Figure 12
How geological structures influences
mining excavations
How geological structures influences
mining excavations
How geological structures influences
mining excavations
How geological structures influences
mining excavations
How geological structures influences
mining excavations
24 Level – 27 Level
How geological structures influences
mining excavations
How geological structures influences
mining excavations
How geological structures influences
mining excavations
How geological structures influences
mining excavations
How geological structures influences
mining excavations
How geological structures influences
mining excavations
How geological structures influences
mining excavations
Figure 4
How geological structures influences
mining excavations
Underground
How Stability
geological structures influences
mining excavations
Underground
How Stability
geological structures influences
mining excavations
31
may be present from ~15m to ~31m, water stop and
ground consolidation/improvement grouting may be
necessary for the headgear foundations.
How geological
structures influences
mining excavations
Insert: Plan showing
the location of KN111
relative to the Main
and Vent Shafts
507m ~400m
OS1 Orebody
975m ~920m
Kafufya Formation Water stop grouting may most probably
575m ~630m be required for the conglomerate units between the
1550m ~1550m sandstone bands should the shafts be extended to below the
orebody.
How geological structures influences
mining excavations
How geological structures influences mining excavations
Grout hole drilling sequence and The split space method drilling and
layout for the 10m Shaft grouting sequence to be carried out i.e.
Strike and dip drilling and grouting of grout holes GH1,
direction of the GH2, GH4, GH6 and GH8 first to
water bearing
completion followed by GH3, GH5, GH7
strata planes.
and GH9 also grouted to completion.
GH1
Grout holes GH1 and GH2, which are adjacent to
each other and initially drilled and grouted, to be
GH9 GH2 positioned on the down dip side of the water
bearing strata due to the path of greatest resistance
to the grout flow that will be in the down dip
direction along the water bearing strata planes.
SP1 SP2
GH9 GH2
6m
SP1 SP2
3m
SP3
SP9
GH8 CH1 GH3
11m excavated shaft diameter
3m
SP8 SP4
CH2
SP5
SP7
SP6 GH4
GH7
GH6 GH5
A
36m
6m