Design of Offshore Structures - 10 - 01 - 2008
Design of Offshore Structures - 10 - 01 - 2008
+ $$
Screening of
Planning of Production and
opportunities. Preparation of Feasibility studies Project ececution Abandon-
exploration maintenance
bid for blocks Concepts screening (Field deveopment) ment
Strategy and operation operations
selection
Production and
If acceptable NPV,
transportation of
deliverable is:
oil and gas.
Preparatory work for Plan for Development
licence rounds and operation
Stopping
production
Detail engineering
Construction, fabrication Platform
Planning of drilling,
and installation. removal
performing drilling
Comissioning and start-up
3
Screening of
Planning of Production and
opportunities. Preparation of Feasibility studies Project ececution Abandon-
exploration maintenance
bid for blocks Concepts screening (Field deveopment) ment
Strategy and operation operations
selection
Income
2 – 3 years 5 – 80 years
* Cost: Area under red curve, CPV (present value for total cost)
* Income: Area under green curve, IPV (present value for total income)
Screening of
Planning of Production and
opportunities. Preparation of Feasibility studies Project ececution Abandon-
exploration maintenance
bid for blocks Concepts screening (Field deveopment) ment
Strategy and operation operations
selection
Concept(s) selection
An important part of the plan for Development and Operation
• Our work is to know how to establish the environmental loads, permanent loads and functional loads and
ensure that the structure can withstand these loads with margins required by rules and regulations.
JA:
* Limit state control regarding structural response.
• DNV:
* Introduction to Sesam – a very much used program for load predictions and strctural response calculation.
8
Load, Capacity
Probability
density
External
Capacity and
fatigue
response
load Typical situation for
fatigue assessments