Project Controlling Techniques Employed in Project Contracting Firm
Project Controlling Techniques Employed in Project Contracting Firm
On
Presented
By
Dhruva Shah (73)
List of Activities
Piping
to be perform Color
Color on
on wall
wall Past
Past
Piping of
of the
the house
house control
control
Plastering
Electric
Electric Electric
Electric Possession
Possession
work work
Fire alarm Elevator to
to customer
customer
work work
Cost Structure
Fixed Expenses
Cost of land 8000000
Architect fees 100000
Engineer fees 50000
Government charges 68000
TOTAL 8218000
Other Expenses
Payment to suppliers 2500000
Labor contractor 1000000
Electrician 200000
Payment to pest control 34000
Payment to plumber 167000
Elevator 300000
Carpenter 40000
TOTAL 4241000
TOTAL COST 12459000
ESTEMATED COST 13500000
Cost Control Sheet
Time
Costs Quality
Labor
Cost control- availability of raw material required
To find best resources
●
i.e. supplier of different material that used wooden, paint etc.
For finding supplier of lower cost with good quality they go for
●
Bidding
●
Ask for the price list of different supplier for comparison
●
Go by reference of friends or by other builder
For e.g.
• They buy all marbles from Ambaji even though it will incur r
transportation cost it has very good quality and n less expensive.
• For electrician they did contract with their old contractor
• Bought all the wooden material from local market maharaja
wooden mart.
• Glass item from sardar estate
• Bathroom fittings from Surat
Availability of finance
personal capital 55% .
Quality control
For quality control - appointed a supervisor
One of the partners is civil engineer so he takes care of the site quality.
Labor control
• A firm has done a contract with labor contractor with different work
and as per the specialization, for e.g. they had a contract of labor with
Bhulabhai Marwadi, specialist like electrician Mayur Bhavsar, plumber
Bhikhabhai.
• They paid them sometime on the basis of daily basis or as per the
contract.
• They paid at least minimum wages if it is as per the day.
• Sometimes they face a problem in completing the project as per the
time promise or estimated because of labor would not work during
Holi festival,Diwali, the workers would not come so they arrange other
workers on the temporary basis so that work not get affected that
much.
• To review the performance of the workers the owner or one of the
responsible person is taking care so that the quality is not getting
affected.
Time control/ scheduled time
Time
Uncertainty
Material problem
Completion time
Estimated time
Conclusion
• The project of the firm is qualitative and low cost.
• But as they estimate the time to complete a project
it has exceeded the time because of uncertainty .
• so they should work on their schedule time.
Thank you