigned
AIMS:
To summarize in 2 page or less the computed Cost per Labor-Hour in
Labor Crew Breakdown
PART 1: COST ESTIMATES
Final Cost Proposal Summary
The
computation of Labor Unit Price per Unit
Quantity
Output example in this section of the Bid,
Pesos per kg,
Pesos per sqm,
pesos per cubic meter
PART 1: COST ESTIMATES
Final Cost Proposal Summary
SHOWS:
deliverable-oriented breakdown of a project into smaller
components.
project deliverable that organizes the team's work into
manageable sections.
Pointers:
Elaborated thru type of work and location
It could be in diagram form or bullet form
u l in g
ch e d
2 : S
T
Cash
PAR Manpower
&
S-Curve Flow
Gantt Equipment
PERT- Chart Schedule
Network CPM
Work Logic
Breakdown Table
Structure
NETWORK LOGIC TABLE
This is the table that shows the predecessor and/or successor of each
specific activity broken down in the WBS shown previously
It also shows the duration in each activities that are taking part in which
every duration was computed using the quantity computed in the cost
estimates multiplied by the quantity accomplishment in every unit duration
(e.g. sq.m per day)
u l in g
ch e d
2 : S
T
Cash
PAR Manpower
&
S-Curve Flow
Gantt Equipment
PERT- Chart Schedule
Network CPM
Work Logic
Breakdown Table
Structure
PERT – CPM
PAR Manpower
&
S-Curve Flow
Gantt Equipment
PERT- Chart Schedule
Network CPM
Work Logic
Breakdown Table
Structure
GANTT CHART
PAR Manpower
&
S-Curve Flow
Gantt Equipment
Schedule
PERT- Chart
Network CPM
Work Logic
Breakdown Table
Structure
S-CURVE